wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Professional Practice 2/3 Refresher (ICA 2)

Total questions: 221

Worksheet time: 3hrs 48mins

Name
Class
Date
1.

This method of compensation is frequently used where there is continuing relationship involving a series of projects

a)

Professional fee plus expenses

b)

Lump sum or fixed fee

c)

Multiple of direct personnel expense

2.

It establishes a fixed sum over and above reimbursement for the Architect's technical time and overhead. An agreement on the general scope of the work is necessary in order to set an equitable fee.

a)

Professional fee plus expenses

b)

Lump sum or fixed fee

c)

Multiple of direct personnel expense

3.

This method of compensation may be applied to government projects since they entail more paper work and time-consuming efforts

a)

Professional fee plus expenses

b)

Lump sum or fixed fee

c)

Multiple of direct personnel expense

4.

When the suspension of construction exceeds a period of ___________, the fee for the remaining works shall be doubled.

a)

6 months

b)

12 months

c)

3 months

d)

30 days

5.

During the progress of work, the Owner shall furnish the Architect a copy of the records of expenses being incurred on the construction. Upon completion of the project, the Owner shall furnish the Architect a copy of the summary of all cost of labor, services, materials, equipment, fixtures and all items used at and for the completion of the construction.

a)

Cost records

b)

Contract records

c)

Records of construction

d)

Minutes of meeting records

6.

Shall include cost of the construction as well as all professional fees, permits, clearances, and utilities and cost of acquiring the project site or lot, cost of money, etc.

a)

Project development cost

b)

Construction cost

c)

Cost records

d)

Estimates

7.

Prescribes space plans, stacking diagrams or sections and computations of areas for the different activities and spaces to be integrated in a building project

a)

Architectural interior services

b)

Site and physical planning

c)

Comprehensive development planning services

d)

Site development planning services

8.

Involves the detailed planning and design to control sound transmission for compatibility with the architectural design concept

a)

Acoustic design services

b)

Sound design services

c)

Architectural sound design services

d)

Aural design services

9.

Involves the detailed planning and design of light transmission, timing, and control for compatibility with the architectural design concept

a)

Architectural lighting layout and design services

b)

Lights and design services

c)

Natural lighting layout services

d)

Acoustic design services

10.

The Architect, upon designing a building or structure, complements this with the design of the surroundings that will make the space fit for a specific mood and for the required activities. He lays out the open spaces in and around the structure such that they contribute to the totality of the project.

a)

Architectural interior services

b)

Site and physical planning

c)

Comprehensive development planning services

d)

Site development planning services

11.

Concerned with the general quality of the settings for people and their activities, buildings and other natural and man-made phenomenon

a)

Architectural interior services

b)

Site and physical planning

c)

Comprehensive development planning services

d)

Site development planning services

12.

Calls for the detailed study of physical, social, economic and administrative components and as such requires the expertise and knowledge of Specialist Consultants (SCs)

a)

Architectural interior services

b)

Site and physical planning

c)

Comprehensive development planning services

d)

Site development planning services

13.

The suitably trained and experienced Consulting Architect in this area of architectural practice provides research, assessment, recording, management, interpretation, and conservation of historical heritage

a)

Historic and heritage conservation and planning

b)

Forensic architecture

c)

Building systems design

d)

Facilities maintenance support

14.

The Consulting Architect in this area of practice arranges and formulates methods of rating and ascertaining the value of structures or facilities which must be fully secured, kept safe, protected, assured, guaranteed and provided sufficient safeguards for the conduct of any work or activity.

a)

Security evaluation and planning

b)

Facilities maintenance support

c)

Building testing and commissioning

d)

Building environment certification

15.

The Architect in this area of practice engages in methods of producing building components in a highly engineered, efficient, and cost-effective manner, particularly for residential and commercial applications

a)

Building systems design

b)

Security evaluation and planning

c)

Facilities maintenance support

d)

Building testing and commissioning

16.

The Consulting Architect in this area of practice provides the Owner with means and measures to ensure the proper function and maintenance of the building/structure and site after final inspection

a)

Building systems design

b)

Security evaluation and planning

c)

Facilities maintenance support

d)

Building testing and commissioning

17.

The Architect in this area of practice recommends the systematic process of ensuring that a building's array of systems is planned, designed, installed and tested to perform according to the design intent and the building's operational needs.

a)

Building systems design

b)

Security evaluation and planning

c)

Facilities maintenance support

d)

Building testing and commissioning

18.

The Consulting Architect in this area of practice must have much more than the basic knowledge of Green Architecture and Environmental and/or Sustainable Design and sufficient knowledge of the governing environmental laws and environmental investigation processes and procedures under international protocols such as the Philippine Solid Waste, Clean Air and Clean Water Acts, DENR administrative issuances and the like.

a)

Building environment certification

b)

Forensic architecture

c)

Buiding appraisal

d)

Structural conceptualization

19.

The Architect in this area of practice undertakes a scientific study on the built environment's well-being, which allows the Architect to focus on the ways in which the building or structure can best maintain itself and prolong its life in a cost-efficient manner, and finally provide recommendations to the Owner

a)

Building environment certification

b)

Forensic architecture

c)

Buiding appraisal

d)

Structural conceptualization

20.

Defined as an act or process of estimating value. The Consulting Architect in this area of places value on the building or structure conditions and defects, and on its repair and maintenance, including the required improvements

a)

Building environment certification

b)

Forensic architecture

c)

Buiding appraisal

d)

Structural conceptualization

21.

The Architect in this area of practice conceives, chooses and develops the type, disposition, arrangement and proportioning of the structural elements of an architectural work, giving due considerations to safety, cost-effectiveness, functionality and aesthetics

a)

Building environment certification

b)

Forensic architecture

c)

Buiding appraisal

d)

Structural conceptualization

22.

The Consulting Architect in this area of practice must have much more than the basic knowledge of site analysis, space planning and management, architectural programming, and the other services under SPP Document 201

a)

Preliminary services

b)

Contract documentation and review services

c)

Post-design services (including construction services)

23.

The Architect in this area of practice must have much more than the basic knowledge of specification writing, estimation and quantity survey, architectural production, architectural software, architectural support services, and contract document review

a)

Preliminary services

b)

Contract documentation and review services

c)

Post-design services (including construction services)

24.

The Consulting Architect in this area of practice must have much more than the basic knowledge of pre-construction, construction, post-construction and the other services under SPP Documents 204, 206, and 207

a)

Preliminary services

b)

Contract documentation and review services

c)

Post-design services (including construction services)

25.

The Architect in this area of practice must have much more than the basic knowledge of the various modes of Alternative Dispute Resolution (ADR) prescribed under R.A. No. 9285, the ADR Act of 2004 and its IRR

a)

Dispute avoidance and resolution

b)

Special building / facility planning and design

c)

Administrative matters

d)

Management of architectural practices

26.

The Architect in this area of practice must have much more than the basic knowledge of the planning and design processes required for housing developments, recreational and tourism estates, health care and hospitality facilities, transportation and telecommunication facilities, production and extractive facilities, utility-related developments, secure facilities, business and industrial parks, economic zones and community architecture and the like

a)

Dispute avoidance and resolution

b)

Special building / facility planning and design

c)

Administrative matters

d)

Management of architectural practices

27.

The Consulting Architect in this area of practice must have much more than the basic knowledge of building materials and finishes, construction methodologies, building envelopes including cladding and roofing systems, architectural fenestrations and architectural hardware, fixtures and fittings

a)

Building components

b)

Management of architectural practices

c)

Special building / facility planning and design

d)

Dispute avoidance and resolution

28.

The Architect in this area of practice must have much more than the basic knowledge of the types of architectural office operations, architectural office management, accounting and audit, labor code, architectural marketing and project development, proposals and contract administration, file management, limitations of business process outsourcing (BPO), and knowledge process outsourcing (KPO) operations

a)

Building components

b)

Management of architectural practices

c)

Special building / facility planning and design

d)

Dispute avoidance and resolution

29.

Responsibility only of Construction Supervision Group to the Owner

a)

Administrative matters

b)

Construction matters

c)

Contract matters

d)

Technical matters

30.

An Architect nominated by the Owner and approved by IAPOA to organize the ADC on behalf of the Owner

a)

Professional advisor

b)

Technical advisor

c)

Competition secretariat

31.

Responsibility only of Construction Supervision Group to the Architect of record

a)

Administrative matters

b)

Construction matters

c)

Contract matters

d)

Technical matters

32.

Specialist personnel who may be consulted by the Jurors during the conduct of the ADC to permit them to obtain all necessary relevant information

a)

Professional advisor

b)

Technical advisor

c)

Competition secretariat

33.

The body formed by the Owner and approved by the Professional Advisor to assist the Professional Advisor and the Jury in the administrative conduct of the ADC

a)

Professional body

b)

Technical advisor

c)

Competition secretariat

34.

Standards of Professional Practice (SPP) on Pre-Design Services

a)

SPP Document 200

b)

SPP Document 201

c)

SPP Document 202

d)

SPP Document 203

35.

Standards of Professional Practice (SPP) on Regular Design Services

a)

SPP Document 200

b)

SPP Document 201

c)

SPP Document 202

d)

SPP Document 203

36.

Standards of Professional Practice (SPP) on Specialized Architectural Services

a)

SPP Document 205

b)

SPP Document 204-B

c)

SPP Document 204-A

d)

SPP Document 203

37.

Standards of Professional Practice (SPP) on Full-time Supervision Services

a)

SPP Document 205

b)

SPP Document 204-B

c)

SPP Document 204-A

d)

SPP Document 204

38.

Standards of Professional Practice (SPP) on Construction Management Services

a)

SPP Document 205

b)

SPP Document 204-B

c)

SPP Document 204-A

d)

SPP Document 204

39.

Standards of Professional Practice (SPP) on Post-Construction Services

a)

SPP Document 205

b)

SPP Document 207

c)

SPP Document 206

d)

SPP Document 204-B

40.

Standards of Professional Practice (SPP) on Comprehensive Architectural Services

a)

SPP Document 205

b)

SPP Document 207

c)

SPP Document 206

d)

SPP Document 204-B

41.

Standards of Professional Practice (SPP) on Design-Build Services

a)

SPP Document 205

b)

SPP Document 207

c)

SPP Document 206

d)

SPP Document 204-B

42.

Standards of Professional Practice (SPP) on Architectural Design Competition (ADC)

a)

SPP Document 209

b)

SPP Document 208

c)

SPP Document 210

d)

SPP Document 207

43.

Standards of Professional Practice (SPP) on Professional Architectural Consulting Services (PACS)

a)

SPP Document 209

b)

SPP Document 208

c)

SPP Document 210

d)

SPP Document 207

44.

This method of remuneration is particularly suited to engagements involving intermittent personal service. When such consulting services are furnished, the Professional Consulting Architect (PCA) is compensated for all the time he devotes to the work, including travel time.

a)

Per diem or hourly basis

b)

Lump sum or fixed fee

c)

Multiple of direct personnel expenses

d)

Professional fee plus expenses

45.

This method of remuneration is used when the services of a Professional Consulting Architect (PCA) is expected to be required at intervals over a period of time. It is a means of ensuring in advance that his services will be available to the Client when required.

a)

Retainer

b)

Professional fee

c)

Contract bond

47.

Twenty-first-century practice requires architects to adopt an (a)   approach dependent on risk-tolerance, self-awareness, and comfort with unpredictability.

49.

Select all the Design Firm Business Models

a)

Efficiency-based

b)

Experienced-Based

c)

Expertise-based

d)

General Practitioner

e)

Logic-based

50.

In this business model, they serve as expert consultants or are design starts.

a)

Efficiency

b)

Experienced

c)

Expertise

d)

General Practitioner

51.

In this business model, they leverage relationships to acquire projects and collaborate to deliver them.

a)

Efficiency

b)

Experienced

c)

Expertise

d)

General Practitioner

52.

Accepting any project that comes along can lead to a strong generalist practice and can be a strategic choice in itself. What kind of business model are we talking about in this example?

(a)  

53.

A Sole Proprietorship must apply for a Business Name and be registered with the Department of Trade and Industry.

a)

True

b)

False

54.

A partnership with more than three thousand pesos ( 8,000.00) capital must register with Securities and Exchange Commission (SEC). Is this True or False?

a)

True

b)

False

55.

It refers to income tax being paid twice on the same source of income. (a)   occurs when income is taxed at both the corporate level and personal level, as in the case of stock dividends.

56.

Based on the 5 Filipino Architectural Firms that made it on Top 100 2023 list: GFP Architects came in at (a)   spot.

57.

Visionarch specializes on _____ Architecture and _______ Development

a)

Mixed-use, Transit-Oriented

b)

Commercial, Transit-Oriented

c)

Mixed-use, Pedestrian-focused

58.

WTA Architecture and Design Studio is led by their Principal Architect (a)  

59.

Based on the 5 Filipino Architectural Firms that made it on Top 100 2023 list: GFP Architects came in at (a)   spot.

60.

"Architecture is the pursuit of things that make humans live better."

-Abelardo M. Tolentino, Jr. , President and CEO (of what company)

a)

GFP Architects

b)

ASYA

c)

Visionarch

d)

Aidea

61.

This aspect of a Business Plan pertains to the Philosophy / Core Values of an Architectural Firm

a)

Purpose

b)

Financial

c)

Operations

d)

Marketing

62.

This aspect of a Business Plan discusses the Financial Expectations of the owners and their Operating budget over time

a)

Purpose

b)

Financial

c)

Operations

d)

Marketing

63.

This aspect of a Business Plan talks about the Organization Structure of an Architectural Firm, it also provides information on Knowledge Acquisition and Development

a)

Purpose

b)

Financial

c)

Operations

d)

Marketing

64.

Aside from discussing the External Market Conditions and Competition, this aspect of the Business Plan is concerned in determining the Target Market and Branding of an Architectural Firm.

a)

Marketing

b)

Financial

c)

Operations

d)

Purpose

65.

A ___________ is primarily an organizing tool used to simplify and clarify business goals and strategies, which might otherwise appear complex and intimidating. However, a _______is also a sales tool. If it cannot convince at least one other person of the value of your business idea, then either your idea is not worth pursing, or your plan needs major rewriting.

(a)  

66.

Founders with (a)   and integrity about the issues on (Level of Comfot with Collaboration and Tolerance for Risk) can successfully shape a firm based on their own values and proclivities, using their understanding of self as a primary firm design criteria.

67.

In this type of Entrepreneurial Practice, architects keep a tight rein on information, knowledge, and drawings (or models), sharing only the minimum necessary for subconsultants to perform their work.

a)

Control-centered practices

b)

Collaboration-centered practices

c)

Controlled Collaboration practices

d)

Collaboration controlled practices

68.

information, knowledge, and drawings (or models) are readily shared and the entire team participates, to varying degrees, in the co-creation of the design.

a)

Control-centered practices

b)

Collaboration-centered practices

c)

Controlled Collaboration practices

d)

Collaboration controlled practices

69.

is a construction project delivery method that seeks efficiency and involvement of all participants (people, systems, business structures and practices) through all phases of design, fabrication, and construction. IPD combines ideas from integrated practice and lean construction.

(a)  

70.

An Architect's (a)   is very unlikely to cover them for giving valuation advice, as architects are not licensed valuers that issue sworn valuations.

PI

71.

Donating services does not make them any safer because your liability is the same. While it is possible to limit your liability it should be done in writing with legal advice. This falls under what type of risk?

a)

Pro Bono Services

b)

Valuation

c)

Sketch or development documents

d)

Design and documentation without contract administration

72.

Architects who provide partial services should be alert to the liabilities associated with these services. The risk is not as high in this area as in some others, but if you fail to provide the service required by your client and a delay is caused, which results in a loss, legal proceedings could result.

a)

Pro Bono Services

b)

Valuation

c)

Sketch or development documents

d)

Design and documentation without contract administration

74.

If an architecture firm does not ________ well, be it with clients or within the firm itself, it is unlikely to deliver perfection. This only means they are lacking in _______-tion.

(a)  

75.

Oldest recoded code in the world history?

(a)  

76.

What punishment does Hammurabi's code impose on individuals who transgress his law? (Hint: Starts with letter "R" and a formal word type)

(a)  

77.

What topic does R.A. 9266, R.A. 8981, R.A. 386, and R.A. 8293 fall under for Professional Practice 1?

(a)  

78.

R.A. 9266

(a)  

79.

R.A. 8981

(a)  

80.

PRC

(a)  

81.

SEC

(a)  

82.

R.A. 386

(a)  

83.

PRBoA

(a)  

84.

BOA

(a)  

85.

UAP

(a)  

86.

DOLE

(a)  

87.

IAPOA

(a)  

88.

AAIF

(a)  

89.

R.A. 8293

(a)  

90.

How many book/s does have the R.A. 386?

a)

1

b)

2

c)

3

d)

4

91.

How many article/s doe shave the R.A. 9266?

a)

3

b)

4

c)

5

d)

6

92.

Who is the current PRBOA chairman?

a)

Robert Mirafuente

b)

Armando Alli

c)

Robert Sac

d)

Yolanda Reyes

93.

What Specific and its Section can you find this statement: "These drawing duly signed, stamped or sealed as an instrument of service are properties of the architects, whether the object for which they are made is executed or not. It shall be unlawful for any person without the written consent of the architect or authors of said document for use in the repetition of and for other projects or buildings whether executed partly or in whole.

a)

R.A. 386, Section 20

b)

R.A. 9266, Section 20

c)

R.A. 386, Section 15

d)

R.A. 9266, Section 15

94.

CPD

(a)  

95.

IBC

(a)  

96.

NBCP

(a)  

97.

DPWH

(a)  

98.

In the R.A. 8293, how parts were divided?

a)

3

b)

5

c)

7

d)

9

99.

He or she is registered and licensed under R.A. No. 9266, who is directly and professionally responsible for the total design of the project for the client and who shall assume the civil liability for the plans, specifications and contract documents he/she has signed and sealed.

a)

Architect-of-record

b)

Architect-in-charge-of-construction

c)

onsulting Architect

d)

Architect

100.

He or she is a person professionally and academically qualified, registered and licensed under R.A. No. 9266 with a Certificate of Registration and Professional Identification Card issued by the Professional Regulatory Board of Architecture and the Professional Regulation Commission, and who is responsible for advocating the fair and sustainable development, welfare and cultural expression of society's habitat in terms of space, forms and historical context.

a)

Architect-of-record

b)

Architect-in-charge-of-construction

c)

Consulting Architect

d)

Architect

101.

He or she is registered and licensed under R.A. No. 9266, who is professionally and academically qualified and with exceptional or recognized expertise or specialization in any branch of architecture.

a)

Architect-of-record

b)

Architect-in-charge-of-construction

c)

Consulting Architect

d)

Architect

102.

He or she is registered and licensed under R.A. No. 9266, who is directly and professionally responsible and liable for the construction supervision of the project.

a)

Architect-of-record

b)

Architect-in-charge-of-construction

c)

Consulting Architect

d)

Architect

103.

"Architecture" is the science or profession of planning, designing and constructing buildings in their totality taking into account their environment, in accordance with the principles of utility, strength and beauty. (True or False)

a)

True

b)

False

104.

"Structural Conceptualization" means the act of conceiving, choosing and developing the type, disposition, arrangement and proportioning of the structural elements of an architectural work giving due consideration to safety, cost-effectiveness, functionality and aesthetics.

a)

True

b)

False

105.

"Foreign Architect" means an architect who is a Filipino citizen or an Architect registered and licensed in She Philippines, but who is duly registered, and licensed in his/her home country as an Architect.

a)

True

b)

False

106.

Which of the following is not a scope of the practice of architecture?

a)

preparation of preliminary, technical, economic and financial feasibility studies of plans, models and project promotional services

b)

building programming, building administration, construction arbitration and architectural conservation and restoration

c)

all other works, projects and activities which require the professional competence of an architect, including teaching of structural design, hydraulics and geotechnical engineering, etc.

d)

planning, architectural designing and structural conceptualization

107.

This is a duly notarized written contract or equivalent public instrument stipulating the scope of services and guaranteeing compensation of such services to be rendered by an architect registered and licensed under R.A. No. 9266.

a)

Contract

b)

Client-Owner Agreement

c)

Service Agreement

d)

Notarized Affidavit of Service

108.

These are architectural drawings, specifications, and other outputs of an Architect that only an Architect can sign and seal consisting, among others, of vicinity maps, site development plans, architectural program, perspective drawings, architectural floor plans, elevations, sections, ceiling plans, schedules, detailed drawings, technical specifications and cost estimates, and other instruments of service in any form.

a)

Architectural Documents

b)

Contract Documents

c)

Architectural Specifications

d)

Signed and Sealed Plans

109.

These are two (2)-dimensional representations reflecting a proposed development/redevelopment of an enclosed/ semi-enclosed or open area showing features or elements such as columns, walls, partitions, ceiling, stairs, doors, windows, floors, roof, room designations, door and window call-outs, the architectural layout of equipment, furnishings, furniture and the like, specifications callouts, elevation references, drawing references and the like.

a)

Architectural Plans

b)

Orthographic Presentations

c)

Visual Representations

d)

Architectural Construction Drawings

110.

This means a structure for the purpose and function of habitation and other uses.

a)

Allowable Maximum Building Footprint

b)

Building Envelope

c)

Building

d)

Habitable Area

111.

Which is not a contract document?

a)

General Conditions

b)

Drawings

c)

Material Sample

d)

Specifications

112.

Practice of Architecture?

a)

Rule 1

b)

Rule 2

c)

Rule 3

d)

Rule 4

113.

Examination, Registration, and Licensure?

a)

Rule 1

b)

Rule 2

c)

Rule 3

d)

Rule 4

114.

The _____________ shall immediately include in the Commission's program the implementation of this Act, the funding of which shall be included in the annual General Appropriations Act?

a)

Chairperson of PRC

b)

PRBOA Chairman

c)

PRBOA Members

d)

Department of Finance

115.

The government architect-of-record shall collect from the concerned national or local agency including Government Owned and Controlled Corporations (GOCC's) an incentive pay to cover civil liabilities in the equivalent amount of ___ of the project cost of every project provided it shall not exceed 50% of his annual salary which shall be paid upon full completion of the project, The amount intended for the architect who prepared and signed the drawings and specifications shall be included in the Program of Work.

a)

1.0%

b)

1.5%

c)

2.0%

d)

2.5%

116.

Any person or entity, whether public or private, Filipino or foreigner, who/which shall entice, compel, coerce, require or otherwise force an architect registered and licensed under R.A. No. 9266 to undertake/perform any service under the general practice of architecture as defined under R.A. No. 9266, without first executing a written contract/service agreement, shall be guilty of a _________.

a)

Falsification of a Public Document

b)

Misdemeanor

c)

Libel

d)

Crime Involving Moral Turpitude

117.

Any person or entity, whether public or private, Filipino or foreigner , who/which shalt entice, compel, coerce, require or otherwise force an architect registered and licensed under R.A. No. 9266 to undertake/perform any service under the general practice of architecture as defined under R.A. No. 9266, without first executing a written contract/service agreement, shall be guilty of a misdemeanor and shall, upon conviction be sentenced to a fine of not less than or to suffer imprisonment for a period not exceeding six (6) years, or both, at the discretion of the Court.

a)

P200,000.00

b)

P250,000.00

c)

P300,000.00

d)

P100,000.00

118.

Within 60 days after the effectivity of this Act, the Board, subject to the approval of the Commission and in coordination with the IAPOA, shall adopt and promulgate such rules and regulations, Code of Ethical Conduct and Standards of Professional Practice, to carry out the provisions of this Act and which shall be effective 15 days following their publication in the Official Gazette or in major daily newspapers of general circulation

a)

1

b)

2

c)

3

d)

4

119.

Membership in the IAPOA _________ be a bar to membership in other associations of architects.

a)

Shall

b)

Can

c)

Shall not

d)

May

120.

That such an organization shall be registered with the ________, as a non-profit, non-stock corporation to be governed by by-laws providing for a democratic election of its officials.

a)

PRC

b)

City Hall

c)

SEC

d)

DTI

121.

Architecture profession shall be integrated into ________ which shall be accredited by the Board.

a)

1 National Organization

b)

2 National Organizations

c)

3 Autonomous Organizations

d)

4 National and Autonomous Organizations

122.

The implementing rules and regulations for such a requirement for practice shall be implemented by the Board in consultation with the integrated and accredited professional organization of architects within _ months

a)

4

b)

5

c)

6

d)

7

123.

Registered and licensed architects shall compose at least __ percent of the owners, shareholders, members, incorporators, directors, and executive officers.

a)

65

b)

70

c)

75

d)

80

124.

Any person who shall violate any of the provisions of R.A. No. 9266, its IRR, the Code of Ethical Conduct and SPP, or any policy of the Board and the Commission be sentenced to suffer imprisonment

a)

for a period not less than four (4) months or not exceeding six (4) years or both

b)

for a period not less than five (5) months or not exceeding five (5) years or both

c)

for a period not less than six (6) months or not exceeding six (6) years or both

d)

for a period not less than seven (7) months or not exceeding six (7) years or both

125.

They may become CPD providers upon accreditation by the Board.

a)

a. Businessmen

b)

Other Entities or Organizations

c)

CHED - accredited university

d)

Autonomous university

126.

Sundry Provisions

a)

Rule 1

b)

Rule 2

c)

Rule 3

d)

Rule 4

127.

Government Agency which recognizes Architecture schools

a)

DEPED

b)

TESDA

c)

UAP

d)

CHED

128.

Government Agency which regulates the practice of Architecture

a)

UAP

b)

CHED

c)

PRC

d)

SEC

129.

Under the Civil Code, how long (number of years) is the liability of the Architect for the regular design of structures:

a)

10 years

b)

1 year

c)

3 years

d)

15 years

130.

The Record of Apprenticeship activities

a)

Activity Ledger

b)

Construction Record

c)

Logbook of Construction

d)

Logbook of Diversified Experience

131.

Minimum number of hours required for the Diversified Training Experience

a)

2840 hours

b)

3480 hours

c)

4480 hours

d)

3840 hours

132.

Minimum number of year/s required for the Diversified Training Experience

a)

1

b)

2

c)

3

d)

4

133.

If an individual already holds a Master's degree in architecture, how many years of Diversified Training Experience are required?

a)

1

b)

2

c)

3

d)

4

e)

No need to take Diversified Training Experience

134.

Can an architect who is a member of UAP eligible to join other organizations of architects, say Philippine Institute of Architects?

a)

Yes

b)

No

c)

Yes. If he is a non-delinquent

d)

No. Loyalty shall be retained to one-organization only.

135.

the process of identifying, assessing, and

controlling threats to an organization’s capital or

earnings.

a)

Project

Risk

b)

Risk

Assessment

c)

Risk

Management

d)

Risk

Control

136.

refers to an argument or a

disagreement between two parties over an issue. In the

project management perspective, disputes involve

disagreements or arguments within the project team.

a)

Project

Risk

b)

Project

Claims

c)

Project

Disputes

d)

Risk

Assesment

137.

General liability insurance can help protect you and

your firm from the financial repercussions from

lawsuits that claims personal injury, client injury, or

intended property damage.

a)

TRUE

b)

FALSE

138.

Project managers are typically engaged throughout

the design process.

a)

TRUE

b)

FALSE

139.

_______ are responsible for ensuring that the

finished product of the construction project is safely

and appropriately constructed. They make sure

that the project is as efficient as possible, reducing

costs while maintaining necessary safety features.

a)

Architects

b)

Engineers

c)

Workers

d)

Inspectors

140.

an approach to procurement that weighs

the overall value delivered through a vendor relationship

rather than the simple cost of the product or service provided

by a vendor and also builds relationships between firms and

their supplier that they trust.

a)

Project

Management

b)

Risk

Management

c)

Project

Sourcing

d)

Supply

Manangement

141.

a way to build relationships between

firms and their supplier that they could trust.

a)

Project

Management

b)

Construction

Management

c)

Project

Sourcing

d)

Supply

Management

142.

represents what the firm plans to invoice

clients for their architectural services

rendered

a)

Net Income

Goal

b)

Profit

Goal

c)

Gross

Revenue Goal

d)

Net Revenue

Goal

143.

-the firm's return on investment (ROI)

-percentage of net revenues, after

expenses and before taxes.

a)

Income Goal

b)

Revenue Goal

c)

Profit Goal

d)

Return Goal

144.

manages people and time over the course of

specified project-related activities.

a)

Project

Management

b)

Financial

Management

c)

Financial

Planning

d)

Financial

Health

145.

The ASEAN delegated authority that are responsible for

the administration of the Project in each

participating economy

a)

ASEAN Monitoring

Committees

b)

ASEAN Central

Committees

c)

ASEAN Central

Council

d)

ASEAN

Council

146.

ASEAN Monitoring committees are subject to periodic

review by the Prtofessional Regulation Authority.

a)

TRUE

b)

FALSE

147.

Overall authorized body for the control and

management of the APEC Architect framework.

a)

ASEAN Central

Council

b)

ASEAN Central

Committee

c)

ASEAN

Monitoring Committee

d)

ASEAN Professional

Regulating Authority

148.

The Secretarial is Responsible for providing administrative services

for the APEC Architect Central Council

a)

TRUE

b)

FALSE

149.

The member APEC economy acting as

Secretariat will also act as host for

the Central Council Meeting

a)

TRUE

b)

FALSE

150.

allow countries to accept each other’s final results &

quality assurance.

a)

Reciprocity

b)

Mutual Defense

Agreement

c)

Mutual Recognition

Agreement

d)

Globalization

151.

ASEAN ARCHITECTS SIGNIFICANT WORK means

___ years in charge of significant architectural work

a)

2 years

b)

5 years

c)

10 years

d)

8 years

152.

ASEAN Architects should have Practical and diversified experience of not

less than ____ years of continuous practice of architecture after grad

And at least 5 years of licensed experience

a)

2 years

b)

3 years

c)

5 years

d)

10 years

153.

Foreign nationals shall be required to work with a Filipino counterpart

and shall also be responsible for public utilities and taxes due to

the Philippine government,

a)

TRUE

b)

FALSE

154.

Maintains overall AAR throughout the participating Member

countries.

a)

ACC

b)

PRA

c)

PRC

d)

MRA

155.

A profession involving the design implementation,

evaluation, and maintenance of the process of work within

an office or other organization, in order to sustain and

improve efficiency and productivity.

a)

Project

Management

b)

Office

Organization

c)

Design

Management

d)

Office Project

Management

156.

provides an overall framework

within which individual projects are commissioned,

designed, and completed.

a)

Design

Management

b)

Project

Management

c)

Office

Management

d)

Construction

Management

157.

In construction it involves

implementing measures and procedures in

order to reduce the number and severity of

risks in construction projects.

a)

Risk

Identification

b)

Risk

Implementation

c)

Risk

Management

d)

Construction

Risk

158.

UAP Document 300 Code of Ethical Conduct 4.10– The architect

shall include in his/her agreement with the Client a clause

providing for negotiation, mediation/conciliation and/or

arbitration as alternative methods for the settlement of disputes.

a)

TRUE

b)

FALSE

159.

It is commonly defined as any voluntary initiated cooperative

agreement between firms that involves exchange, sharing,

or co-development and it can include contributions by

partners of capital, technology, or firm-specific assets.

a)

Mutual

Relation

Agreement

b)

Inter-Firm

Alliances

c)

Joint

Venture

d)

Project

Collaboration

160.

An association of two or more entities for the

purpose of performing a design-build project.

a)

Project

Partnership

b)

Inter-Firm

Alliances

c)

Design

Collaboration

d)

Joint

Venture

161.

The simplest form of Marketing.

a)

Digital

Marketing

b)

Social

Networking

c)

Business

Card

d)

Advertisement

162.

Summarizes the distinctive feature of the firm and initiates a dialogue in brief amount of time.

a)

Business

Card

b)

Portfolio

c)

Elevator

Pitch

d)

Digital

Content

163.

Volunteer Work.

a)

Social

Service

b)

Pro Bono

c)

Nationalism

d)

Community

Service

164.

Website, blogs and social media.

a)

Digital

Networking

b)

Out-sourcing

c)

Digital

Platforms

d)

Creative

Media

165.

A system which enables the transfer of money

between investors and borrowers.

a)

Accounting

System

b)

Financial

Management

c)

Cash Flow

d)

Business

Management

166.

They offer services to the organizations who want to raise funds from the markets and take care of financial assets.

a)

Financial

Markets

b)

Financial

Investors

c)

Financial

Institutions

d)

Financial

Instruments

167.

Deciding in advance how much to spend, on what to

spend according to the funds at your disposal.

a)

Financial

Decision

b)

Financial

Planning

c)

Financial

Strategies

d)

Financial

Utilization

168.

The ability to control capital in order to meet expenses,

make investments, and create profits is the measure of

a company's _______________.

a)

Financial

Planning

b)

Financial

Goal

c)

Financial

Health

d)

Financial

Capability

169.

Economy of permanent residence and primary registration/licensure as an architect.

a)

Host

Economy

b)

Home

Economy

c)

Resident

Economy

d)

Origin

Economy

170.

Economy of secondary registration/ licensure as an architect.

a)

Host

Economy

b)

Home

Economy

c)

Secondary

Economy

d)

Business

Economy

171.

Independent committee formed by a participating economy, with delegated authority of the Central Council to maintain a section of the APEC Architect Register in its economy and to act as nominating body for

the Central Council.

a)

APEC

Committee

b)

Monitoring

Committee

c)

Central

Committee

d)

Professional

Regulatory

Committee

172.

Authority responsible for the registration/licensure or recognition of persons permitted to offer professional services as an architect.

a)

Regulatory

Authority

b)

Monitoring Committee:

c)

Central

Council

d)

Regulation

Commission

173.

the cross-border trade in

goods, services, technology, investment,

people, and information.

a)

Trading

b)

Business

c)

Globalization

d)

Economic

Partnership

174.

means a globally and uniformly applied practice of a

Multinational, restricting alienation of equity in or the sale of business in its

regional operations.

a)

Homogeneous

Practice

b)

Global

Practice

c)

Globalization

d)

Economic

Partnership

175.

A regional grouping that aims to promote economic and security

cooperation among its ten members.

a)

APEC

b)

ASEAN

176.

Mutual recognition agreements are contractual arrangements subject to which countries, standards agencies or professional organizations agree to recognize the equivalence of another country’s technical regulations, sanitary or phytosanitary measures or, in the case of natural persons, their academic or professional qualifications.

a)

TRUE

b)

FALSE

177.

An ASEAN Architect will be able to practice architecture in the specific projects in which he/she has been adjudged to be competent

under the ASEAN MRA on Architectural Services.

a)

TRUE

b)

FALSE

178.

REPUBLIC ACT NO. 9266 IS THE main law governing

the architecture profession in the Philippines.

a)

TRUE

b)

FALSE

179.

Foreign citizens may be allowed to take licensure exam only if the country of the foreign citizens admits Filipinos to practise the same profession without restriction or allows Filipinos to practise after passing the exam on equal terms with the foreign citizens, including mutual recognition of degrees/diplomas;

a)

TRUE

b)

FALSE

180.

AoR can sign any branch of work for any function of architectural practice, NOT performed by him/her.

a)

TRUE

b)

FALSE

c)

MAYBE

d)

IT DEPENDS

181.

A candidate must obtained a General Average of __ %, with a grade not lower than __% to the subjects given to pass the ALE.

a)

75-50

b)

70-50

c)

50-70

d)

50-75

182.

Ms. Garcia is a Master's Degree holder of Architecture from a college recognized by the government, how many years of practical experience she have to complete to qualify for taking the ALE?

a)

1 year

b)

2 years

c)

6 months

d)

NONE, she can take the ALE right away in view of the fact that she's already a holder of Master's degree in Architecture.

183.

They have the power to suspend the validity of a PIC.

a)

President of the Philippines

b)

PRC

c)

Board

d)

Secretary

184.

R.A. 10912 is what LAW?

a)

ASEAN

b)

AIPO/APO

c)

CS

d)

CPD

185.

It refers to the inculcation of advanced knowledge, skills and ethical values in a post-licensure specialization or in an inter- or multidisciplinary field of study, for assimilation into professional practice, self-directed research and/or lifelong learning

a)

Architectural Research

b)

Knowledge Process Outsourcing

c)

Architectural Programming

d)

Continuing Professional Development

186.

It refers to the quality assured national system for the development, recognition and award of qualifications at defined levels, based on standards of knowledge, skills and values, acquired in different ways and methods by learners and workers.

a)

Philippine Qualifications Framework (PQF)

b)

Professional Regulation Commission (PRC)

c)

Knowledge Process Outsourcing (KPO)

d)

ASEAN Mutual Recognition Arrangement

187.

(As of July 1, 2017)

They are all ASEAN Architects, except.

a)

RENATO A. HERAY

b)

 MIGUEL C. GUERRERO

c)

ROBERT S. SAC

d)

FROILAN L. HONG

188.

One of the Qualifications to Become an ASEAN Architect:

The education for architects should not be less than __ years duration delivered on a full time basis in an accredited program in an accredited/ validated university in the Country of Origin while allowing flexibility for equivalency.

a)

5 years

b)

10 years

c)

2 years

d)

3 years

189.

Who is entitled to collect the Professional Fees for Architectural Services?

a)

Project Manager

b)

Representative of a RLA

c)

Admin/ HR

d)

Draftsman

190.

A firm, company, partnership, corp or association may be registered for the Practice of Architecture if the RLA(s) shall compose at least how many percent of the owners, members incorp., executive officers, shareholders, as the case may be.

a)

50%

b)

70%

c)

75%

d)

80%

191.

Who is the current PRC OUTSTANDING ARCHITECT?

a)

Otilio A. Arellano

b)

Yolanda D. Reyes

c)

Robert S. Sac

d)

Arnold P. De Asis

192.

Under PD 953:

Fine for cutting/destroying trees along public places or banks of rivers/creeks shall be punished with imprisonment __________; fine of ________; or both

a)

2 months- 2 years; 500-5,000

b)

6 months- 2 years; 500-5,000

c)

2 years- 6 years; 5000-10,000

d)

2 years-15 years; 5000-10,000

193.

SEC

a)

Securities & Exchange Commission

b)

Society & Enhanced Corporation

c)

Security & Exchange Commission

d)

System Ecological Campaign

194.

The selection committee may visit buildings designed by the Architect and check the references such as former clients and financial institutions

a)

Checking

b)

Evaluation

c)

Verification

d)

Confirmation

195.

He/She provides full information to his requirements for the Project

a)

Architect-of-Records

b)

Contractor

c)

Project Manager

d)

Owner

196.

Specialized Architectural Services, except.

a)

AI

b)

Preliminary Services

c)

SDP

d)

Value Management

197.

Which of the following is under SPP Doc 205 - Post Construction Services

a)

Building & Facilities Evaluation

b)

Building Components

c)

Construction Phase

d)

Promotional Services

198.

Design Build Services w/ guaranteed max PCC:

A project construction cost is guaranteed by an Architect not to exceed ___ % of the estimated project construction cost.

a)

7%

b)

90%

c)

10%

d)

5%

199.

For ADC (Architectural Design Competitions), the Jury shall composed of the smallest reasonable number of persons and should not exceed _.

a)

4

b)

3

c)

5

d)

7

200.

When did the economic integration of ASEAN start?

a)

2014

b)

2015

c)

2016

d)

2017

201.

The ASEAN is a regional intergovernmental group of _______ nations that promotes economic, political and security Cooperation among its members.

a)

10 Southeast Asian

b)

3 Middle East

c)

7 European

d)

5 South African

202.

Identify the which is NOT a member of ASEAN.

a)

Laos

b)

Cambodia

c)

Vietnam

d)

Madagascar

203.

What does ASEAN stand for?

a)

Association of Soul Earth Asian Nations

b)

Association of South East Asian Nations

c)

Association of Small East Asian Nations

d)

Association of Stone East Asian Nations

204.

Currently, ASEAN consists of some countries

a)

Thailand, Laos, Cambodia, Myanmar, Malaysia, Brunei, Philippines, Indonesia, Vietnam, Singapore

b)

Laos, Cambodia, Myanmar, Malaysia, Brunei, Philippines, Indonesia, Vietnam, Singapore

c)

Thailand, Cambodia, Myanmar, Malaysia, Brunei, Philippines, Indonesia, Vietnam,

d)

Myanmar, Malaysia, Brunei, Philippines, Indonesia, Vietnam, Singapore

205.

Which region of the world is ASEAN located?

a)

East Asia

b)

Southeast Asia

c)

Northwest Asia

d)

West Asia

206.

Which ASEAN state member has this national flag?

a)

Cambodia

b)

Vietnam

c)

Myanmar

d)

Singapore

207.

What are the purposes of ASEAN? (choose 2 options, please)

a)

to promote regional peace and stability among its member

b)

to develop one big nation in Southeast Asia

c)

to conquer other nations in the world.

d)

to accelerate the economic growth among its members.

208.
Which country is not in Southeast Asia?
a)
Malaysia, Singapore, Brunei Darussalam
b)
Philippines, Thailand, Myanmar
c)
Laos, Cambodia, Vietnam
d)
Japan, China, Australia
209.

Which is the flag of Thailand?

a)
b)
c)
210.

What part of the Architect’s services is site selection and analysis?

a)

Contract documents

b)

Schematic design

c)

Design development

d)

Pre-design

211.

What is the role of the project Manager during the Pre-Construction phase of the project?

a)

Recommends early purchase of equipment/materials requiring a long lead for procurement and delivery for expediency

b)

Observes work in progress to assure compliance with drawings/specification

c)

Manages general coordination and scheduling of work

d)

Revise and refines estimates as construction proceeds

212.

In a typical owner-architect agreement, which of the following is NOT part of architect’s professional fees?

a)

Income taxes on professional fees

b)

Five sets of plans and contract documents

c)

Surveys and soil exploration

d)

Mechanical/electrical engineering

213.

Which of the following does NOT constitute the post-construction services of the architect?

a)

Real property evaluation

b)

Post-construction evaluation

c)

Building/ground administration

d)

Building/equipment maintenance

214.

What is the minimum basic fee for parking structures with a project construction cost of P40M?

a)

P 2.4 M

b)

P 2.8M

c)

P 3.2 M

d)

P 3.6M

215.

What method of compensation is most suitable for compensating the Architect's services for the pre-design phase?

a)

multiple of direct personnel expense

b)

lump sum or fixed fee

c)

per-diem plus reimbursible expenses

d)

professional fee plus expenses

216.

Which is a prohibition in the practice of Architecture?

a)

a person claiming architectural work without using the title "Architect"

b)

a person enticing a registered architect to first execute a written contract

c)

solicitation of architectural work by registered architects

d)

a government architect signing for architectural plans prepared under his supervision

217.

Included under Part 1 of a three-part section specification format.

 

a)

General Requirements

b)

Mixes

c)

Fabrication

d)

Installation

218.

Which is not true for Consulting Architect?

a)

assumes civil liability

b)

with exceptional expertise

c)

licensed Architect

d)

with academic qualifications

219.

The Project Construction Cost referred to in the compensation of the Architect for his Regular Design Fee means the cost of the completed structure which include one of the following:

a)

grottos

b)

movable pieces of furniture

c)

swimming pool

d)

communications and electronic system

220.

Duly notarized written contract or equivalent public instrument stipulating the scope of services and guaranteeing compensation of such services.

a)

service agreement

b)

general conditions

c)

Surety

d)

project manual

221.

Which does not comply with the conditions for foreign nationals to secure temporary/special permits.

a)

a citizen of a country where Filipino architects are permitted to practice

b)

legally qualified to practice in his country

c)

working with a Filipino counterpart

d)

many Filipino Architects have similar expertise and specialization

Similar Resources on Wayground