wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

ULTIMATE SPP QUIIZ

Total questions: 76

Worksheet time: 40mins

Name
Class
Date
1.

The architect's responsibilities in relation to the people: He shall not use ____ advertisement, nor use self-laudatory, exaggerated, or misleading publicity.

a)

Free

b)

Paid

c)

Sponsored

d)

Remunerated

2.

The architect's responsibilities in relation to his/her client: The Architect's honesty of purpose must be beyond reproach; he/she acts as ___________ to his/her client.

a)

Mediator

b)

Professional Adviser

c)

Representative

d)

Manager

3.

The architect's responsibilities in relation to the contractor: He shall promptly inspect each phase of the work completed and if found according to the terms of the Contract Documents, issue the ___________________, respectively, to the Contractor

a)

Certificates of Payment

b)

Compensation

c)

Final Certificate of Completion

d)

Both Certificates of Payment and Final Certificate of Completion

4.

A Firm is a for -profit business organization, such as a corporation,

limited liability company or partnership that provides professional services.

a)

TRUE

b)

FALSE

5.

The Architect in this area of practice engages in methods of producing building components in a highly engineered, efficient, and cost-effective manner, particularly for residential and commercial applications

a)

Building systems design

b)

Security evaluation and planning

c)

Facilities maintenance support

d)

Building testing and commissioning

6.

It establishes a fixed sum over and above reimbursement for the Architect's technical time and overhead. An agreement on the general scope of the work is necessary in order to set an equitable fee.

a)

Professional fee plus expenses

b)

Lump sum or fixed fee

c)

Multiple of direct personnel expense

7.

Standards of Professional Practice (SPP) on Design-Build Services

a)

SPP Document 205

b)

SPP Document 207

c)

SPP Document 206

d)

SPP Document 204-B

8.

The Consulting Architect in this area of practice must have much more than the basic knowledge of pre-construction, construction, post-construction and the other services under SPP Documents 204, 206, and 207

a)

Preliminary services

b)

Contract documentation and review services

c)

Post-design services (including construction services)

9.

Standards of Professional Practice (SPP) on Professional Architectural Consulting Services (PACS)

a)

SPP Document 209

b)

SPP Document 208

c)

SPP Document 210

d)

SPP Document 207

10.

The Architect in this area of practice recommends the systematic process of ensuring that a building's array of systems is planned, designed, installed and tested to perform according to the design intent and the building's operational needs.

a)

Building systems design

b)

Security evaluation and planning

c)

Facilities maintenance support

d)

Building testing and commissioning

11.

Involves the detailed planning and design of light transmission, timing, and control for compatibility with the architectural design concept

a)

Architectural lighting layout and design services

b)

Lights and design services

c)

Natural lighting layout services

d)

Acoustic design services

12.

The Consulting Architect in this area of practice must have much more than the basic knowledge of building materials and finishes, construction methodologies, building envelopes including cladding and roofing systems, architectural fenestrations and architectural hardware, fixtures and fittings

a)

Building components

b)

Management of architectural practices

c)

Special building / facility planning and design

d)

Dispute avoidance and resolution

13.

The architect's responsibilities in relation to manufacturers, dealers, and agents: He shall not solicit ________ services from manufacturers or suppliers of building materials or equipment when these are accompanied by an obligation detrimental to the best interest of the Client, or which may adversely affect the Architect's professional opinion.

a)

Complimentary

b)

Free

c)

Technical

d)

Paid

14.

The architect's responsibilities in relation to his/her colleagues: He shall not render professional services without a __________. He/she shall neither offer nor provide preliminary services on a conditional basis prior to definite agreement with the Client for the commission of the project.

a)

Service agreement

b)

Contract

c)

Verbal agreement

d)

General condition

15.

Standards of Professional Practice (SPP) on Regular Design Services

a)

SPP Document 200

b)

SPP Document 201

c)

SPP Document 202

d)

SPP Document 203

16.

SPP DOC 204 - A

a)

PRE-DESIGN SERVICES (12)

b)

REGULAR DESIGN SERVICES (RDS) (6)

c)

SPECIALIZED ARCHITECTURAL SERVICES (23)

d)

FULL-TIME SUPERVISION SERVICES

17.

College classroom buildings, convention halls, detention facilities, extended care projects, gymnasiums, laboratories, medical offices.

a)

Group 1

b)

Group 2

c)

Group 3

d)

Group 4

18.

The body formed by the Owner and approved by the Professional Advisor to assist the Professional Advisor and the Jury in the administrative conduct of the ADC

a)

Professional body

b)

Technical advisor

c)

Competition secretariat

19.

The last phase in a Design-Build Service

a)

Construction Phase

b)

Post Construction Training

c)

Bidding Document Phase

d)

Occupancy Permitting Phase

20.

Where the Architect is engaged to render opinion or give advice, clarifications or explanation on technical matters pertaining to his profession, the chargeable RPF shall not be less than __________ per hour.

a)

1,000

b)

2,000

c)

3,000

d)

4,000

21.

When the suspension of construction exceeds a period of _______, the fee for the remaining works shall be doubled.

a)

3 months

b)

6 months

c)

1 year

d)

2 years

22.

Additional service done by architects in design build

a)

Post construction training

b)

Construction administration

c)

Bidding phase

d)

Occupancy permitting phase

23.

Extra copies of contract documents are chargeable to ____

a)

Owner

b)

Architect

c)

Bidder

d)

Contractor

24.

A voluntary dispute resolution process in which one or more persons appointed to render an award, appointed in accordance with the agreement of the parties, or rules promulgated pursuant to this Act, resolve a dispute by rendering an award.

a)

Arbitration

b)

Mediation

c)

Conciliation

d)

Early Neutral Evaluation

25.

Who issues the CEI?

a)

OBO

b)

Professional Electrical Engineer

c)

Master Electrician

d)

Meralco

26.

Which is not included in the scope of services of Building and Facilities Administration?

a)

Building Maintenance

b)

Grounds and Landscaping Supervision

c)

Post Construction Evaluation

d)

Building Equipment Maintenance

27.

In this post-construction service, the architect evaluates the initial design program against the actual use of the facility

a)

Post Construction Evaluation

b)

Building Maintenance

c)

Building Appraisal

d)

Building Utilization Study

28.

When the owner hires an architect or a firm to coordinate the whole range of Comprehensive Architectural Services, this constitutes

a)

Project Management

b)

Project Coordination

c)

Comprehensive Architectural Services

d)

Construction Management e. Architectural Services Coordi

29.

How many years of experience in building design and construction are required before one may become a Building Official?

a)

2 years

b)

5 years

c)

6 years

d)

10 years

30.

The administration and enforcement of the provisions of the National Building Code and its IRR, including the imposition of penalties for administrative violations thereof, is vested in whom?

a)

The Building Official

b)

The Secretary of the DPWH

c)

The Secretary of the DILG

d)

The members of the Board

31.

8. The new Architect’s Credo was adopted and promulgated through Professional Regulatory Board of Architecture Resolution No. ____, Series of 2018.

a)

99

b)

2

c)

5

d)

88

32.

. Which section of RA 9266 provides that a duly licensed architect shall affix the seal prescribed by the Board bearing the registrant’s name, registration number and title “Architect” on all architectural plans, drawings, specifications, and all other contract documents prepared by or under his/her direct supervision?

a)

Section 10

b)

Section 15

c)

Section 20

d)

Section 17

33.

Which method of compensation is frequently used when there is a continuing relationship on a series of projects?

a)

Professional fee plus expenses

b)

Lump sum or fixed fee

c)

Per diem

d)

MDPE

34.

The character of occupancy of existing buildings may be changed subject to the approval of the Building Official and provided the new or proposed use is _____ than the existing use.

a)

Less hazardous

b)

Equally hazardous

c)

More hazardous

d)

Equally or less hazardous

35.

When the project is not yet executed, what happens to the intellectual property of the architect over the design/drawings?

a)

The intellectual property for the design does not exist until the project is built

b)

The intellectual property for the design is the owner’s until the project is built

c)

The intellectual property for the design remains the same because the construction of the project is irrelevant to intellectual property

d)

The intellectual property for the design is still the architect’s because it only becomes the owner’s AFTER the project is built

36.

Architect Arno, a member of the PRBOA, had to resign from his post due to health reasons after having served for a full year. Architect Hector was appointed to replace Architect Arno. How many years shall Architect Hector serve?

a)

4 years

b)

3 years

c)

2 years

d)

1 year

37.

Which body has the power to hear and decide administrative cases involving violations of RA 9266 and to issue subpoenas to secure witnesses and produce documents in connection with such administrative cases?

a)

The UAP

b)

The PRBOA

c)

The PRC

d)

The Regional Trial Court

38.

This method of compensation is a variation of the percentage based on project construction cost. The remuneration under this method is based on cost per square meter of the project, which may be derived from historical data on the average construction cost per square meter of a similar project.

a)

Rough Estimation

b)

Unit Cost Method

c)

Value-Based Pricing

d)

Professional Fee Plus Expenses

39.

This method of compensation is typically used for services which are not well-defined, partial services, and additional services.

a)

Lump Sum

b)

Time-Based Fees

c)

Unit Cost Method

d)

Value-Based Pricing

40.

. In the multiple of direct personnel expenses method of compensation, a multiplier is used to arrive at the professional fee to be charged to the client. Which is NOT an acceptable multiplier to be used in such a computation?

a)

1.50

b)

2.00

c)

2.50

d)

3.00

41.

According to UAP Doc. 301, when should the contract time begin to run as a general rule?

a)

7 days after the contractor receives the Notice to Proceed

b)

On the day the contractor receives the Notice to Proceed

c)

15 days after the agreement between the owner and the contractor is signed

d)

On the day the contractor is able to mobilize

42.

In a design-build arrangement with a guaranteed maximum project construction cost, the PCC is guaranteed by the architect to not exceed ___ of the estimated PCC.

a)

5%

b)

10%

c)

15%

d)

None of the above

43.

How soon may the Board reinstate a revoked Certificate of Registration?

a)

6 months after revocation

b)

1 year after revocation

c)

2 years after revocation

d)

3 years after revocation

44.

Foreign nationals who wish to render architectural services in the Philippines must first secure a special/temporary permit. Where will they obtain this special/temporary permit?

a)

From the UAP, subject to approval by the PRBOA

b)

From the UAP, subject to approval by the PRC

c)

From the PRBOA, subject to approval by the PRC

d)

From the PRBOA, subject to approval by the UAP

45.

For competitive bidding/procurement, the architect furnishes complete sets of the bid documents for purposes of bidding in as many sets as may be required to conduct a successful bidding. These documents are paid in what way?

a)

Free by architect

b)

Included in the service of the architect

c)

On loan to owner

d)

On loan to the bidders

46.

Who is the Legal Adviser of the PRBArch and its RA 9266?

a)

Supreme Court judge

b)

Professional Regulatory Commission

c)

Court of Appeals

d)

DJ Khaled

47.

A returning Filipino Architect who is registered outside of the Philippines is going to have a project here in the Philippines. He applied for a TSP in the PRBArch and aside from securing the permit, what other document should he secure?

a)

Professional ID

b)

Liability insurance

c)

CoR

d)

UAP membership

48.

The occupancy permit after application must be issued to the applicant within how many days

a)

15

b)

30

c)

60

d)

120

49.

In the case of the non- issuance, suspension or revocation of permits, the applicant/permittee may file an appeal with whom?

a)

DPWH Secretary

b)

Mayor

c)

Building Official

d)

MMDA

50.

In the case of the non- issuance, suspension or revocation of permits, the applicant/permittee may file an appeal. Within how many days must the appeal be responded to or acted upon?

a)

15

b)

30

c)

60

d)

120

51.

To whom is the Building Permit granted?

a)

Architect

b)

Owner

c)

Contractor

d)

Engineer

52.

This method of remuneration is used when the services of a Professional Consulting Architect (PCA) is expected to be required at intervals over a period of time

a)

CoR

b)

Retainer

c)

Lump Sum

d)

PFPE

53.

GROUP 1 DAEDS (SIMPLEST UTILIZATION)

a)

5%

b)

6%

c)

7%

d)

4%

54.

GROUP 2 DAEDS (MODERATE COMPLEXITY)

a)

5%

b)

6%

c)

7%

d)

4%

55.

GROUP 3 DAEDS (EXCEPTIONAL CHARACTER)

a)

5%

b)

6%

c)

7%

d)

4%

56.

GROUP 4 DAEDS (RESIDENTIAL)

a)

10%

b)

12%

c)

100%

d)

6%

57.

GROUP 5 DAEDS (MONUMENTAL)

a)

10%

b)

12%

c)

100%

d)

6%

58.

GROUP 6 DAEDS (REPETITIVE CONS.) 1ST BUILDING

a)

10%

b)

12%

c)

100%

d)

6%

59.

GROUP 6 DAEDS (REPETITIVE CONS.) 2ND BUILDING

a)

50%

b)

40%

c)

100%

d)

30%

60.

GROUP 6 DAEDS (REPETITIVE CONS.) 3RD BUILDING

a)

50%

b)

40%

c)

100%

d)

30%

61.

GROUP 7 DAEDS (HOUSING PROJECT) 1ST UNIT

a)

50%

b)

10%

c)

100%

d)

30%

62.

GROUP 8 DAEDS (INTERIORS)

a)

15%

b)

10%

c)

100%

d)

30%

63.

GROUP 9 DAEDS (ALTERATIONS)

a)

60-100%

b)

50-150%

c)

50-120%

d)

DJ KHALED %

64.

Vvhere the Architect is engaged to render opinion or give advice, clarilications or explanation on technical matters pertaining to his profession, (also refer to Pre-Design Services SPP Doc. 201 under Consultation) the chargeable RPF shall not be less than

a)

1000

b)

2000

c)

3000

d)

4000

65.

when rendering services as an expert witness, the Architect's fee shall not be less than

a)

5000

b)

2000

c)

3000

d)

4000

66.

(GROUP 10) Another sixty percent (60%) of the amount shall be charged for the travel period in cese of locations that are in excess of

a)

100km

b)

150km

c)

200km

d)

50km

67.

Upon signing of the Service Agreement, An amount equivalent to ____ of the agreed Professional Fee shall be paid by the Owner

a)

10%

b)

15%

c)

5%

d)

6%

68.

Upon completion and submission of the documents under Schematic Design Phase,the Owner shall pay the Architect a sum equal to

a)

10%

b)

15%

c)

20%

d)

5%

69.

Upon completion and submission of the documents under Design Development Phase,the Owner shall pay the Architect a sum equal to

a)

10%

b)

15%

c)

20%

d)

5%

70.

Upon completion and submission of the documents under Contract Document Phase,the Owner shall pay the Architect a sum equal to

a)

50%

b)

40%

c)

20%

d)

90%

71.

____ percent for Architect's Liability under the Civil Code

a)

5%

b)

10%

c)

3%

d)

6%

72.

PROGRESS BILLING OF SPP 203 (SPECIALIZED ARCHITECTURAL SERVICES)

____% of the fee upon submission of the preliminary design?

a)

30%

b)

50%

c)

60%

d)

15%

73.

PROGRESS BILLING OF SPP 203 (SPECIALIZED ARCHITECTURAL SERVICES)

____% of the fee upon submission of the final design?

a)

30%

b)

50%

c)

60%

d)

15%

74.

PROGRESS BILLING OF SPP 203 (SPECIALIZED ARCHITECTURAL SERVICES)

____% of the fee upon completion of project?

a)

30%

b)

50%

c)

60%

d)

15%

75.

The Recommended Professional Fee (RPF) for Fulltime Construction Supervision Services is

a)

1-2%

b)

1-1.5%

c)

1.5-2%

d)

GOD DID%

76.

The services of the Architect as Construction Manager can be compensated by a Recommended Professional Fee (RPF) of

a)

1-2%

b)

1-1.5%

c)

1.5-3%

d)

GOD DID%