1.

What does SMART goals stand for?

a)

Specific, Measurable, Achievable, Realistic, Time

b)

Specific, Manageable, Accessible, Realistic, Time

c)

Significant, Measurable, Achievable, Robust, Time

d)

Specific,Time, Measurable, Achievable, Realistic

2.

What are the usual constraints when planning a project? (3 answers)

a)

Time

b)

Budget

c)

Resources (software and hardware)

d)

House style

e)

Location

3.

One type of constraint is considering the 'regulations' What does this include? (3 answers)

a)

Data Protection Act

b)

Copyright Act

c)

Health and safety

d)

Logical protection methods

e)

Security - locking the computer room door

4.

1 type of constraint is the security/risk management. What does this include? (2 answers)

a)

Ensuring data cannot be deleted with use of Firewalls, encryption etc

b)

Locking doors/windows to rooms that contain secure data

c)

Providing milestones so that final product is given to the client on time

d)

Ensuring that dependencies between tasks are identified

5.

Planning tools include ..... (4 answers)

a)

Gantt charts

b)

Pert charts

c)

Flow charts

d)

Visualisation diagram

e)

Milestones

6.

A Gantt chart is ....

a)

A visual method of showing the proposed timing of each task needed to complete a project

b)

Uses circles, or rectangles, to represent tasks or milestones

c)

A rough drawing or sketch of what the final product will look like

d)

Is used to show the steps, decisions and outputs in a process, for example, how the discount on an order can be calculated.

7.

A PERT chart ....

a)

A visual method of showing the proposed timing of each task needed to complete a project

b)

Uses circles, or rectangles, to represent tasks or milestones

c)

A rough drawing or sketch of what the final product will look like

d)

Is used to show the steps, decisions and outputs in a process, for example, how the discount on an order can be calculated.

8.

Visualisation diagrams ....

a)

A visual method of showing the proposed timing of each task needed to complete a project

b)

Uses circles, or rectangles, to represent tasks or milestones

c)

A rough drawing or sketch of what the final product will look like

d)

Is used to show the steps, decisions and outputs in a process, for example, how the discount on an order can be calculated.

9.

A flow chart ....

a)

A visual method of showing the proposed timing of each task needed to complete a project

b)

Uses circles, or rectangles, to represent tasks or milestones

c)

A rough drawing or sketch of what the final product will look like

d)

Is used to show the steps, decisions and outputs in a process, for example, how the discount on an order can be calculated.

10.

What does dependency mean?

a)

A task that cannot be started until a previous, specified task has been completed

b)

Tasks which can be completed at the same time

c)

An allocation of time provided in case something goes wrong

11.

What does concurrent mean?

a)

A task that cannot be started until a previous, specified task has been completed

b)

Tasks which can be completed at the same time

c)

An allocation of time provided in case something goes wrong

12.

Contingency time - what is it?

a)

Time in a project plan that has no tasks assigned. This is used if tasks are not completed on time to make sure the project still meets the final deadline

b)

Time in a project when a task is expected to be started or completed

c)

Time in a project when you can make changes to text but retaining the original text so that changes can be seen

d)

Time in a project used to check to see whether the data being entered into a computer system is identical to the source from which it came

13.

Components of a Gantt chart...(2 answers)

a)

Date/days along the top

b)

Tasks down the left side

c)

Nodes/sub nodes

d)

Time/duration lines

14.

Components of a Pert chart...(2 answers)

a)

Date/days along the top

b)

Tasks down the left side

c)

Nodes/sub nodes

d)

Time/duration lines

15.

Components of a flow chart... (2 answers)

a)

Date/days along the top

b)

Tasks down the left side

c)

Start point / end point

d)

Decisions

e)

Images

16.

Components of a mind map... (2 answers)

a)

Keywords

b)

Tasks down the left side

c)

Start point / end point

d)

Decisions

e)

Images

17.

What software can be used to product a Gantt chart?

a)

Spreadsheet

b)

Database

c)

Desktop publishing software

d)

Word processor

18.

What software can be used to produce visualisation diagrams?

a)

Spreadsheet

b)

Database

c)

Desktop publishing software

19.

There are many different types of project management tools available. What are the advantages of using them? (2 answers)

a)

Real - time changes can be made

b)

Project plans can be shared electronically

c)

A lot of them are free or cheap to use

d)

All of them are easy to use

e)

Quick to set up

20.

There are many different types of project management tools available. What are the disadvantages of using them? (3 answers)

a)

Real - time changes can be made

b)

Project plans can be shared electronically

c)

A lot of them are expensive to purchase

d)

Some can be difficult to use

e)

Some can be time consuming to set up

21.

What does the term contingency mean?

a)

Time in a project plan that has no tasks assigned. Used if tasks are not completed on time.

b)

Shows what task is dependent on another, what task has to be completed before another can be completed

c)

The things needed to complete the project, could include software and hardware

d)

A given point in time when a task is expected to be started or completed

22.

What does the term workflow mean?

a)

Time in a project plan that has no tasks assigned. Used if tasks are not completed on time.

b)

Shows what task is dependent on another, what task has to be completed before another can be completed and which tasks can be completed at the same time.

c)

The things needed to complete the project, could include software and hardware

d)

A given point in time when a task is expected to be started or completed

23.

What does the term milestone mean?

a)

Time in a project plan that has no tasks assigned. Used if tasks are not completed on time.

b)

Shows what task is dependent on another, what task has to be completed before another can be completed and which tasks can be completed at the same time.

c)

The things needed to complete the project, could include software and hardware

d)

A given point in time when a task is expected to be started or completed

24.

What does the term resource mean?

a)

Time in a project plan that has no tasks assigned. Used if tasks are not completed on time.

b)

Shows what task is dependent on another, what task has to be completed before another can be completed and which tasks can be completed at the same time.

c)

The things needed to complete the project, could include software and hardware

d)

A given point in time when a task is expected to be started or completed

25.

Identify TWO tasks that are carried out during the planning phase

a)

Define constraints

b)

Create test plans

c)

Produce user documentation

d)

Test the final product

26.

Identify the phase of the project life cycle in which user documentation is created

a)

Initiation

b)

Planning

c)

Execution

d)

Evaluation

27.

What are 2 advantages of following a project life cycle

a)

Provides a structured approach and allows everyone to see how project is progressing

b)

There are defined inputs and outputs for each phase

c)

It will mean that you will never run out of money or time

d)

You won't have to return to a phase once it has been completed or you have moved on to the next phase

28.

What are the implications to a project if the project life cycle is not followed?

a)

You could go over budget

b)

Product may not be issued to client on time

c)

The final product may not meet the needs of the client

d)

The final product will meet the needs of the client

29.

Which phase/s interacts with the planning phase?

a)

Initiation

b)

Execution

c)

Evaluation

30.

Which phase/s interacts with the initiation phase?

a)

Planning

b)

Execution

c)

Evaluation

31.

Which phase/s interacts with the evaluation phase?

a)

Planning

b)

Execution

c)

Initiation

32.

Identify TWO user constraints

a)

Timescale: how long the project should take, including the start and end dates

b)

Budget: the amount of money that can be spent during the project to complete and install the product.

c)

Deliverable product

d)

A user guide showing how to use the product.

33.

Identify one input into the evaluation stage

a)

Deliverable product

b)

Test plan

c)

List of constraints

d)

List of user requirements

34.

A user guide is one type of user documentation which may be created during the evaluation stage. Identify two other types of user documentation

a)

An installation guide, which could be used in the future if the product needs to be reinstalled.

b)

Test plans showing the results of tests carried out both during creation and after the product had been completed

c)

Security details which will show the built-in security and how to set up, for example, new users with access details

d)

A gantt chart showing a list of tasks and when each will be completed within the time

35.

You are working on a project and need to set milestones, in which phase of the project life cycle would this task be carried out?

a)

Initiation

b)

Planning

c)

Execution

d)

Evaluation

36.

You are releasing a deliverable product to a client, in which phase of the project life cycle would this task be carried out?

a)

Initiation

b)

Planning

c)

Execution

d)

Evaluation

37.

What is meant by interaction?

a)

How the phases like together

b)

The repeating of a phase

38.

Identify 1 INPUT in the initiation phase

a)

User requirements

b)

Project plan

c)

Phase review

d)

Test results

39.

Identify 2 OUTPUTS in the initiation phase

a)

User requirements

b)

Project plan

c)

Phase review

d)

Feasibility report

40.

A client needs to have a deliverable product by the end of March. What type of constraint is this?

a)

It's not a constraint

b)

It's a time constraint

c)

It's a resource constraint

d)

It's a budget constraint

41.

What are Smart Objectives?

a)

Specific, Measurable, Achievable, Realistic, Time Efficient

b)

Specialised, Measurable, Advantageous, Realistic, Time Memorial

c)

Standardised, Measured, Achievable, Realistic, Timed

d)

Specific, Modern, Anachronistic, Realistic, Time Efficient

42.

The stages of the project life cycle are...

a)

Initiation, Planning, Execution, Evaluation

b)

Invitation, Planning, Elimination, Evaluation

c)

Initiation, Preposition, Execution, Eradication

d)

Initiation, Planning, Execution, Erosion

43.

Initiation is when...

a)

You receive instruction from your client (a brief) and you establish what it is that they want.

b)

You get to work on building a product.

c)

You examine the progress made so far and evaluate what to do next.

d)

You create diagrams and mind maps of what it is the project will involve.

44.

Planning is where...

a)

You create diagrams and prototypes for what you are going to build, in addition to working out how much time the project will take.

b)

You create the product and refine it as you go along.

c)

You analyse how well the product has been made so far and then draw up a set of features that it must now include.

d)

You reflect on the product once it has been completed and draw up a list of things it must also contain.

45.

Execution is...

a)

When you build a product.

b)

When you create diagrams and time charts in order to plan out exactly how and when a project will be made.

c)

When you analyse how well the project has gone so far, and decide what you could do to improve it.

d)

When you look at other products similar to the one you are making, and decide which features you are going to include in yours.

46.

Evaluation is...

a)

Where you reflect on how well a project has gone, and what could be done to improve further.

b)

Where you investigate other products, similar to the one you are going to make, and decide what features you could use in your own.

c)

Where you plan exactly what to include in a product and how long the project will take.

d)

Where you produce the actual product. Evaluation is just another word for getting on with it.

47.

Success Criteria Is

a)

A checklist of things a finished product must include and be able to do; so that it is an overall success.

b)

A criteria to judge a rival product against, so that we do not make the same mistakes.

c)

A criteria for success. It is something that must not be included in a product if we want it to be successful.

d)

The steps taken to successfully completing a project e.g. Plan the product first, build the base, apply a coat of paint etc.

48.

What is a GANTT chart.

a)

A chart that shows each task that must be taken in order to complete a project. They are mapped against a timescale and coloured bars are put on the chart to show at which point each task will be completed.

b)

A chart that shows each task that must be taken in order to complete a project. They are linked to one another in terms of what must be completed first in order for other tasks to be completed.

c)

A chart that shows the whereabouts of the mighty GANTT, a creature once believed to be extinct.

d)

A chart that shows how productive each stage of the product life cycle has been. These are useful for making sure the team is more efficient in the future.

49.

What is a PERT chart.

a)

A chart that shows each task that must be taken in order to complete a project. They are mapped against a timescale and coloured bars are put on the chart to show at which point each task will be completed.

b)

A chart that shows each task that must be taken in order to complete a project. They are linked to one another in terms of what must be completed first in order for other tasks to be completed.

c)

A chart that shows the whereabouts of the mighty PERT, a creature once believed to be extinct.

d)

A chart that shows how productive each stage of the product life cycle has been. These are useful for making sure the team is more efficient in the future.

50.

Why is it important to ask a client questions before starting work on a project?

a)

The client might have not provided enough information about their requirements and further questions help you build a bigger picture about what is required.

b)

The client might have given you the wrong information and you need to check with them in order to correct their mistakes.

c)

The client will want you to demonstrate how well you understand their brief by asking clever questions to prove this.

d)

The questions need to be asked to demonstrate legally that you have considered alternatives.

51.

What are the four stages of the Project Life Cycle?

a)

Initiation, Planning, Execution, Evaluation

b)

Infiltration, Planning, Enactment, Evolution

c)

Initiation, Execution, Preparation, Evolution

d)

Planning, Doing, Review, Doing

52.

What does Initiation mean?

a)

Finding out what is required

b)

Working out a timescale and preparing an idea for what to do

c)

Actually getting on with it

d)

Looking back at the work, identifying what went well and what could be improved.

53.

What does planning mean?

a)

Finding out what is required

b)

Working out a timescale and preparing an idea for what to do

c)

Actually getting on with it

d)

Looking back at the work, identifying what went well and what could be improved.

54.

What does execution mean?

a)

Finding out what is required

b)

Working out a timescale and preparing an idea for what to do

c)

Actually getting on with it

d)

Looking back at the work, identifying what went well and what could be improved.

55.

What does evaluation mean?

a)

Finding out what is required

b)

Working out a timescale and preparing an idea for what to do

c)

Actually getting on with it

d)

Looking back at the work, identifying what went well and what could be improved.

56.

What is the overall name given to the four stages of initiation, planning, execution and evaluation?

a)

The project life cycle

b)

The task management cycle

c)

The task completion cycle

d)

The project management sequence

57.

Project goals are important to measure how well a project is progressing. Goals need to be

a)

S-M-A-R-T

b)

C-L-E-A-R

c)

O-R-I-G-I-N-A-L

d)

F-I-N-I-S-H-E-D

58.

"I will complete this project by the end of June." This is an example of which S-M-A-R-T goal?

a)

Specific

b)

Measurable

c)

Relevant

d)

Time-bound

59.

As part of the planning stage of the project life cycle, we look at tasks, milestones, resources and contingencies. Which of these is an example of a contingency?

a)

We will need to use presentation software to create a slideshow.

b)

We will need to design a slideshow including various items of data, including text and images.

c)

We will complete the slideshow by the end of June.

d)

We will need to take regular backups to use in case the original presentation file is corrupted.

60.

There are various risks which need to be mitigated in case of private/personal data being used. To mitigate the risk of unauthorised access to private/personal data, we can...

a)

Make multiple copies of the data

b)

Restrict access through the use of password-protected files

c)

Only have one copy of the data

d)

Only use spreadsheets

61.

An iterative review occurs

a)

At the end of the project life cycle

b)

At the end of every phase of the project life cycle

c)

At the end of the first three phases of the project life cycle

d)

At the end of the initation phase of the project life cycle only

62.

A Gantt chart or other planning tool would be created at which stage of the project life cycle?

a)

Initiation

b)

Planning

c)

Execution

d)

Evaluation

63.

User requirements would be noted down at which stage of the project life cycle?

a)

Initiation

b)

Planning

c)

Execution

d)

Evaluation

64.

Which of these planning tools would NOT normally include a 'time' aspect or element?

a)

Gantt chart

b)

PERT chart

c)

Mind map

d)

Visualisation diagram

65.

This is an example of a

a)

Gantt chart

b)

PERT chart

c)

Visualisation diagram

d)

Mind map

66.

From this table of 'access rights' - which person has the least access rights?

a)

Alex

b)

Mark

c)

Tina

d)

Tom

67.

Yes/no... or True/False data examples are known as

a)

Boolean data types

b)

Text data types

c)

Limited choice data types

d)

Object data types

68.

One feature of spreadsheet software whch makes it suitable for storing data is

a)

spreadsheet software can do calculations

b)

spreadsheet software can layout data in rows and columns

c)

spreadsheet software can include macros

d)

spreadsheet software can be used to store slideshows

69.

This is a picture of what kind of device?

a)

Input device

b)

Output device

c)

Backing storage device

d)

Spreadsheet

70.

This is an example of which data validation check?

a)

Presence check

b)

Format check

c)

Range check

d)

Length check

71.

Barcodes are scanned and read by

a)

A built-in radio sensor scanning the barcode

b)

A magnetic sensor being attracted or repelled depending on white (non-magnetic) or black (magnetic) vertical stripes

c)

Light being reflected or not reflected depending on white and black stripes

d)

A picture being taken of the barcode by the hand-held scanner

72.

This image represents systems used by companies for

a)

customer loyalty schemes

b)

secondary research methods

c)

questionnaires/surveys

d)

sensors

73.

For an organisation holding personal data - which one of the following does NOT apply?

a)

Personal data should be held only for as long as is necessary

b)

Personal data should be kept as it was when originally taken (with no updates)

c)

Personal data should be kept secure, behind passwords and firewalls

d)

Personal data should be deleted when no longer needed for use

74.

Which one of the following would most likely make use of real-time data?

a)

student yearly attendance figures

b)

annual overall sales figures for a company

c)

student photography website

d)

traffic websites

75.

The [Import Sheets] button, when clicked, will import some data. This is an example of use of a

a)

formula

b)

macro

c)

data check

d)

graphing task

76.

What is a GANTT chart.

a)

A chart that shows each task that must be taken in order to complete a project. They are mapped against a timescale and coloured bars are put on the chart to show at which point each task will be completed.

b)

A chart that shows each task that must be taken in order to complete a project. They are linked to one another in terms of what must be completed first in order for other tasks to be completed.

c)

A chart that shows the whereabouts of the mighty GANTT, a creature once believed to be extinct.

d)

A chart that shows how productive each stage of the product life cycle has been. These are useful for making sure the team is more efficient in the future.

77.

What is a PERT chart.

a)

A chart that shows each task that must be taken in order to complete a project. They are mapped against a timescale and coloured bars are put on the chart to show at which point each task will be completed.

b)

A chart that shows each task that must be taken in order to complete a project. They are linked to one another in terms of what must be completed first in order for other tasks to be completed.

c)

A chart that shows the whereabouts of the mighty PERT, a creature once believed to be extinct.

d)

A chart that shows how productive each stage of the product life cycle has been. These are useful for making sure the team is more efficient in the future.

78.

Evaluation is...

a)

Where you reflect on how well a project has gone, and what could be done to improve further.

b)

Where you investigate other products, similar to the one you are going to make, and decide what features you could use in your own.

c)

Where you plan exactly what to include in a product and how long the project will take.

d)

Where you produce the actual product. Evaluation is just another word for getting on with it.

79.

What does the term milestone mean?

a)

Time in a project plan that has no tasks assigned. Used if tasks are not completed on time.

b)

Shows what task is dependent on another, what task has to be completed before another can be completed and which tasks can be completed at the same time.

c)

The things needed to complete the project, could include software and hardware

d)

A given point in time when a task is expected to be started or completed

80.

Identify TWO tasks that are carried out during the planning phase

a)

Define constraints

b)

Create test plans

c)

Produce user documentation

d)

Test the final product

81.

Identify the phase of the project life cycle in which user documentation is created

a)

Initiation

b)

Planning

c)

Execution

d)

Evaluation

82.

What are 2 advantages of following a project life cycle

a)

Provides a structured approach and allows everyone to see how project is progressing

b)

There are defined inputs and outputs for each phase

c)

It will mean that you will never run out of money or time

d)

You won't have to return to a phase once it has been completed or you have moved on to the next phase

83.

Identify TWO user constraints

a)

Timescale: how long the project should take, including the start and end dates

b)

Budget: the amount of money that can be spent during the project to complete and install the product.

c)

Deliverable product

d)

A user guide showing how to use the product.

84.

You are working on a project and need to set milestones, in which phase of the project life cycle would this task be carried out?

a)

Initiation

b)

Planning

c)

Execution

d)

Evaluation

85.

You are releasing a deliverable product to a client, in which phase of the project life cycle would this task be carried out?

a)

Initiation

b)

Planning

c)

Execution

d)

Evaluation

86.

A client needs to have a deliverable product by the end of March. What type of constraint is this?

a)

It's not a constraint

b)

It's a time constraint

c)

It's a resource constraint

d)

It's a budget constraint

87.

Integrated documents are...

a)

Documents that work together

b)

People that work together

c)

Working collaboratively

d)

Documents within other documents

88.

An example of an integrated document is...

a)

Two people working on the same document at the same time

b)

Two people working on the same document from different locations

c)

Using Excel to create a graph in PowerPoint

d)

Copy and pasting images from the internet into your work

89.

Which of the following is an example of VoIP

a)

Skype

b)

Facebook

c)

TV

d)

Presentation

90.

What type of software allows the creation of Queries and Reports?

a)

Desktop Publishing

b)

Word Processing

c)

Spreadsheet

d)

Database

91.

What type of software allows the use of Functions and Formulae?

a)

Desktop Publishing

b)

Word Processing

c)

Spreadsheet

d)

Database

92.

What resources must be considered when distributing information (Tick all that apply).

a)

Hardware

b)

Software

c)

Connectivity

d)

Demographics

93.

What does the image show?

a)

An RFID tag

b)

A barcode

c)

A QR code

d)

An NFC code

94.

What type of data is this?


01825-764844

a)

Number

b)

Text

c)

Alphanumeric

d)

Raw

95.

Which of these dates comply with this validation rule?


LIKE DD/MM/YY

a)

11/06/2018

b)

06/11/18

c)

23/04/18

d)

04/23/18

96.

Which of these is NOT a Boolean?

a)

Yes/No

b)

1,0

c)

TRUE FALSE

d)

M,F,Other

97.

Which of these is NOT an advantage of consumer panels?

a)

They are easy to set up

b)

It is possible to observe facial expressions

c)

It is possible to target specific demographics

d)

It is possible to ask follow up questions

98.

Which of these is an example of a Loyalty Scheme?

a)

Tesco Clubcard

b)

Queensmead Student ID Card

c)

National Trust Membership Card

d)

Kidney Donor Card

99.

What is data?

a)

A formula for converting information.

b)

Raw facts and figures before they have been processed.

c)

Information in context.

d)

Processed information.

100.

What are the advantages of the use of sensors to collect information?

a)

Once set up do not need human intervention.

b)

Need for external power.

c)

Information can be sent electronically.

d)

Processing information can be quick.

101.

Define Data

a)

Information that has a structured approach

b)

Everything electronic

c)

Raw facts and figures

d)

Meaning + Structure + Context

102.

Which of these is the data type Real?

a)

500

b)

50/51

c)

500.02

d)

5%

103.

Which of the following is a method of wearable technology?

a)

RFID

b)

Apple watch

c)

Sensors

d)

Tablet

104.

What type of data is the following "1960"

a)

Integer

b)

Alphanumeric

c)

Currency

d)

Real

105.

Big Data is...

a)

A lot of data that needs analysing

b)

Data so large that it cannot be analysed using conventional methods

c)

So much data that it would be impossible to analyse

d)

Lots of irrelevant data