Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

RA 9266 & BP 344 QUIZ

Total questions: 30

Worksheet time: 19mins

Name
Class
Date
1.

The architect who is directly and professionally responsible for the total design of the project for the client and who shall assume the civil liability for the plans.

a)

Architect

b)

Architect-of-Record

c)

Architect-in-Charge-of-Construction

d)

Professional Architect

2.

A certificate bearing a registration number signifying that the individual has successfully passed the licensure examination and is registered to practice his/her profession as architect

a)

Certificate of Examination

b)

Certificate of Registration

c)

Certification of Licensure

d)

Professional Certification

3.

An architect who is professionally and academically qualified and with exceptional or recognized expertise or specialization in any branch of architecture

a)

Architect

b)

Professional Architect

c)

Consulting Architect

d)

Architect-of-Record

4.

A duly notarized written contract stipulating the scope of services and guaranteeing compensation for such services that the architect will render.

a)

Scope of Work

b)

Proposal

c)

Preliminary Conditions

d)

Service Agreement

5.

The intellectual property rights retained by an architect over any architectural documents/work that he/she prepares unless there is a written stipulation to the contrary.

a)

Property

b)

Ownership

c)

Authorship

d)

Copyright

6.

Who shall prepare the syllabi for the licensure exams?

a)

The PRC

b)

The PRBArch

c)

The UAP

d)

The IAPOA

7.

The proprietary rights to an architectural work by a person who commissions the Architect.

a)

Ownership

b)

Copyright

c)

Authorship

d)

Property

8.

Foreign nationals need a temporary or special permit to practice architecture in the Philippines. Where can this special permit be obtained?

a)

From the PRBArch

b)

From the local counterpart

c)

From the Department of Foreign Affairs

9.

PRC stands for?

a)

Philippines Regulation Commission

b)

Philippines Regulatory Commission

c)

Professional Regulatory Commission

d)

Professional Regulation Commission

10.

RA 9266, Known as "An Act to Regulate the Practice of Architecture in the Philippines", was signed and sealed on?

a)

March 17, 2004

b)

April 10, 2004

c)

November 14, 2004

d)

December 1, 2004

11.

What do you call Working Drawings, Specifications, Estimates and General Conditions?

a)

Construction Drawings

b)

Contract Documents

c)

Project manual

d)

Project Requirements

12.

You had a residential project for a client. After the construction, you found out that the Client used your design for another project without your consent. What will you do?

a)

Forgive and Forget

b)

Inform the Mayor

c)

File a case with the PRC

d)

File a case in court

13.

Before Submitting to a client, what must the architect first do?

a)

Sign a service agreement

b)

Bill for down payment

c)

Discuss board for presentation

d)

Prepare the Probable construction cost

14.

Architect A decided to put up an architectural firm together with his sister who's an interior designer and his brother who is a civil engineer, how many percent of shares does architect should take in?

a)

1/3

b)

50%

c)

75%

d)

100%

15.

An Architect is employed in a certain government agency. The head of the agency decided to commission the agency Architect to prepare the designs and documents for an office building intended to house the regional office of the said agency. The Architect receives an annual compensation of P450,000. if the Project Construction Cost, how much should the Architect ask from the agency as additional compensation? The Construction cost for the said regional office building is P50 million?

a)

P225,000.00

b)

P3,500,000.00

c)

Nothing

d)

P450,000.00

16.

Juan has been working at Saudi Arabia for almost 15 years but he feels incomplete since he was not able to take the licensure examination when he was still in the Philippines. He heard that the PRBOA is going to conduct FLEA at Jeddah. He ask his family to send his Transcript of Record, Birth Certificate and Diploma.

What else does he need to be able to take the FLEA?

a)

Diversified Training Logbook signed and sealed by a Filipino RLA

b)

Certificate of employment from his company showing his tenure and position

c)

Recommendation Letter from the Consulate

d)

Passport and Certification from his/her direct supervisor

17.

What is the maximum allowable slope for PWD ramps, according to BP 344?

a)

10%

b)

12%

c)

1:10

d)

1:12

18.

For ramps using the maximum allowable slope, a landing must be provided after every 6.00 meters of horizontal travel distance. What is the minimum length of this landing?

a)

1 m

b)

1.2 m

c)

1.5 m

d)

2 m

19.

What is the minimum width required for a dropped curb leading to a 1.20m-wide crossing?

a)

0.9 m

b)

1 m

c)

1.2 m

d)

1.5 m

20.

What is the minimum dimension of the required turnabout space for walkways and what should be the maximum distance between two turnabout spaces?

a)

Minimum dimension of 1.20m, maximum distance of 15.00m

b)

Minimum dimension of 1.50m, maximum distance of 12.00m

c)

Minimum dimension of 1.20m, maximum distance of 12.00m

d)

Minimum dimension of 1.50m, maximum distance of 15.00m

21.

Handrails are required for ramps, stairs, and dropped curbs at crossings. These handrails should be installed at what height/s?

a)

700 mm & 900 mm

b)

800 mm & 900 mm

c)

900 mm & 1000 mm

d)

900 mm

22.

What is the minimum width of an accessible parking slot?

a)

2.15 m

b)

2.5 m

c)

2.7 m

d)

3.7 m

23.

What is required to be provided at the bottom and the top of a ramp?

a)

A turnabout space with a minimum dimension of 1.50m

b)

A vestibule with a level space at least 1.50m wide and 2.00m deep

c)

A curb with a minimum height of 100mm

d)

A level area not less than 1.80m in length

24.

What are the minimum dimensions of a toilet stall for PWDs?

a)

1.50m x 1.50m

b)

1.50m x 1.80m

c)

1.70m x 1.80m

d)

1.80m x 2.00m

25.

What are the minimum dimensions required for elevators?

a)

Hoistway inside dimensions of 1.10m x 1.40m

b)

Car inside dimensions of 1.10 x 1.40m

c)

Hoistway inside dimensions of 1.10 x 1.70

d)

Car inside dimensions of 1.10 x 1.70

26.

What is the maximum travel distance allowed for accessible elevators?

a)

10.00m from entrance

b)

15.00m from entrance

c)

20.00m from entrance

d)

30.00m from entrance

27.

For PWD washrooms, what is the maximum height allowed for a lavatory counter?

a)

750 mm

b)

800 mm

c)

900 mm

d)

1200 mm

28.

What is the minimum clear width for doors according to BP 344?

a)

600 mm

b)

700 mm

c)

800 mm

d)

900 mm

29.

A central refuge area with a minimum depth of 1.50m is required for crossings if the width of the road to be crossed exceeds

a)

6.5 m

b)

8 m

c)

10 m

d)

12 m

30.

What is the minimum headroom for walkways according to BP 344?

a)

1.8 m

b)

2 m

c)

2.1 m

d)

3 m