Electrical Principles 6035-02 | Revision

Total questions: 42

Worksheet time: 22mins

Name
Class
Date
1.

When pulling a plug from a socket, what is the last point of contact between plug and socket?

a)

The earth terminal

b)

The fuse

c)

The live terminal

d)

The neutral terminal

2.

The domestic voltage is 230v, but what would be the low-voltage on a central heating system?

a)

110v

b)

24v

c)

400v

d)

240v

3.

If a circuit was to overload, what would be the first to damage?

a)

The appliance

b)

The fuse

c)

The sleeve

d)

The insulation

4.

1) Make sure it is ok to disconnect the supply.

2) Identify the source for the supply.

3) Go back to appliance and prove appliance is dead

4) Test the voltage indicator on a known source.

5) Switch off MCB/remove fuse, lock and label.

Select the correct sequence.

a)

4, 2, 5, 3, 1, 4

b)

1, 4, 5, 3, 2, 1

c)

1, 2, 4, 5, 3, 4

d)

2, 5, 4, 1, 3, 4

5.

What is the component show?

a)

Manometer

b)

Multimeter

c)

Approved voltage indicator

d)

Continuity tester

6.

When there is a problem with the circuit, what would your first action be?

a)

Isolate, rectify problem

b)

Inform customer, isolate

c)

Inform customer, rectify problem

d)

Identify, prove circuit is dead

7.

What is the component circled?

a)

Incoming mains

b)

Consumer unit

c)

Meter

d)

Main earth bar

8.

What is the component circled?

a)

Incoming mains

b)

Consumer unit

c)

Meter

d)

Main earth bar

9.

If there is a major electrical problem in a domestic dwelling, what should be done?

a)

Isolate

b)

Inform the tenant

c)

Inform the supervisor

d)

Inform the local authority

10.

If there is a major electrical problem in a un-occupied dwelling, what should be done?

a)

Isolate

b)

Inform the current tenant

c)

Inform the local authority

d)

Inform the property owner

11.

What is the component shown?

a)

Armoured cable

b)

3-core cable

c)

Multi-core flex

d)

Twin gauge core

12.

What type of connection would be commonly found in the component shown?

a)

Strip connector

b)

Screw-down terminal

c)

Pillar terminal

d)

Claw terminal

13.

What type of connection would be commonly found in the component shown?

a)

Strip connector

b)

Screw-down terminal

c)

Pillar terminal

d)

Claw terminal

14.

The component shown is used for?

a)

Supplementary bonding

b)

Equipotential bonding

c)

Cross bonding

d)

Temporary continuity bonding

15.

The component shown here is?

a)

Approved voltage indicator

b)

Proving unit

c)

Manometer

d)

Multi meter

16.

When a cable enters through a concealed metal box, what needs to be used?

a)

Plastic grommets

b)

Rubber grommets

c)

Glass grommets

d)

Metal grommets

17.

Where is armoured cable used? (Choose 2)

a)

Outhouse's

b)

Cross bonding

c)

Incoming mains

d)

Supplementary bonding

18.

The component shown is?

a)

RCD

b)

RCBO

c)

Fuse

d)

MCB

19.

The component shown is?

a)

RCD

b)

RCBO

c)

Fuse

d)

MCB

20.

Which circuit is shown here?

a)

Radial circuit

b)

Ring circuit

c)

Parallel circuit

d)

Cross circuit

21.

Which circuit would be associated with lighting?

a)

Radial circuit

b)

Ring circuit

c)

Parallel circuit

d)

Cross circuit

22.

When cutting into pipework, when should be temporary continuity bonding be connected?

a)

Before cutting plastic pipe

b)

After cutting plastic pipe

c)

Before cutting copper pipe

d)

After cutting copper pipe

23.

Which of the following are earthing systems in a domestic house?

a)

MGP, TT, WSB

b)

TNS, TNCS, TT

c)

NTS, ATS, TT

d)

BTCC, TT, BTC

24.

The terminal shown is?

a)

Claw terminal

b)

Screw terminal

c)

Pillar terminal

d)

Strip connector

25.

What is the purpose of earth continuity?

a)

In the case of a fault, you are safe

b)

In the case of a fault, informs the tenant

c)

In the case of a fault, isolates the circuit

d)

In the case of a fault, causes an overload

26.

Which type of test is carried out to ensure that live and neutral conductors are not crossed?

a)

RCD test

b)

Polarity test

c)

Earth continuity test

d)

Insulation resistance test

27.

Performing such tests at regular time intervals can detect impending insulation failures before they occur and prevent user accidents or costly product repairs, is known as?

a)

Polarity test

b)

Earth continuity test

c)

Insulation resistance test

d)

Voltage test

28.

When performing an insulation resistance test, what pole is tested?

a)

Live to neutral

b)

Live to earth

c)

Earth to neutral

d)

All of the above

29.

The colour indicated for neutral is?

a)

Blue

b)

Brown

c)

Green/yellow

d)

Red

30.

In the case of an overload, which of the following is easily rectified?

a)

Resetting the MCB

b)

Changing the current of the RCD

c)

Rewiring the entire circuit

31.

In the case of an overload, which of the following is cannot be rectified?

a)

Resetting the MCB

b)

Changing the current of the RCD

c)

Rewiring the entire circuit

d)

Changing fuses in 3-pin plugs

32.

What type of bonding would be present in the events of the copper pipes having a plastic gas meter fitted?

a)

Equipotential bonding

b)

Supplementary bonding

c)

Temporary continuity bonding

d)

Cross bonding

33.

What type of bonding would connect directly to the main earth bar?

a)

Equipotential bonding

b)

Supplementary bonding

c)

Cross bonding

d)

Temporary continuity bonding

34.

Select the multi-core cable.

a)

b)

c)

d)

35.

The final connection to a macerator WC is made using which of the following?

a)

Fused spur switch

b)

Double pole switch

c)

Pull cord

d)

Unswitched connection unit

36.

The main continuity bonding conductor to gas pipework in a domestic property is sized at?

a)

2.5mm

b)

6.0mm

c)

4.0mm

d)

10.0mm

37.

A grommet is used:

a)

As a cable enters a plastic surface-mounted box

b)

As a cable enters a concealed metal box

c)

To sleeve the earth conductor

d)

As insulation for cables

38.

The main reason for not permitting tight coils in electrical cables when installing them is?

a)

An excess of cable is used

b)

Heating can occur in the cable

c)

The circuit will not work

d)

The cable will split

39.

Which of the following type of tests would be carried out to ensure that in the event of an electrical fault through contact with a metallic pipe, the current would flow to earth?

a)

RCD test

b)

Polarity test

c)

Earth continuity test

d)

Insulation resistance test

40.

What instrument should be used under the safe isolation procedure when checking for safe isolation?

a)

RCD tester

b)

Insulation resistance tester

c)

Multi-meter

d)

Approved voltage-indicating device

41.

The isolation of an electric shower should take place at the?

a)

Pull-cord switch

b)

Rocket plate switch

c)

Main supplier's fuse

d)

Consumer unit

42.

What is the recommended device for checking the correct operation of an approved voltage indicating device?

a)

Proving unit

b)

Multi-meter

c)

Earth teaster

d)

Neon screwdriver