wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Unit R014 - Engineering Manufacture - Topic Area 4 - Retrieval A

Total questions: 8

Worksheet time: 6mins

Name
Class
Date
1.

Inventory Management

JIT is an abbreviation for what?

a)

Just in transit

b)

Just in time

c)

Jaw internal thread

d)

Just inside truck

2.

Inventory Management

JIT is?

a)

Getting to work just in time.

b)

Delivering the product to the customer just in time.

c)

Ordering stock so it arrives just in time for when you need it in the production process.

d)

Meeting the production deadlines just in time.

3.

Inventory Management

JIT eliminates overordering and therefore helps to reduce​ (a)   . Over-ordering of stock that is not used can lead to ​ ​ (b)   components that cannot be used. JIT can significantly improve ​ (c)   as high levels of stock require a lot of management such as staff, storage space, security and heating/lighting. Lower levels of ​ (d)   and capital are needed for stock as less money is tied up in stock, this can lead to money bein available for other business needs such as expansion or new machinery.

Choose from the below words
waste
obsolete
efficiency
investment
4.

Inventory Management

Select the disadvantages of using a JIT stock management system.

a)

Heavily dependent on the supply chain.

b)

Unexpected orders can be difficult to meet as there is no finished stock to hand.

c)

Stock is often sourced locally in order to benefit from quick deliveries however this may not always be the most cost effective option.

d)

Uncontrollable acts of nature can result in missed deliveries and a halt to production.

5.

Inventory Management

MRP is an abbreviation for a business process used in the control of inventory and stock. What does it stand for?

a)

Machinery, Resources and Products

b)

Material Requirements Planning

c)

Model Requisition Process

d)

Movement, Rooming and Production

6.

Inventory Management

Material requirements planning requires a very close understanding of the relationship between..............?

a)

Managers and CEO's

b)

Machinery and Hazards

c)

Supply and Demand

7.

Inventory Management

MRP (Materials Requirements Planning) needs to use the information from BOM's to help. What is a BOM?

a)

Bill of Materials

b)

Business only mode

c)

British Original Manufacturing

d)

Build, Order, Measure

8.

Inventory Management

MRP has a host of advantages however there are potential drawbacks too. MRP uses a huge amount of ​ (a)   . The main software used to manage all the data usually has a high ​ (b)   cost. MRP is also heavily reliant on ​ (c)   and the data used needs to be as ​ (d)   as possible.

Choose from the below words
resources
subscription
forecasting
accurate