TOA 2 Finals Quiz No. 1 - Set B

Total questions: 50

Worksheet time: 25mins

Name
Class
Date
1.

For ramps using the maximum allowable slope, a landing must be provided after every 6.00 meters of horizontal travel distance. What is the minimum length of this landing?

a)

1 m

b)

1.2 m

c)

1.5 m

d)

2 m

2.

Handrails are required for ramps, stairs, and dropped curbs at crossings. These handrails should be installed at what height/s?

a)

700 mm & 900 mm

b)

800 mm & 900 mm

c)

900 mm & 1000 mm

d)

900 mm

3.

What are the minimum dimensions of a toilet stall for PWDs?

a)

1.50m x 1.50m

b)

1.50m x 1.80m

c)

1.70m x 1.80m

d)

1.80m x 2.00m

4.

What is the minimum clear width for doors according to BP 344?

a)

600 mm

b)

700 mm

c)

800 mm

d)

900 mm

5.

For drainage purposes, a maximum cross gradient of ____ toward the road is allowed for dropped curbs.

a)

1:12

b)

1:20

c)

1:100

d)

12%

e)

20%

6.
International signage for handicapped.
a)
b)
c)
d)
7.
Minimum width of doors.
a)
800mm
b)
900mm
c)
710mm
d)
750mm
8.
Minimum length of PWD parking slot.
a)
5m
b)
3.7m
c)
2.5m
d)
6m
9.
Washroom signage shape for women.
a)
Circle
b)
Triangle
c)
Square
d)
Doesn’t matter.
10.
That portion of the foundation of a structure which spreads and transmits loads directly to the soil or the pile.
a)
Foundation
b)
Pile Cap
c)
Column
d)
Footing
11.

Article 1723 of the Civil Code states that the

engineer or architect who drew up the plans and

specifications is liable for ___ years from

completion of the building should it collapse due

to defects in the plans or the ground.

a)

15

b)

10

c)

5

d)

3

12.

This person is tasked with the enforcement of the National Building Code in his or her jurisdiction. He/she issues, denies, suspends, or revokes building permits.

a)

Secretary of the DPWH

b)

Building Official

c)

construction inspector

d)

barangay captain

13.

According to the Building Code, how many sets of plans and specifications must be submitted when applying for a permit?

a)

3

b)

5

c)

6

d)

7

14.

This term refers to any new construction which increases the height or area of an existing building.

a)

Alteration

b)

Renovation

c)

Addition

d)

Conversion

15.

The distance between 2 landings in stairs will be a maximum of? (sec. 1207 - 5g)

a)

3.00m

b)

3.50m

c)

3.60m

d)

2.70m

16.
Low Rise Structures.
a)
3 to 15 meters
b)
1 to 15 meters
c)
1 to 3 meters
d)
3 to 15 floors
17.

Which does not belong?

a)

Direct selection

b)

Comparative selection

c)

Client’s Referral 

d)

Architectural design competition

18.

In this phase, you are tasked to submit the program, budget, schedule, and initial line drawings. You are also tasked to send a Statement of Probable Project Construction Cost (SPPCC).

a)

Pre-design services

b)

Schematic Design Phase

c)

Bidding Phase

d)

Project Definition Phase 

19.

In this phase, you are to submit the plans, elevations, sections, outline specifications and construction systems. You are also tasked to send the updated SPPCC in line with your design. What phase is this?

a)

Schematic Design Phase

b)

Design Development Phase

c)

Contract Document Phase

d)

Construction Phase

20.

Professional fee for Consultants per hour

a)

1,000php

b)

Minimum Wage + gas money

c)

5,000php

d)

1,000 + lunch

21.

The three parts of the means of egress. 

a)

Exit access, exit, exit discharge 

b)

Exit access, exit, public way 

c)

Exit, protective enclosure, public way 

 

d)

Protective enclosure, exit access, exit discharge 

e)

None of these 

22.

All of the following are grounds for the disqualification of any nominee for a PRBArch position except for which one?

a)

The nominee is an officer of the UAP.

b)

The nominee is an officer of a professional organization for architects that is not the UAP.

c)

The nominee has never taught at a school, university, or review center teaching architecture courses.

d)

Both B and C

23.

Who shall develop the CPD program for architects?

a)

The CPD providers

b)

The academe

c)

The IAPOA

d)

The PRBArch

24.

Documents which define all aspects of professional service, prescribes minimum basic fees and establishes the rights and obligations of both the architect and the client.

a)

Code of Ethical Conduct

b)

Standards of Professional Practice

c)

Schedule of Fees

d)

Architect's Credo

25.

Which of the following is true?

a)

All registered and licensed architects may join any organization for architects.

b)

All registered and licensed architects are required to be members of the UAP because it is the IAPOA.

c)

Both A and B

d)

All of the above are false

26.

A document which contains the norms and principles governing the practice of the profession of architecture in the highest standards of ethical conduct.

a)

Standards of Professional Practice

b)

Architect’s Credo

c)

Code of Ethical Conduct

d)

UAP Documents

27.

A certificate bearing a registration number signifying that the individual has successfully passed the licensure examination and is registered to practice his/her profession as architect

a)

Certificate of Examination

b)

Certificate of Registration

c)

Certification of Licensure

d)

Professional Certification

28.

The architect who is directly and professionally responsible for the total design of the project for the client and who shall assume the civil liability for the plans.

a)

Architect

b)

Architect-of-Record

c)

Architect-in-Charge-of-Construction

d)

Professional Architect

29.

The architect who is directly and professionally responsible for the total design of the project for the client and who shall assume the civil liability for the plans.

a)

Architect

b)

Architect-of-Record

c)

Architect-in-Charge-of-Construction

d)

Professional Architect

30.

The Code of Ethical Conduct is an integral part of what ?

a)

UAP Documents on services of the Architect

b)

Civil Code of the Philippines

c)

Architect's National Code

d)

National Building COde

31.

Allan , a 5th year student is commissioned by Mr. & Mrs. ABC to design a house.

Allan had the plans signed by his professor Architect petmalu. Who is Unethical?

a)

Mr. & Mrs. ABC

b)

Allan

c)

Allan and Arch. Petmalu

d)

All of them

32.

(Allan prepared plans signed by Arch. Petmalu)

Who can be reprimanded by the PRC?

a)

Arch. Petmalu

b)

Allan and Arch Petmalu

c)

Allan and Mr. / Mrs. ABC

d)

All of them

33.

What is the foremost role of the Architect with regards to his client?

a)

Adviser

b)

Design Manager

c)

Design Consultant

d)

Employee

34.

When is the time when the owner can get replacement for his architect?

a)

immediately without notifying the first architect

b)

Immediately after terminating the services of the first architect

c)

Within 15 days after terminating the services of the first architect.

d)

After terminating the services of the first architect and paying all obligations.

35.

As the Architect of the project, you have been instructed from a persistent client that a design he saw in another building should be copied. What can you do to tell the client that his kind of practice is unethical?

a)

Follow the instruction of the client because his opinion is very important

b)

Try to follow the clients request but make subtle changes to make the design to look different

c)

Try to convince the client to change design even with the risk of loosing him

d)

Ignore the client and proceed with your design

36.

How much will the Architect pay if he/she Violates the Code of Ethical Conduct?

a)

P100,000

b)

P150,000

c)

P5,000,000

d)

P200,000

37.

Architect X is Celebrating the 25th year anniversary of his office. He wants to be featured on a magazine. To lessen the amount that will be spent on being published, with his consent, he allowed his friend who is a writer to solicit from advertisers under his name.

Is there anything wrong here? If there is, what/who is wrong in this situation?

a)

Nothing is wrong. This was done with everybody's consent and nobody was coerced into doing anything

b)

Architect is Liable

c)

The Writer friend of Architect X

d)

The advertisers

38.

What is the full title of RA 9266?

a)

The Architecture Act of 2004

b)

An Act Providing For A More Responsive And Comprehensive Regulation For The Registration, Licensing And Practice Of Architecture

c)

Standards of Professional Practice

d)

Code of Ethical Conduct

39.

The architect who is directly and professionally responsible for the total design of the project for the client and who shall assume the civil liability for the plans.

a)

Architect

b)

Architect-of-Record

c)

Architect-in-Charge-of-Construction

d)

Professional Architect

40.

All of the following are grounds for the disqualification of any nominee for a PRBArch position except for which one?

a)

The nominee is an officer of the UAP.

b)

The nominee is an officer of a professional organization for architects that is not the UAP.

c)

The nominee has never taught at a school, university, or review center teaching architecture courses.

d)

Both B and C

41.

The following are considered part of the contract documents, except for:

a)

Code of Ethical Conduct

b)

Standards of Professional Practice

c)

UAP Document

d)

None of these are part of the contract documents

e)

Both A and B

42.

A duly notarized written contract stipulating the scope of services and guaranteeing compensation for such services that the architect will render.

a)

Scope of Work

b)

Proposal

c)

Preliminary Conditions

d)

Service Agreement

43.

An architect who is professionally and academically qualified and with exceptional or recognized expertise or specialization in any branch of architecture

a)

Architect

b)

Professional Architect

c)

Consulting Architect

d)

Architect-of-Record

44.

Is it the duty of the architect to review the contractor’s billings and issue Certificates of Payment during the regular design service?

a)

Yes, this is part of the regular design service

b)

No, this is not part of the regular design service

c)

Only if the architect will be hired to perform construction management services as well.

d)

Both B and C

45.

Which method of selection is appropriate for monumental projects?

a)

Bidding

b)

Competition

c)

Direct selection

d)

Either B or C

46.

In direct selection, which should NOT be a basis of the client for selecting an architect?

a)

Architect's reputation

b)

Recommendation of a friend

c)

Recommendation of another architect

d)

Sketches submitted by the architect for the contemplated project

47.

Which is NOT true of architectural design competitions?

a)

They may be expensive

b)

They are open only to architects and not architectural firms

c)

They may be time-consuming

d)

All of these are true

48.

When was RA 9266, otherwise known as The Architecture Act of 2004, signed into law?

a)

March 17, 2004

b)

April 10, 2004

c)

November 15, 2004

d)

December 1, 2004

49.

One of PRBOA's main functions is to prescribe guidelines for CPD. What is CPD?

a)

Certified Professional Development

b)

Continuing Practice Development

c)

Continuing Professional Development

d)

Certified Practice Development

50.

When the Architect of Record of a finished project dies, who can assume permission regarding reproducing his/her plans?

a)

Family

b)

Firm Co-owner

c)

Depends on the ruling of the courts

d)

Nobody