WorksheetsULTIMATE SPP QUIIZ
Total questions: 76
Worksheet time: 40mins
The architect's responsibilities in relation to the people: He shall not use ____ advertisement, nor use self-laudatory, exaggerated, or misleading publicity.
Free
Paid
Sponsored
Remunerated
The architect's responsibilities in relation to his/her client: The Architect's honesty of purpose must be beyond reproach; he/she acts as ___________ to his/her client.
Mediator
Professional Adviser
Representative
Manager
The architect's responsibilities in relation to the contractor: He shall promptly inspect each phase of the work completed and if found according to the terms of the Contract Documents, issue the ___________________, respectively, to the Contractor
Certificates of Payment
Compensation
Final Certificate of Completion
Both Certificates of Payment and Final Certificate of Completion
A Firm is a for -profit business organization, such as a corporation,
limited liability company or partnership that provides professional services.
TRUE
FALSE
The Architect in this area of practice engages in methods of producing building components in a highly engineered, efficient, and cost-effective manner, particularly for residential and commercial applications
Building systems design
Security evaluation and planning
Facilities maintenance support
Building testing and commissioning
It establishes a fixed sum over and above reimbursement for the Architect's technical time and overhead. An agreement on the general scope of the work is necessary in order to set an equitable fee.
Professional fee plus expenses
Lump sum or fixed fee
Multiple of direct personnel expense
Standards of Professional Practice (SPP) on Design-Build Services
SPP Document 205
SPP Document 207
SPP Document 206
SPP Document 204-B
The Consulting Architect in this area of practice must have much more than the basic knowledge of pre-construction, construction, post-construction and the other services under SPP Documents 204, 206, and 207
Preliminary services
Contract documentation and review services
Post-design services (including construction services)
Standards of Professional Practice (SPP) on Professional Architectural Consulting Services (PACS)
SPP Document 209
SPP Document 208
SPP Document 210
SPP Document 207
The Architect in this area of practice recommends the systematic process of ensuring that a building's array of systems is planned, designed, installed and tested to perform according to the design intent and the building's operational needs.
Building systems design
Security evaluation and planning
Facilities maintenance support
Building testing and commissioning
Involves the detailed planning and design of light transmission, timing, and control for compatibility with the architectural design concept
Architectural lighting layout and design services
Lights and design services
Natural lighting layout services
Acoustic design services
The Consulting Architect in this area of practice must have much more than the basic knowledge of building materials and finishes, construction methodologies, building envelopes including cladding and roofing systems, architectural fenestrations and architectural hardware, fixtures and fittings
Building components
Management of architectural practices
Special building / facility planning and design
Dispute avoidance and resolution
The architect's responsibilities in relation to manufacturers, dealers, and agents: He shall not solicit ________ services from manufacturers or suppliers of building materials or equipment when these are accompanied by an obligation detrimental to the best interest of the Client, or which may adversely affect the Architect's professional opinion.
Complimentary
Free
Technical
Paid
The architect's responsibilities in relation to his/her colleagues: He shall not render professional services without a __________. He/she shall neither offer nor provide preliminary services on a conditional basis prior to definite agreement with the Client for the commission of the project.
Service agreement
Contract
Verbal agreement
General condition
Standards of Professional Practice (SPP) on Regular Design Services
SPP Document 200
SPP Document 201
SPP Document 202
SPP Document 203
SPP DOC 204 - A
PRE-DESIGN SERVICES (12)
REGULAR DESIGN SERVICES (RDS) (6)
SPECIALIZED ARCHITECTURAL SERVICES (23)
FULL-TIME SUPERVISION SERVICES
College classroom buildings, convention halls, detention facilities, extended care projects, gymnasiums, laboratories, medical offices.
Group 1
Group 2
Group 3
Group 4
The body formed by the Owner and approved by the Professional Advisor to assist the Professional Advisor and the Jury in the administrative conduct of the ADC
Professional body
Technical advisor
Competition secretariat
The last phase in a Design-Build Service
Construction Phase
Post Construction Training
Bidding Document Phase
Occupancy Permitting Phase
Where the Architect is engaged to render opinion or give advice, clarifications or explanation on technical matters pertaining to his profession, the chargeable RPF shall not be less than __________ per hour.
1,000
2,000
3,000
4,000
When the suspension of construction exceeds a period of _______, the fee for the remaining works shall be doubled.
3 months
6 months
1 year
2 years
Additional service done by architects in design build
Post construction training
Construction administration
Bidding phase
Occupancy permitting phase
Extra copies of contract documents are chargeable to ____
Owner
Architect
Bidder
Contractor
A voluntary dispute resolution process in which one or more persons appointed to render an award, appointed in accordance with the agreement of the parties, or rules promulgated pursuant to this Act, resolve a dispute by rendering an award.
Arbitration
Mediation
Conciliation
Early Neutral Evaluation
Who issues the CEI?
OBO
Professional Electrical Engineer
Master Electrician
Meralco
Which is not included in the scope of services of Building and Facilities Administration?
Building Maintenance
Grounds and Landscaping Supervision
Post Construction Evaluation
Building Equipment Maintenance
In this post-construction service, the architect evaluates the initial design program against the actual use of the facility
Post Construction Evaluation
Building Maintenance
Building Appraisal
Building Utilization Study
When the owner hires an architect or a firm to coordinate the whole range of Comprehensive Architectural Services, this constitutes
Project Management
Project Coordination
Comprehensive Architectural Services
Construction Management e. Architectural Services Coordi
How many years of experience in building design and construction are required before one may become a Building Official?
2 years
5 years
6 years
10 years
The administration and enforcement of the provisions of the National Building Code and its IRR, including the imposition of penalties for administrative violations thereof, is vested in whom?
The Building Official
The Secretary of the DPWH
The Secretary of the DILG
The members of the Board
8. The new Architect’s Credo was adopted and promulgated through Professional Regulatory Board of Architecture Resolution No. ____, Series of 2018.
99
2
5
88
. Which section of RA 9266 provides that a duly licensed architect shall affix the seal prescribed by the Board bearing the registrant’s name, registration number and title “Architect” on all architectural plans, drawings, specifications, and all other contract documents prepared by or under his/her direct supervision?
Section 10
Section 15
Section 20
Section 17
Which method of compensation is frequently used when there is a continuing relationship on a series of projects?
Professional fee plus expenses
Lump sum or fixed fee
Per diem
MDPE
The character of occupancy of existing buildings may be changed subject to the approval of the Building Official and provided the new or proposed use is _____ than the existing use.
Less hazardous
Equally hazardous
More hazardous
Equally or less hazardous
When the project is not yet executed, what happens to the intellectual property of the architect over the design/drawings?
The intellectual property for the design does not exist until the project is built
The intellectual property for the design is the owner’s until the project is built
The intellectual property for the design remains the same because the construction of the project is irrelevant to intellectual property
The intellectual property for the design is still the architect’s because it only becomes the owner’s AFTER the project is built
Architect Arno, a member of the PRBOA, had to resign from his post due to health reasons after having served for a full year. Architect Hector was appointed to replace Architect Arno. How many years shall Architect Hector serve?
4 years
3 years
2 years
1 year
Which body has the power to hear and decide administrative cases involving violations of RA 9266 and to issue subpoenas to secure witnesses and produce documents in connection with such administrative cases?
The UAP
The PRBOA
The PRC
The Regional Trial Court
This method of compensation is a variation of the percentage based on project construction cost. The remuneration under this method is based on cost per square meter of the project, which may be derived from historical data on the average construction cost per square meter of a similar project.
Rough Estimation
Unit Cost Method
Value-Based Pricing
Professional Fee Plus Expenses
This method of compensation is typically used for services which are not well-defined, partial services, and additional services.
Lump Sum
Time-Based Fees
Unit Cost Method
Value-Based Pricing
. In the multiple of direct personnel expenses method of compensation, a multiplier is used to arrive at the professional fee to be charged to the client. Which is NOT an acceptable multiplier to be used in such a computation?
1.50
2.00
2.50
3.00
According to UAP Doc. 301, when should the contract time begin to run as a general rule?
7 days after the contractor receives the Notice to Proceed
On the day the contractor receives the Notice to Proceed
15 days after the agreement between the owner and the contractor is signed
On the day the contractor is able to mobilize
In a design-build arrangement with a guaranteed maximum project construction cost, the PCC is guaranteed by the architect to not exceed ___ of the estimated PCC.
5%
10%
15%
None of the above
How soon may the Board reinstate a revoked Certificate of Registration?
6 months after revocation
1 year after revocation
2 years after revocation
3 years after revocation
Foreign nationals who wish to render architectural services in the Philippines must first secure a special/temporary permit. Where will they obtain this special/temporary permit?
From the UAP, subject to approval by the PRBOA
From the UAP, subject to approval by the PRC
From the PRBOA, subject to approval by the PRC
From the PRBOA, subject to approval by the UAP
For competitive bidding/procurement, the architect furnishes complete sets of the bid documents for purposes of bidding in as many sets as may be required to conduct a successful bidding. These documents are paid in what way?
Free by architect
Included in the service of the architect
On loan to owner
On loan to the bidders
Who is the Legal Adviser of the PRBArch and its RA 9266?
Supreme Court judge
Professional Regulatory Commission
Court of Appeals
DJ Khaled
A returning Filipino Architect who is registered outside of the Philippines is going to have a project here in the Philippines. He applied for a TSP in the PRBArch and aside from securing the permit, what other document should he secure?
Professional ID
Liability insurance
CoR
UAP membership
The occupancy permit after application must be issued to the applicant within how many days
15
30
60
120
In the case of the non- issuance, suspension or revocation of permits, the applicant/permittee may file an appeal with whom?
DPWH Secretary
Mayor
Building Official
MMDA
In the case of the non- issuance, suspension or revocation of permits, the applicant/permittee may file an appeal. Within how many days must the appeal be responded to or acted upon?
15
30
60
120
To whom is the Building Permit granted?
Architect
Owner
Contractor
Engineer
This method of remuneration is used when the services of a Professional Consulting Architect (PCA) is expected to be required at intervals over a period of time
CoR
Retainer
Lump Sum
PFPE
GROUP 1 DAEDS (SIMPLEST UTILIZATION)
5%
6%
7%
4%
GROUP 2 DAEDS (MODERATE COMPLEXITY)
5%
6%
7%
4%
GROUP 3 DAEDS (EXCEPTIONAL CHARACTER)
5%
6%
7%
4%
GROUP 4 DAEDS (RESIDENTIAL)
10%
12%
100%
6%
GROUP 5 DAEDS (MONUMENTAL)
10%
12%
100%
6%
GROUP 6 DAEDS (REPETITIVE CONS.) 1ST BUILDING
10%
12%
100%
6%
GROUP 6 DAEDS (REPETITIVE CONS.) 2ND BUILDING
50%
40%
100%
30%
GROUP 6 DAEDS (REPETITIVE CONS.) 3RD BUILDING
50%
40%
100%
30%
GROUP 7 DAEDS (HOUSING PROJECT) 1ST UNIT
50%
10%
100%
30%
GROUP 8 DAEDS (INTERIORS)
15%
10%
100%
30%
GROUP 9 DAEDS (ALTERATIONS)
60-100%
50-150%
50-120%
DJ KHALED %
Vvhere the Architect is engaged to render opinion or give advice, clarilications or explanation on technical matters pertaining to his profession, (also refer to Pre-Design Services SPP Doc. 201 under Consultation) the chargeable RPF shall not be less than
1000
2000
3000
4000
when rendering services as an expert witness, the Architect's fee shall not be less than
5000
2000
3000
4000
(GROUP 10) Another sixty percent (60%) of the amount shall be charged for the travel period in cese of locations that are in excess of
100km
150km
200km
50km
Upon signing of the Service Agreement, An amount equivalent to ____ of the agreed Professional Fee shall be paid by the Owner
10%
15%
5%
6%
Upon completion and submission of the documents under Schematic Design Phase,the Owner shall pay the Architect a sum equal to
10%
15%
20%
5%
Upon completion and submission of the documents under Design Development Phase,the Owner shall pay the Architect a sum equal to
10%
15%
20%
5%
Upon completion and submission of the documents under Contract Document Phase,the Owner shall pay the Architect a sum equal to
50%
40%
20%
90%
____ percent for Architect's Liability under the Civil Code
5%
10%
3%
6%
PROGRESS BILLING OF SPP 203 (SPECIALIZED ARCHITECTURAL SERVICES)
____% of the fee upon submission of the preliminary design?
30%
50%
60%
15%
PROGRESS BILLING OF SPP 203 (SPECIALIZED ARCHITECTURAL SERVICES)
____% of the fee upon submission of the final design?
30%
50%
60%
15%
PROGRESS BILLING OF SPP 203 (SPECIALIZED ARCHITECTURAL SERVICES)
____% of the fee upon completion of project?
30%
50%
60%
15%
The Recommended Professional Fee (RPF) for Fulltime Construction Supervision Services is
1-2%
1-1.5%
1.5-2%
GOD DID%
The services of the Architect as Construction Manager can be compensated by a Recommended Professional Fee (RPF) of
1-2%
1-1.5%
1.5-3%
GOD DID%