wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Malaysia Issuance/Invoicing Part 2

Total questions: 10

Worksheet time: 6mins

Name
Class
Date
1.

What is an acronym for Malaysia, Port Kelang?

(a)  

2.

What is an acronym for Malaysia, Tanjung Pelepas?

(a)  

3.

What is an acronym for Malaysia, Penang?

(a)  

4.

What is an acronym for Malaysia, Pasir Gudang?

(a)  

5.

What is an acronym for Malaysia, Johore Bahru?

(a)  

6.


Before proceeding with other steps for the Invoice Issue copy, what specific part that needs to be checked?

a)

Customer's Reference

b)

Issue Office

c)

BL number

d)

Forwarder's Reference

7.

In the Manual BDR process, which two destinations that are treated as priority?

a)

Singapore and India

b)

Thailand and India

c)

Singapore and Myanmar

d)

Philippines and America

8.

What is the accuracy and target processing time of Malaysia Export?

a)

100% Accuracy with 01:52 mins to 01:58 mins for Issuance and 02:21 mins to

02:28 minutes on Invoicing.

b)

99% Accuracy with 01:52 mins to 01:58 mins for Issuance and 02:21 mins to

02:28 minutes on Invoicing.

c)

100% Accuracy with 01:53 mins to 01:59 mins for Issuance and 02:22 mins to

02:29 minutes on Invoicing.

d)

100% Accuracy with 01:51 mins to 01:57 mins for Issuance and 02:20 mins to

02:27 minutes on Invoicing.

9.

Fill in the blank for DOW Process,

Always check the image of the downloaded invoice. If (a)   is blank, contact Sir Ron Amir Tuazon or Performance Coach for assistance.

10.

Fill in the blank for RPA Downloading Process,

Once the Hold List has been processed, (a)   all of the processed B/Ls so that all unprocessed B/Ls can be processed once their account is removed from the CAD List.