Lesson 3: Introduction to EIA

Total questions: 10

Worksheet time: 10mins

Name
Class
Date
1.

What is EIA?

a)

Environmental Impact Act 1974

b)

Environmental Impact Prediction

c)

Environmental Impact Assessment

d)

Environmental Impact Analogy

2.

EIA is a systematic process to :

3.

EIA aims to eliminate or minimize ​ (a)   and optimize ​ (b)   through mitigation and enhancement measures.

Choose from the below words
negative impacts
positive impacts
additional impacts
potential impacts
adverse impacts
possible impacts
4.

Under the Section 34A(8), fine (a)___ or imprisonment for a period (b)___ or both. If an offence is continued after being served with a notice from DOE, then the offense is subjected to a further fine of RM1K for every day it is continued.

a)

(a) exceeding RM500K, (b) exceeding 5 years

b)

(a) not exceeding RM500K, (b) exceeding 5 years

c)

(a) exceeding RM500K, (b) not exceeding 5 years

d)

(a) not exceeding RM500K, (b) not exceeding 5 years

5.

Under the Section 34A(1), drag the list of prescribed activities accordingly

6.

What is Screening during EIA Preparation?

(Apakah maksud "Saringan" semasa proses penyediaan EIA?)

a)

Process used to enhance the understanding towards EIA making

b)

Process used to describe EIA procedure to be precise

c)

Process used to further the EIA study

d)

Process used to determine whether project require an EIA, if so under which schedule

7.

What is Scoping during EIA Preparation?

(Apakah maksud "Skop" semasa proses penyediaan EIA?)

a)

Process to identifies the complaint from people nearby the project area

b)

Process to identifies the issues likely to be most important during EIA study

c)

Process to identifies the cost involve to make an EIA report

d)

Process to identifies the prediction if project continues

8.

_______ is a study in which an area is evaluated in its current state before the project begins, therefore it can predict the environment that may change its existing and can reasonably be expected according to this initial assessment.

(_______ adalah sebuah kajian di mana sesuatu kawasan di nilai keadaan semasa sebelum projek bermula oleh itu, jangkaan persekitaran yang mungkin akan berubah mengikut penilaian awal kajian.

(a)  

9.

All below describe EIA Conditions of Approval (COA) except..

(Semua yang disenarai adalah Syarat-Syarat Kelulusan EIA kecuali..)

a)

Has to comply

(Perlu dipatuhi)

b)

Legal condition

(Syarat sah projek)

c)

Attached together with approval (Disertakan bersama kelulusan projek)

d)

Can be bargain (boleh tawar menawar)

10.

Match the requirements during post-EIA.

(Padankan keperluan semasa pasca-EIA)

a)

Not post-EIA (1)

1.

Existing Environment

b)

Not post-EIA (2)

2.

Screening and Scoping

c)

living documents related to mitigation measures specifically

3.

Environmental Management Plan

d)

Records monitoring activities

4.

Environmental Monitoring Report

e)

Records of compliance

5.

Environmental Audit