WorksheetsGROUP 8 UWU
Total questions: 25
Worksheet time: 17mins
A building's built before ?
1977
1970
1990
_______and telecommunications are radically altering the nature of work
Building
Information technology
Workflow
The dramatic changes in work, and the close links between work and buildings, have created a new class of supplier.
TRUE
FALSE
¯\(0_0)/¯ MAYBE
Facilities management can be viewed at a single levels.
TRUE
FALSE
TRULSE
Must respond to changing demands effectively and quickly, and must support a high level of inter-working between workers.
Buildings
Manager
Employees
A key part of the ________ role is to ensure that the building stock available performs suitably for the tasks required from all aspects.
facilities managers
management
buildings
There are two views of services provided for an organization ?
building centered and organization-centered
manager centered and employee centered
traditional centered and modern centered
Personal_______and telephones connect people together in a collection of operating units which present themselves as an integrated business.
It is a dynamic phenomenon
Performance
Change
Technology
Which aspect of building performance focuses on the individual's ability to directly control their micro-environment?
Technical capability of the building
Technological environment
Human scale and personal micro-environment control
What is one of the key responsibilities of a facilities manager at the strategic level of facilities management?
Managing health and safety protocols
Establishing space standards and space planning
Making bulk purchases of compatible furniture systems
This is the recording, management, and control of all aspects of building design, furniture location, cables, staff- equipment relationships and many other services in a building or portfolio of buildings.
Building energy management systems (BEMS).
Integrated air-handling, cabling, and space management.
Computer-aided facilities management.
This is the integrated monitoring and control of the energy systems in a building designed to ensure building services plant works to optimal efficiency. It is based on a network of control outstations linked to one or more computers operating a set of control algorithms.
Building energy management systems (BEMS).
Integrated air-handling, cabling, and space management.
Computer-aided facilities management.
This is the coordinated support of flexible space management through the installation of an integrated under-floor air delivery system, removing the need for ceiling-based equipment and cabling.
Building energy management systems (BEMS).
Integrated air-handling, cabling, and space management.
Computer-aided facilities management.
The facilities _____ must support all elements of the organization wherever they happen to be?
Administrator
Manager
Principal
It can be a significant force in the provision of building/organizational solutions for business and IT suppliers have established new entities specifically to address this market
System integration
Business integration
Physical integration
________ is brought into every workplace at ever decreasing cost and increasing power and compatibility as computers, facsimile machines, modems etc.
WORKFLOW
TECHNOLOGY
RULES
The two constraints on world-wide business ?
ORGANIZATION AND PEOPLE
BUILDING AND LAND
TIME AND PLACE
Automation is the automation of the flow of events making up the series of tasks carried out by people individually or in groups.
WORKFLOW
WORKPLACE
TECHNOLOGY
Give 1 example of disadvantage of smart buildings.
Reduce Energy Consumption
Automation
Cyber Security
Give 1 example of advantage of Smart buildings
Initial investment cost
Automation
Constant Internet Connection
The facilities manager must support all elements of the organization wherever they happen to be. It should be noted that the information, telecommunications and ultimate business processes that create a business are not building-centered.
ORGANIZATION
BUILDING
CENTERED SERVICE
Buildings are changed from inflexible, high cost, low functionality spaces into efficient integrated communications and control environments. The framework within which decisions are taken must be broad and all-embracing, with the aim of generating an infrastructure to underpin the changing demands of the occupants.
CENTERED SERVICE
BULDING ENERGY MANAGEMENT SYSTEM
BUILDING
The traditional view of firms is changing. Location need no longer be the prime motivation in choice of property, and the premises a firm occupies should no longer restrain the implementation of new technology. There are two views of services provided for an organization: building centered and organization-centered.
ORGANIZATION
THE ROLE OF BUILDING IN BUSINESS
BUILDING
DRAW A BUILDING FOR 5 POINTS

