NEW
Font size
WorksheetsTOA 2 Finals Quiz No. 1 - Set C
Total questions: 50
Worksheet time: 25mins
What is the minimum width required for a dropped curb leading to a 1.20m-wide crossing?
0.9 m
1 m
1.2 m
1.5 m
What is the minimum width of an accessible parking slot?
2.15 m
2.5 m
2.7 m
3.7 m
What are the minimum dimensions required for elevators?
Hoistway inside dimensions of 1.10m x 1.40m
Car inside dimensions of 1.10 x 1.40m
Hoistway inside dimensions of 1.10 x 1.70
Car inside dimensions of 1.10 x 1.70
A central refuge area with a minimum depth of 1.50m is required for crossings if the width of the road to be crossed exceeds
6.5 m
8 m
10 m
12 m
What is the maximum travel distance to an exit if the building has an automatic fire extinguishing system?
30 meters
45 meters
60 meters
75 meters
According to Article 1723 of the Civil Code, who shall be held liable if a building collapses due to defects in the plans?
The architect or the engineer who drew up the plans
The contractor and the construction supervisor
The Building Official who reviewed and approved the plans
he architect or the engineer who drew up the plans
and
The contractor and the construction supervisor
PD 1096: Width and Height of doors will be not less than ___ mm in width, not less than ___ m in height, opening will be 90 degrees and exit way clear width not less than 700mm? (sec. 1207-3c)
900, 2.10
900, 2.00
800, 2.00
800, 2.10
This is the regular design phase after signing the Service Agreement
Pre-design services
Schematic Design Phase
Bidding Phase
Project Definition Phase
In this phase, you are to submit the 7 sets of complete contract documents, technical specification, and the Updated SPPCC. What phase is this?
Schematic Design Phase
Design Development Phase
Contract Document Phase
Construction Phase
This is the phase where execution of the design happens.
Schematic Design Phase
Design Development Phase
Contract Document Phase
Construction Phase
Professional fee for Consultants per appearance
1,000php
576php + gas money
5,000php
1,000 + lunch
It incorporates a space program with characterizations of the envisioned spaces such as ambiance, cost range, etc.
Architectural programming
Space programming
Space planning
Consultation
How many means of egress at the minimum are required for a floor level that will be occupied by 1,000 people?
1
2
3
4
5
Minimum width of a door opening in a means of egress.
710mm
810mm
900mm
910mm
1220mm
Minimum width of a door opening in a means of egress.
710mm
810mm
900mm
910mm
1220mm
Foreign nationals need a temporary or special permit to practice architecture in the Philippines. Where can this special permit be obtained?
From the PRBArch
From the local counterpart
From the Department of Foreign Affairs
How often must the Certificate of Registration be renewed?
Every year
Every three years
It never expires.
It must be renewed whenever the PRC ID is renewed.
Does the architect have the right to control the construction of any building that only partly reproduces his design?
Yes.
No.
Only if the design is copied exactly, without any modifications.
Only if the owner of the building hired the architect to design the building.
Who shall prepare the syllabi for the licensure exams?
The PRC
The PRBArch
The UAP
The IAPOA
The intellectual property rights retained by an architect over any architectural documents/work that he/she prepares unless there is a written stipulation to the contrary.
Property
Ownership
Authorship
Copyright
A duly notarized written contract stipulating the scope of services and guaranteeing compensation for such services that the architect will render.
Scope of Work
Proposal
Preliminary Conditions
Service Agreement
An architect who is professionally and academically qualified and with exceptional or recognized expertise or specialization in any branch of architecture
Architect
Professional Architect
Consulting Architect
Architect-of-Record
Who nominates persons for each position in the PRBArch?
The IAPOA
The outgoing members of the PRBArch
The President of the Philippines
Any registered and licensed architect may nominate persons for vacant positions in the PRBArch
The Code of Ethical Conduct is an integral part of what ?
UAP Documents on services of the Architect
Civil Code of the Philippines
Architect's National Code
National Building COde
Aside from the people and country, who does the architect give supreme oath to?
God
Client
Colleagues
Subordinates
Allan , a 5th year student is commissioned by Mr. & Mrs. ABC to design a house.
Allan had the plans signed by his professor Architect petmalu. Who is Unethical?
Mr. & Mrs. ABC
Allan
Allan and Arch. Petmalu
All of them
As the Architect of the project, you have been instructed from a persistent client that a design he saw in another building should be copied. What can you do to tell the client that his kind of practice is unethical?
Follow the instruction of the client because his opinion is very important
Try to follow the clients request but make subtle changes to make the design to look different
Try to convince the client to change design even with the risk of loosing him
Ignore the client and proceed with your design
How much will the Architect pay if he/she Violates the Code of Ethical Conduct?
P100,000
P150,000
P5,000,000
P200,000
Architect X is Celebrating the 25th year anniversary of his office. He wants to be featured on a magazine. To lessen the amount that will be spent on being published, with his consent, he allowed his friend who is a writer to solicit from advertisers under his name.
Is there anything wrong here? If there is, what/who is wrong in this situation?
Nothing is wrong. This was done with everybody's consent and nobody was coerced into doing anything
Architect is Liable
The Writer friend of Architect X
The advertisers
When was RA 9266, otherwise known as The Architecture Act of 2004, signed into law?
March 17, 2004
April 10, 2004
November 15, 2004
December 1, 2004
One of PRBOA's main functions is to prescribe guidelines for CPD. What is CPD?
Certified Professional Development
Continuing Practice Development
Continuing Professional Development
Certified Practice Development
When the Architect of Record of a finished project dies, who can assume permission regarding reproducing his/her plans?
Family
Firm Co-owner
Depends on the ruling of the courts
Nobody
If an ALE passer fails to take his/her oath with any member of the Board or authorized representative present, will he/she still be able to practice architecture?
No
It depends on the Board's decision
Yes, if he/she passes the requirements for reconsideration
Yes, he/she passed the examination anyway
According to Section 29, a person who violates any of the provisions of RA 9266 and its IRR shall be guilty of misdemeanor. How much is the minimum fine for such charge?
P100,000
P150,000
P200,000
P250,000
Who has the final decision on the selection of a new Board Examiner for a PRBOA vacancy?
5 immediate past presidents of the IAPOA
PRC commissioners
Incumbent president of the UAP
President of the Philippines
How much fine or penalty must be charged to any violator of the code?
not less than Php 100,000 but not more than Php 5,000,000.
not less than Php 50,000 but not more than Php 10,000,000.
exact Php 200,000 but not more than Php 6,000,000.
starts at Php 150,000 but not more than Php 4,500,000.
An Architect refuses to give the original plan to the Owner. Why?
The Owner is entitled only to the blueprint
The Architects work covers by intellectual property rights/law
In order to prevent the owner from making duplicates and/or constructing without his knowledge
All of the Above
A person found preparing Architectural plans without the necessary license is guilty of what ?
nothing
misdemeanor
illegal practice
misrepresentation
The minimum width of any egress should not be less than _ mm?
915mm
950mm
1100mm
900mm
What is the acceptable minimum width of stairs prior to the effectivity date of RA9514?
900mm
915mm
1220mm
1200mm
A large open passageway in a public building, such as rail station or airport terminal that people meet in or pass through
Concourse
Passageway
Lobby
Corridor
Any visual or audible signal produced by a device or system to warn the occupants of the bldg or firefighting elements of the presence or danger of fire
Fire Alarm
Fire Alerting System
Fire Detector
Smoke and fire detector
Setbacks for Commercial, Industrial, Institutional, and Recreational Buildings with 20m - 24m RROW
8m (Front); 5m (Rear and Side)
6m (Front); 3m (Rear and Side)
5m (Front); 3m (Rear and Side
5m (Front); 2m (Rear and Side)
