Total quantity of fillings for 4 nos. of P1 pad footing
(a)
2.
Total quantity of formwork to footing bases for 4 nos. of P1 pad footing
(a)
3.
Total quantity of disposal of excavated material for 4 nos. of F1 pad footing
(a)
4.
Total quantity of concrete to 4 nos. of F1 footing bases
(a)
5.
Total quantity of excavation for 8 nos. of F2 pad footing
(a)
6.
Total quantity of formwork to sides of column stump for 8 nos. of F2 pad footing
(a)
7.
Total quantity of trench excavation for GB1, in total 5 similar GB
(a)
8.
Total quantity of lean concrete underneath GB1, in total 5 similar GB
(a)
9.
Total quantity of formwork to sides of GB1, in total 5 similar GB
(a)
10.
Total quantity of concrete to GB2, in total 10 similar GB
(a)