Font size
WorksheetsICA - AREA A (SET 1 REVIEW)
Total questions: 57
Worksheet time: 34mins
These two Filipino Architects were brought to Europe to study Master
Builder Course.
TOMAS MAPUA & CARLOS BARETTO
DIEGO HERVAS & CARLOS BARETTO
CARLOS BARETTO & FELIX ROXAS
FELIX ROXAS & DIEGO HERVAS
THE PERFECTIONIST, WAS OFTEN DISSATISFIED WITH HIMSELF AND HIS WORK
MICHELANGELO
MIMAR SINAN
ANTONI GAUDI
FRANK LLOYD WRIGHT
Which of the following is not correct?
The architect-in-charge of constrcuction shall be fully responsible for all architectural plans, specifications and other documents issued under his/her seal or authorized signature.
Drawings and specifications duly signed, stamped or sealed, as instruments of service, are the intellectual properties and documents of the architect, whether the object for which they are made is executed or not, It shall be unlawful for any person, without the consent of the architect or author of said documents, to duplicate or to make copies of said documents for use in the repetition of and for other projects or buildings, whether executed partly or in whole.
All architectural plans, designs, specifications, drawings and architectural documents relative to the construction of a building shall bear the seal and signature only of an architect registered and licensed under this Act together with his/her professional identification card number and the date of its expiration.
It shall be unlawful for any architect to sign his/her name, affix his/her seal or use any other method of signature on architectural plans, specifications or other documents made under another architect’s supervision, unless the same is made in such manner as to clearly indicate the part or parts of such work actually performed by the former.
Which of the following is not a scope of work of an consulting architect?
Preparing and signing/sealed drawings for building permit purposes
Giving oral and written advice on the proposed project.
Evaluating the feasibility studies and drawings.
Appraisals and adjustments on the pre-design services
EGYPTIAN ARCHITECTURE IS CHARACTERIZED BY?
MASSIVENESS AND ORNAMENTATION
VERY ORNATE
MONUMENTAL AND TRABEATED
HIGHLY DECORATIVE
The ...................... Services cover a broad line of architectural services ranging from initial problem identification to activities that would allow the Architect to initially conceptualize an array of architectural and allied solutions. The ...................... Services nominally include consultation, pre-feasibility studies, feasibility studies, site selection and analysis, site utilization and land-use studies, architectural research, architectural programming, space planning, space management studies, value management, design brief preparation, promotional services and other related activities.
Pre- Design
Design
architectural plans
Architect of Metropolitan Theatre
JUAN ARELLANO
BOBBY MANOSA
JUAN NAKPIL
TOMAS MAPUA
STIPULATION OF THE USE OF SPECIFIC PROCUCTS OR PROCESS WITHOUT PROVISION FOR SUBSTITUTION IS A
BILL OF MATERIALS
CLOSED SPECIFICATIONS
MANUFACTURERS SPECIFICATIONS
OPEN SPECIFICATIONS
A developer commissioned a foreign architectural firm to conceptualized the design their headquarters. When the concept design was finalized , they developer hired a local architectural firm to do the design development and construction documents. Which of the following is the function of the local architectural firm?
Architect-of-Record
Architect-in-charge of construction
Consulting Architect
Interior Architect
IT USES VARIATION IN LIGHTNESS AND SATURATION OF A SINGLE COLOR
MONOCHROMATIC
SUPLEMENTARY
COMPLEMENTARY
ANALOGOUS
In case a violation of the practice of architecture under RA9266 has been committed by an individual, entity, e.g. non-execution of service agreement and other prohibited practices, what case in court this person or entity be found guilty or convicted?
CIVIL CASE
CRIMINAL CASE
MISDEMEANOR
CALM, RESPONSIBLE, SADNESS
BLUE
GRAY
YELLOW
PURPLE
NEW BEGINNINGS, ABUNDANCE, NATURE
BLUE
GREEN
YELLOW
RED
SPP is ? ( ALL CAPS)
(a)
PRBoA is? (ALL CAPS)
(a)
Juanita dela Cruz, took the Architecture Board Examination and obtained a weighted general average of 75%, however her rating in structural design is 48%, did she passed the licensure examination?
NO
YES
DEPENDS
PRC IS
(a)
Architect Froilan Hong attempted to get the essence of the Parthenon in
accordance with the wishes of the First Lady, Imelda R. Marcos. The
result is probably not entirely satisfactory. What do you call this structure?
MANILA FILM CENTER
PICC
FOLKS ART THEATER
He was considered as “Young with Flair” architect of the Philippine
Contemporary Architecture?
LEANDRO LOCSIN
BOBBY MANOSA
MELOY CASAS
IAPOA IS
(a)
It is considered as the 1st skyscraper in the Philippines having 12-storeys
designed by Angel Nakpil.
PICACHE BUILDING
INSULAR LIFE BUILDING
ZUELIG BUILDING
The Architect explains to the Client the Scope of Services and the Architect’s Fee as prescribed under the Architect’s Guidelines
Verification
Evaluation & Ranking
. Negotiation
These preliminary studies involve the procurement, analysis and use of secondary information gathered for the project to aid the Client in early decision-making. They represent the Architect’s initial assessment of a project’s soundness, allowing the Client to promptly explore available/ readily identifiable directions/ options. Researched/ processed/ validated secondary data are generally used for such studies e.g. electronic, print, etc.
Consultation
Pre-Feasibility Studies
Feasibility Studies
This analytical problem-seeking process will lead to the statement and identification of both horizontal and vertical requirements in offering a solution. It incorporates a space program with characterizations of the envisioned spaces such as ambiance, cost range, etc.
Site Utilization and Land-Use Studies
Architectural Research
Architectural Programming
Space Planning
minimum Rooms for Human Habitation
6.00 sq. m
3.00 sq. m
1.20 sq. m
Minimum Ceiling Ht. for Habitable Rooms with Artificial Ventilation
2.40 m
2.70
The ceiling / roof of the Parish of the Holy Sacrifice in UP Diliman in made
of concrete by using what type of construction?
THIN SHELL CONSTRUCTION
CONCRETE DOME
GEODESIC DOME
PARAMETRIC CONSTRUCTION
An Arts School building in Germany that is focused on formal elements
(shape, color, lines etc.).
Guggenheim
Bauhaus
New building materials brought by the industrial revolution.
I. steam engine, spinning jenny, telephone
II. bricks, ceramic tiles, corrugated G.I. sheet
III. steam boat, cesna plane, bicycle
IV. cast iron, steel and glass
IV ONLY
I AND II
II ONLY
III ONLY
what is P .D 1185?
BUILDING CODE
FIRE CODE
Subdivision & Condominium Law
Economic Housing
Minimum Ceiling Ht. for Habitable Rooms with Natural Ventilation
2.40
2.70
minimum Toilet & Bath
6.00 sq. m
3.00 sq. m
1.20 sq. m
minimum Kitchens
6.00 sq. m
3.00 sq. m
1.20 sq. m
the Low-income single detached living units w/ individual lot size not more than .............
100 sq. m
150 sq. m
90 sq. m
190 sq. m
The first private school to offer an academic title for Maestro de Obras in the Philippines
UP
UST
Liceo de Manila
It is the First Headquarters of the Philippine National Bank which is
located in Escolta. It is also considered as the first multi-structure and
concrete building in the Philippines
MASONIC TEMPLE
CRYSTAL ARCADE
CALVO BUILDING
WHAT IS THE MEANING OF PRBOA?
Architecture is defined under RA 9266 and is in accordance with the principles of utility, strength and beauty, a theory by.........
ARISTOTLE
VITRUVIUS
EINSTEIN
MANOSA
In 1977, the promulgation of the National Building Code of the Philippines, this law is
PD 1096
RA 9266
PD957
This phase consists of the preparation of schematic design studies derived from the Project Definition Phase, leading to conceptual plans.
S
Arhitectual programming phase
Schematic Design Phase
The first registration of architects as a profession, was implemented in the Philippines in year 1950.
TRUE
FALSE
An RLA, who is directly responsible for the total design of the project, assume the civil liability for the plans he/she has signed and sealed.
AiCC
CA
AoR
Juan dela Cruz, a Filipino RLA established his design office in Hongkong and practice architecture in the Philippines, is this legally allowed?
NO
YES
DEPENDS
What is the equivalent of a 2-year Master's degree in Architecture to the practical diversified experience, a requirement in applying for the Architecture Board Examination?
1 YEAR
2 YEARS
3 YEARS
4 YEARS
BP344 is (ALL CAPS)
(a)
PD 1096 is (ALL CAPS)
(a)
Johnny dela Cruz, a graduate of Architecture with considerable years of experience in an architectural firm as a designer, placed in his name-card the title under his name as "Architectural Designer", is this allowed on the legal point of view?
NO
YES
DEPENDS
Who is the Architect of the Antipolo Church?
BOBBY MANOSA
JOSE DE OCAMPO
FELIX ROXAS
TOMAS MAPUA
The following are the qualifications in taking the Architecture Licensure Exam except ___.
Filipino citizen
Not been convicted of any criminal offensive involving moral turpitude.
Degree Holder of Bachelor of Science in Architecture
None of these
Which of the following is not part of scope of work of an architect-in charge in construction?
Contract Documents
Supervision
Project Planning
Site Inspection
What core values does the architect have if he/she has critical judgment, deep insights and a level of discretion that comes from a comprehensive understanding of the whole?
Prudence
Integrity
Leadership
Prudence
means the act of conceiving, choosing and developing the type, disposition, arrangement and proportioning of the structural elements of an architectural work giving due consideration to safety, cost-effectiveness, functionality and aesthetics
Architectural Firm
Scope of the Practice of Architecture
Structural Conceptualization
Architect-of-record
AS PER OLD SPP, THE FREE OF THE ARCITECT FOR DESIGN-BUILD SERVICES BY ADMINISTRATION ASIDE FROM HIS FEE FOR THE REGULAR DESIGN SERVICES IS
6%
7%
8%
10%
Who shall pay for the cost of all permits, licenses and other incidentals to the work?
ARCHITECT
OWNER
ARCHITECT-IN-CHARGE
CONTRACTOR
AN ACT PROVIDING FOR A MORE RESPONSIVE AND COMPREHENSIVE REGULATION
FOR THE REGISTRATION, LICENSING AND PRACTICE OF ARCHITECTURE, REPEALING
FOR THE PURPOSE REPUBLIC ACT NO. 545, AS AMENDED, OTHERWISE KNOWN AS "AN
ACT TO REGULATE THE PRACTICE OF ARCHITECTURE IN THE PHILIPPINES," AND FOR
OTHER PURPOSES
REPUBLIC ACT NO. 9966
REPUBLIC ACT NO. 9226
REPUBLIC ACT NO. 9266
REPUBLIC ACT NO. 9666
Architect of Lung Center and Heart Center
FROILAN HONG
FELIX ROXAS
CARLOS CANTOS VIOLA
JORGE RAMOS
a place where Muslims worship and pray to God.
mosque
pulpit
niche
