NEW
Font size
WorksheetsBldg. Tech 2 (CTTO)
Total questions: 50
Worksheet time: 50mins
A roofing tile which has the shape of an "S" laid on its side
Mission tile
Pantile
French tile
That part of the building foundation which forms the permanent retaining wall of the structure below grade
Foundation course
Grad beam
Foundation wall
Joint employed to reduce restraint by accommodating movement of masonry walls are known as
Cold joints
Control joints
Block outs
A system of framing a building in which the studs are continuous to roof supporting second floor joints
Post and beam
Western framing
Balloon framing
Rough plaster finish obtained by flinging plaster on a wall with a hand operated machine
Tryolean finish
Trowel finish
Broom stripped finish
A principal member of the truss which extends from one end to the other primarily to resist bending
Web member
Girt
Chord
A protein: the chief nitrogenous ingredient in milk is
Casein
Temperea
Alabaster
A composition of two or more metals fused together usually to obtain a desired property
Annealing
Alloy
Built-up
The horizontal distance from the face of a lock or latch to the center of the knob or lock cylinder
Backset
Backfill
Built-up
A commercially pure iron of fibrous nature, valued for its corrosion resistance and ductility
Cast iron
Black iron
Wrought iron
Horizontal stud Filipino term
Pabalagbag
Tahilan
Pilareta
Riser Filipino term
Muldura
Takip-silipan
Planehuelda
Collar plate Filipino term
Hardinera
Guililan
Sinturon
Temper (metal work) Filipino term
Suban
Espolon
Poleva
Plumb line Filipino term
Pantilya
Asintada
Hulog
A beam that projects beyond one or both its support
Continuous
Cantilever
Tie
A wall (bearing or non-bearing) designed to resist lateral forces parallel to the wall
Non-bearing
Prefabricated
Shear
A modern method of installing wood parquet flooring on wooden boards sub-flooring is by
Gluing / pasting
Nailing into battens
Wainscoting
The standard height of window sills for office rooms in upper floors
1.20 meters
0.60 meters
0.90 meters
The dimension of commercial acoustic boards for aluminum T-runners used for dropped-ceiling in offices
30" x 60" x 1"
24" x 50" x 7/8"
24" x 48" x 1/2*
In the design of a large shopping centers where space is required, intervals of columns can be wider than the ordinary by adopting a structural method of construction
Compressioning
Post-tensioning
Pre-casting
Humidification and condensation in exterior walls can be minimized by
Providing stud space between exterior finish and interior finish
Providing building paper sheathing
Providing building paper sheathing and space filled
Heat gain through the structure of a habitable room occur in tropical region at walls and roofs by conduction. This can be minimized by the use of
Wood
Concrete
Steel
A material used to remedy vapor flow
Glossy surfaced asphalt saturated paper, 50 lbs or more
Wall paper
Asbestos cement board
Dry walls do not require appreciable mount of moisture and they are customarily finished with
Mortar and cement
Plywood on studs
Lath and plaster
Wallboards or plywood maybe applied over studs. They can also be applied over CHB masonry wall by using
Wood battens
Furring
Sheathing
To turn back water whenever joints occur in which dissimilar materials come together, it is necessary to provide
Flashing material
Binding material
Counter flushing
The part of a foundation system which supports the exterior walls of a superstructure and bears directly on the column footing is a
Foundation course
Grade beam
Foundation wall
A narrow strip of wood applied to cover a joint along the edges of two parallel boards in the same plane
Fillet
Strip
Batten
The stressing of unbounded tendons after concrete has cured
Post-tensioning
Pre-casting
Lift slab
The boxing in of covering a joist, beam or girder to give the appearance of a larger beam
Beam formworks
Beam blocking
Grade beam
A system of framing a building on which floor joists of each storey rest on the top plates of the storey below and teh bearing walls and partitions rest on the subfloor of each storey
Balloon framing
Flank framing
Western framing
Pressure exerted against the underground portion of a building created by the presence of water in the soil
Soil bearing pressure
Hydrostatic pressure
Atmospheric pressure
A window which projects outside the main line of a building and the compartment in which it is located extends to the floor
Bay window
Hopper window
Oriel window
A form of brick bond in which each course is alternately composed of entirely of headers or of stretchers
Common bond
Flemish bond
English bond
A joint formed when a concrete surface hardens before the next batch of concrete is placed against it
Block out
Cold joint
Control joint
An iron alloy usually including carbon and silicon which has high compressive strength but low tensile strength
Pig iron
Cast iron
Wrought iron
Plastered course Filipino term
Lastilyas
Moneyka
Kusturada
Bottom chord Filipino term
Barakilan
Sibe
Estunyo
Perlin Filipino term
Tahilan
Balangkas
Reostra
Eave Filipino term
Sopo
Tabike
Sibe
Top chord Filipino term
Tahilan
Baytang
Sinturon
Best material which will reduce moisture in a wall when used
CHB S-cut joint finish
1" thick V-cut wood boards
Synthetic adobe finish on RC wall
Plaster or plywood ceiling on nailers or joists below a ventilated roof space may show "pattern staining" on the ceiling. This can be prevented by
Cleaning
Adequate insulation
Re-painting
Heat gain through the walls in buildings exposed to afternoon sun intensifies discomfort of inhabitants because of conductivity. However, this can be minimized by the use of
Combination of wood boards and plywood with cavity in-between
Thick RC wall
Steel sheets
Sound or noise between bedrooms may be reduced by using less expensive materials with the application of construction techniques
Double wall plywood on horizontal and vertical studs with absorbents
Solid 6" RC wall
Sawali on 2" x 2" studs
One method of leveling batter boards without the transit is the use of
1/4 diameter plastic hose filled with water
Eyesight
Plumb bob
A manual method of squaring the corners of a building lines in building layout is the use of
2-3-4 multiples with the use of transit
3-4-5 multiples with the use of steel tape measure
4-5-4 multiples and strings
When dry conditions are demanded of asphalt tile floor finished on concrete over earth, apply the waterproofing (WP) steps
Felt paper below sub-slab then WP on top of the sub-slab
Felt paper below the top slab then WP the earth
WP the earth under slab
Due to temperature effects in materials, concrete walls, slabs of long buildings, new building adjoining existing buildings should be provided with
Flashing
Welded joints
Expansion joints
