TechMD-IEC Module 1 Quiz

Total questions: 20

Worksheet time: 10mins

Name
Class
Date
1.

Alert Bulletin No. 5 is all about?

a)

No Clearance, No Work Policy

b)

PCB Switching Protocol During Emergency Condition

c)

The DOs and DON’Ts of Switching Operation of Power Circuit Breakers

d)

Information, Education and Communication

2.

What study/analysis is necessary to determine the PPE class to be used in operating or conducting maintenance on electrical equipment?

a)

Short Circuit Analysis

b)

System Analysis

c)

Arc Flash (AF) analysis

d)

None of the above

3.

What is TechMD's IEC ?

a)

International Electrotechnical Commission

b)

Integral Evaluation Comments

c)

Information, Evaluation and Correction

d)

Information, Education and Communication

4.

What is SOTF?

a)

Switch On To Fault

b)

Switch off to fault

c)

Sequence on to Fault

d)

None of the above

5.

Who is the authorized person to give clearance to non-NGCP personnel that will be working on 230/138kV  substation/installation?

a)

Vice President, FG

b)

Regional Head/ AVP Region

c)

District Head

d)

Substation Manager

6.

When should the pre-maintenance meeting be conducted for non-MP related activities?

a)

at least 5 days before the activity

b)

at least 7 days before the activity

c)

at least 2 days before the activity

d)

at least 1 day before the activity

7.

True or False. During emergency conditions, the SEOD can de energize the 69 kV lines with transmission function  and/or with connected generators

(a)  

8.

The equipment to be operated should be clear of all personnel for how far?

a)

20 meters

b)

60 meters

c)

30 meters

d)

90 meters

9.

The Revision 1 of the PM-CTO-12 focuses on?

a)

emergency conditions only

b)

all activities

c)

planned activities

d)

none

10.

What is Alert Bulletin No. 4 all about?

a)

“No Clearance, No work Policy Inside NGCP Facilities”

b)

PCB Switching Protocol During emergency Condition

c)

The DOs and DON’Ts of Switching Operation of Power Circuit Breakers

d)

PCB Switching protocol

11.

What do we call the amount of energy, at a prescribed distance from the equipment, generated during an electrical arc event?

a)

arc flash

b)

Kinetic Energy

c)

Potential energy

d)

Incident Energy

12.

What is PM-CTO-12 is all about?

a)

PCB Switching Protocol During Emergency Conditions

b)

PCB Switching Protocol

c)

Trial Operation

d)

All of the above

13.

What is the triggering event for the creation and issuance of Alert Bulletin No. 5?

a)

Tripping of Villanueva 100MVA T01 on 13 Apr 2020

b)

Tripping of Bayombong 100MVA T01 on 20 Feb 2022

c)

Amlan SS incident last 17 November 2019

d)

none of the above

14.

True or False. Is it ok to operate the PCB through its local control panel?

(a)  

15.

What are the requirements for the strict implementation of Alert Bulletin No. 5?

a)

Safety meeting only

b)

REQUIRED DOCUMENTS, PARTICIPATION IN SAFETY MEETING , ON-SITE SUPERVISION OF WORK, PROPER DISCLOSURE OF FUNCTIONS, RATINGS…

c)

Documentations

d)

Onsite supervision of work

16.

What are the two types of exposures?

a)

PHASE-TO-GROUND AND PHASE-TO-PHASE

b)

phase-to-ground

c)

phase-to-phase

d)

none of the above

17.

What is the PPE requirement for arc flash risk of 72kV to 500 kV?

a)

PPE Class 2

b)

PPE Class 1

c)

PPE Class 3

d)

PPE class 4

18.

The minimum approach distance phase-to-ground of 138 kV?

a)

1.30 meters

b)

1.50 meters

c)

1.75 meters

d)

2.0 meters

19.

What are the safety hazards/risks in doing line-to-line exposures?

a)

electrocution hazards

b)

arc flash hazard

c)

Arc flash and electrocution hazards

d)

all hazards

20.

What is the minimum approach distance phase-to-ground of 500 kV?

a)

1.3 meters

b)

5.07 meters

c)

2.3 meters

d)