wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

BBB - SO HARD

Total questions: 46

Worksheet time: 23mins

Name
Class
Date
1.

Given 27 seats in an assembly area how many accessible wheelchair spaces are required?

a)

2

b)

5

c)

4

d)

1

2.

What is the minimum width for an exit stairway in a parking garage?

a)

42 in

b)

32 in

c)

24 in

d)

36 in

3.

If a building official finds a structure to be unsafe what shall be done?

a)

A notice to either make safe or demolish shall be issued

b)

A notice to abandon shall be issued

c)

The building official shall have the structure demolished

d)

The building official shall give notice of impending legal action

4.

Other than exceptions until what height are projections into the public right of way prohibited?

a)

10 ft

b)

20 ft

c)

8 ft

d)

15 ft

5.

All residential group occupancies must be equipped with automatic sprinkler systems and what else?

a)

Smoke alarms

b)

Smoke suppression system

c)

Smoke evacuation system

d)

Smoke barriers

6.

What is the maximum spacing of 2x4 studs in a bearing wall supporting roof and ceiling only?

a)

16 in

b)

32 in

c)

24 in

d)

20 in

7.

High-rise buildings shall have what kind of additional power provided?

a)

Emergency and standby power

b)

Emergency power

8.

In a public parking garage where must vehicle barriers be placed?

a)

2 ft from changes in elevation

b)

4 ft from changes in elevation

c)

Ends of elevations

d)

End of drive lanes

9.

Fire retardant wood has a flame spread index of what?

a)

25

b)

75

c)

250

d)

50

10.

What type of construction has exterior walls and interior elements of noncombustible materials?

a)

Type III

b)

Type IV

c)

Type F

d)

Type V

11.

Open parking garages must comply with which section?

a)

406.5

b)

405.3.2

c)

406.9.2

d)

409.2.5

12.

What is the maximum area of a structural piece of exterior glass veneer?

a)

12 ft

b)

20 ft

c)

10 ft

d)

9 ft

13.

Where shall the roof and floor design loads be posted?

a)

On a singular load bearing column

b)

The foundation of the building

c)

Each story of the building

d)

On the lowest story of the building

14.

How long is a permit valid after issuance if work is not commenced immediately?

a)

90 Days

b)

75 Days

c)

365 Days

d)

180 Days

15.

Where is fastening required on double studs?

a)

Face nail

b)

Toe nail

c)

Base nail

d)

Top nail

16.

Covered and closed mall buildings shall be equipped with what?

a)

Chemical standpipe system

b)

Wet standpipe system

c)

Dry standpipe system

d)

Oversized standpipe system

17.

What kind of department does not need a permit to install generation or metering equipment?

a)

Rail road

b)

Commercial development corporation

c)

Public Service Agency

d)

Homeowners association

18.

What is the most lenient type of construction?

a)

Type V

b)

Type I

c)

Type II

d)

Type III

19.

In the verification and inspection of cast in place deep foundation elements what is the second inspection that is required?

a)

Verification of placement

b)

Verification of strength

c)

Verification of steel

d)

Verification of location and plumbness

20.

An interior finish in a sprinklered Group F occupancy shall be of what class in an exit stairway?

a)

B

b)

C

c)

F

d)

A

21.

Thresholds for sliding doors serving dwelling units shall not exceed how much?

a)

4/16 in

b)

1 in

c)

1/2 in

d)

3/4 in

22.

Who determines the additional fee value for work that is commenced before permit issuance?

a)

The plans examiner through valuation

b)

The permit technician

c)

The building inspector during construction

d)

The building official through a valuation

23.

What is an example of Group I-3?

a)

Jails

b)

Churches

c)

Halfway houses

d)

Colleges

24.

What is the fourth inspection required?

a)

Placement of concrete inspection

b)

Roofing inspection

c)

Frame inspection

d)

Cast in place foundation elements inspection

25.

What is the range in which handrails shall be located in?

a)

36 in by 48 in

b)

34 in by 38 in

c)

24 in by 24 in

d)

36 in by 36 in

26.

A masonry wall that is 9-4 ft high with 5 in of backfill shall have what size # bar at 30 psf?

a)

6

b)

4

c)

8

d)

2

27.

In a Group F-1 occupancy how many water fountains shall be present?

a)

1 per 400

b)

1 per 250

c)

1 per 100

d)

1 per 300

28.

Flashing of metal shall not be less than what thickness?

a)

.020 in

b)

.125 in

c)

.255 in

d)

.019 in

29.

What is the minimum width of shallow foundation footings below undisturbed ground surface?

a)

6 in

b)

25 in

c)

12 in

d)

20 in

30.

Other than doors to a hoist way, elevator machine room, machinery space, control rooms or control spaces within an elevator lobby, doors leading into elevator lobby enclosures shall be provided with what fire rating?

a)

1/2 hr

b)

3/4 hr

c)

2/3 hr

d)

1/3 hr

31.

Aggregate accessory occupancies shall not occupy more than how much of the building area of the story which they are located on?

a)

25 percent

b)

10 percent

c)

15 percent

d)

50 percent

32.

What is one of the criteria that shall determine if soil is expansive?

a)

Expansion index greater than 100 in accordance with ASTM D4829

b)

Expansion index greater than 40 in accordance with ASTM D4829

c)

Expansion index greater than 50 in accordance with ASTM D4829

d)

Índice de expansão maior que 20 de acordo com a norma ASTM D4829

33.

Bearing exterior walls in type II-B construction shall have a fire resistance rating of what?

a)

0

b)

4

c)

2

d)

1

34.

How many days may a building official grant additional period of extension?

a)

180 Days

b)

75 Days

c)

360 Days

d)

90 Days

35.

May a building official authorizing in writing a period of extension not more than?

a)

180 Days

b)

75 Days

c)

360 Days

d)

90 Days

36.

One story buildings of no more than one story above grade plane of Group B-F-M or S with public ways not less than 60 ft in width shall not be limited in space given what?

a)

Smoke control system

b)

Standpipe system

c)

Automatic sprinkler system

d)

Automatic smoke suppression system

37.

What shall be the clear width of an accessible means of egress stairway between handrails in an unsprinklered building?

a)

24 in

b)

48 in

c)

36 in

d)

52 in

38.

An accessible stairway must have a minimum of ________width?

a)

24 in

b)

48 in

c)

36 in

d)

52 in

39.

Deep foundation bracing elements shall be subject to the approval of who?

who prepar it ? Registered design professional

a)

Registered design professional

b)

Contractor

c)

Building official

d)

City engineering department

40.

Incidental use buildings shall not take up more than how much of the building area?

a)

15 percent

b)

10 percent

c)

25 percent

d)

35 percent

41.

When is a building official allowed to enter a structure?

a)

When presenting a stop work order

b)

When authorized by the owner

c)

When reasonable cause for intentional code violation

d)

When a building has been deemed unsafe

42.

An elevator shall transfer to standby power within how much time?

a)

20 seconds

b)

Immediately

c)

120 seconds

d)

60 seconds

43.

Concrete foundation wall concrete cover reinforcement measured from the inside face of the wall shall not be less than how much?

a)

3/4 in

b)

1/2 in

c)

3/8 in

d)

1 in

44.

Class II standpipe hose connections shall be located where they have what kind of access?

a)

Confirmed Access

b)

Ready Access

c)

Approved Access

d)

Registered Access

45.

Flood loads documentation shall be prepared and sealed by who?

a)

Registered design professional

b)

Building department

c)

Building official

d)

City engineering department

46.

Hearths shall have a minimum thickness of what?

a)

2 in

b)

8 in

c)

12 in

d)

4 in