Font size
WorksheetsUnit 104 - Site Preparation
Total questions: 16
Worksheet time: 10mins
What is the name of the type of information shown in the image?
Site Plan
Schematic
Work schedule
Scale drawing
What is the name of the type of information shown in the image?
Site Plan
Schematic
Work schedule
Scale drawing
What is the name of the type of information shown in the image?
Site Plan
Schematic
Work schedule
Scale drawing
What is the name of the type of information shown in the image?
Site Plan
Schematic
Work schedule
Scale drawing
If any disputes arise on site they need to be resolved early on before they develop into a major situation.
True
False
What building regulation covers the requirements for drilling and notching?
Building Regulation L
Building Regulation P
Building Regulation A
Building Regulation C
Good working relationships are vital in order for a construction project to run smoothly. Select from the list below what you could do to ensure these relationships are maintained.
Good communication
Shouting orders
Resolving disputes quickly
Site meetings
Bonus schemes
Lifting floor boards can be a hazardous job so safety measures should be put in place to protect yourself and the customer. At the END of the process you should do what to the area to secure it?
Barrier off exposed open area
Roll back carpets
Check for pipes and cables
De-nail the boards and joists
While working at a client's home, it is essential to take precautions to prevent damage to the structure or personal belongings such as furniture or electronics. Choose the appropriate steps to be taken from the list below.
Use protective coverings on floors
Utilize dust sheets to cover surfaces
Inspect for any pre-existing damage
Relocate valuable items to a safe location
All of the above
This type of floor construction is commonly known as a?
Solid floor
Wooden floor
Concrete floor
Slate Floor
This type of floor construction is commonly known as?
Wooden floor
Suspended floor
Solid Concrete floor
Timber floor
Why is it dangerous to leave a gap in the floor after you have removed a floor board?
You might drop your pencil down there
Someone could fall through the ceiling
The pet cat could get trapped under the floor
Dust may rise up
To protect the customers property would be to use?
Dust sheets
Remove any items carefully
Inspect for any existing damage
All of the previous
What is this called?
Manufacturer's instructions
Information layout
Machine schematics
system instructions
instruction schedule
what is the correct order for the stages of building construction?
Setting out structure position
then
Laying building foundations.
Brick walls to roof line.
then
Installing roof structure.
1st Fixing pipes and cables
then
Dry lining/plastering internal walls.
Fitting kitchen units
then
Testing and commissioning systems
Identify the correct order to lift a floor board
Roll back carpets
then
Check for pipes and cables
Cut down tongue and groove joint
then
Cross cut the board
Lift the board to expose the joists
De-nail the boards and joists
Barrier off the area to protect the customer
