Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

SDP Quiz - Chapter 4

Total questions: 10

Worksheet time: 8mins

Name
Class
Date
1.

Which one of the following is NOT a method of gathering user requirements?

a)

User survey.

b)

User interview.

c)

User existing software review.

d)

User interface design.

2.

What is the advantage of conducting a survey as compared to an interview?

a)

Less time consuming.

b)

Can reach many people with low cost.

c)

Responses may be useful.

d)

Encourages contact between developers and users.

3.

Which one of the following is NOT one of the existing documents that can be used as a review for gathering user requirements?

a)

Reports

b)

Program logs

c)

Meeting minutes

d)

Graphical User Interface

4.

Which requirements that will be included in the Software Requirements Document (SRD)?

a)

User requirements and System requirements.

b)

User requirements and Design requirements.

c)

System requirements and Design requirements.

d)

User Interface Design requirements.

5.

Which one of the following documents specifies what the user expects the software to be able to do?

a)

Software Requirements Document (SRD)

b)

User Requirements Document (URD)

c)

Functional Requirements Document (FRD)

d)

Non-Functional Requirements Document (Non-FRD)

6.

What is the disadvantage of having existing software review for gathering user requirements?

a)

Responses may not be useful.

b)

Information may be incomplete or inaccurate.

c)

Time consuming to review the code.

d)

Reduced project implementation cost

7.

Which one of the following methods of gathering user requirements whereby no time commitment from users is required and good for learning about procedures and regulations?

a)

Conduct user interview.

b)

Use existing documents review.

c)

Use existing software review.

d)

Study user-supplied documentation.

8.

Which one of the following requirements is NOT included in the User Requirements Document (URD)?

a)

Past requirements.

b)

Desirable requirements.

c)

Optional requirements.

d)

Mandatory requirements.

9.

Which part of the User Requirements Document (URD) whereby the features should be built into the final system unless the cost is too high?

a)

Past requirements.

b)

Desirable requirements.

c)

Optional requirements.

d)

Mandatory requirements.

10.

What is the tool used to assist in determining whether the requirements document is correct, complete, and consistent?

a)

Requirements Checklist.

b)

Requirements Review.

c)

Requirements Analysis.

d)

Requirements Visualization.