Font size
WorksheetsBaba hard
Total questions: 72
Worksheet time: 2hrs 48mins
Mɔwisjs
Jdjdpdjdk
Sjjddnx
What business does Adamas Belva Syah Devara have?
Pahami Citra Edukasi
Kelas Pintar
Ruangguru
Zenius Education
What business does James Prananto have?
Kopi Kenangan
Kopi Janji Jiwa
Kopi Yor
This is my sister's cat...........name is Baba.
he
she
it
its
What's ............name?
his
him
she
her
What are their names?
.............names are Duyen and Quyen.
Their
They
We
Our
WHO IS THE PERSON WHO FIGHTS WITH ME ALL THE TIME?
AMMA
CHAKKU
ANNA
BABA
True or False: Fairy tales has both good and bad characters.
True
False
WHO IS MY SISTER?
NEERAJ
SHEEPAD
ASHWINI
NAYANA
WHO IS MY FATHER?
ASHWINI
NEERAJ
SHREEPAD
ALL OF THE ABOVE
Select all the correct Primary Containment Design Parameters:
Design Pressure: 62 PSIG
Max Temp: 281F
Design Pressure: 56 PSIG
Leakage: .5%/day at 56 PSIG
Max Pressure: 62 PSIG
Select which valves are Interlocked to be closed with the Mode switch in Run?
AO-2379/AO-2380 (Rx Building to Torus Vacuum Breakers)
CV-2384/2385 (2" vent lines)
AO-2383 and AO-2386 (Torus and DW 18" Vent lines)
AO-2377 (18" Common Purge Line)
AO-2378, AO-2381 (18" Torus and DW Purge lines)
Choose all SBGT initiation signals
26 mrem in RB exhaust plenum
1.84# in the Drywell
Rx level +9
Rx level -47"
one downscale in RB Refuel floor
A Reactor startup is in progress with containment inerting occurring IAW Procedure
2138 (INERTING THE PRIMARY CONTAINMENT DURING REACTOR STARTUP).
While transferring nitrogen flow from the Drywell to the Suppression Chamber the following indications are noted:
What is the concern?
High N2 flow to the drywell may cause chugging at the downcomers.
A suppression pool bypass path exists which makes the suppression pool inoperable.
High N2 flow to the torus may cause excessive cycling of the torus to drywell vacuum breakers.
If a SBGT fan trip occurred, drywell pressure would exceed 1.84 psig prior to being able to secure N2 flow.
The plant is operating at rated conditions when a large steam leak occurs in the Steam
Jet Air Ejector room. If the SBGT system automatically initiates, what will happen to
radiation levels in the RB Exhaust Plenum Room, and why? Radiation levels will…
lower because the Turbine Building supply fans will trip
rise because the Plenum room exhaust fans take suction from the SJAE room
rise because SJAE room exhaust will be redirected to the RB Exhaust Plenum room
lower because the SBGT system will be processing the steam leak from the SJAE room
Which of the following IS allowed in the Spent fuel pool
Wetted Tape
An unlabeled laynard with someone continuously present
Non-metallic containers
Wetted rope < 14 days
The unloading of a core cell of all fuel was required to support an inspection during a refueling outage.
Which of the following describes the correct sequence of events to be performed for this refueling process?
Install the blade guide, install jumper on Probe Buffer Card to allow bridge movement over the core, remove all fuel assemblies, withdraw the control rod
Remove all fuel assemblies, install the blade guide, withdraw the control rod, install jumper on Probe Buffer Card to allow bridge movement over the core
Unload two diagonal fuel assemblies, insert a blade guide, remove the remaining fuel assemblies, withdraw the control rod, install jumper on Probe Buffer Card to allow bridge movement over the core
Unload two diagonal fuel assemblies, insert a blade guide, withdraw the control rod, remove the remaining fuel assemblies, install jumper on Probe Buffer Card to allow bridge movement over the core
Which Care family has products that are sulfate and paraben free?
Invigo Brilliance
Nutricurls
Oil Reflections
Elements
Koleston Perfect ME+ Intense Natural Cool Collection offers cool gray coverage, without going too
Dark
Light
Brassy
Green
To maintain healthy hair and operate at maximum efficiency, what temperature does every GHD tool use?
425
335
365
275
Fuel Bundles are being shuffled inside the Spent Fuel Pool. It has been reported to the control room that a fuel bundle has come in contact with the side of the pool. The following conditions now exist:
• Annunciator 4-A-1 (REFUELING FL AREA HI RADIATION) is in alarm
• RM-17-453A, Fuel Pool Monitor Channel A, indicates 30 mr/hr and rising
• RM-17-453B, Fuel Pool Monitor Channel B, indicates 25 mr/hr and rising
Which one of the following is the correct response to these conditions?
Verify SBGT automatically initiated to minimize the potential release outside the Reactor Building
Evacuate the Refuel Floor ONLY to reduce personnel exposure.
Evacuate the Reactor Building AND the Refuel Floor to reduce personnel exposure
Monitor local ARM readings and evacuate the refuel floor if indications approach 50 mr/hr
Refueling activities are in progress with the fuel pool gates open and there is notification of lowering fuel pool level.
Place bundle in nearest available location in spent fuel pool
Lower the bundle into the core
Halt all refuel operations
Inform nuclear engineers
The plant is operating at 100% power. Drywell pressure is 1.1 psig. The ‘B’ train of SBGT is in service in accordance with B.04.01-05.G.4, “Venting Primary Containment Through Standby Gas Treatment System” to reduce drywell pressure.
The following alarms are received.
5-B-28, “DRYWELL HI PRESSURE SCRAM TRIP”
8-B-18, “NO. 15 4160V BUS LOCKOUT”
The status of SBGT system is .
‘A’ train is running after automatic initiation and ‘B’ train has tripped
‘A’ train is not running and ‘B’ train has tripped and restarted on system low flow
'A’ train is running after automatic initiation and ‘B’ train is running in manual
‘A’ train is not running and ‘B’ train is running in manual
Power supplies to SBGT trains
A
B
MCC-132
MCC-142A
MCC-131
MCC-121
MCC-133
MCC-143
MCC-143
MCC0155
What effect will the failure of the ‘B’ RPS MG have on the SBGT system with the reactor at rated conditions?
SBGT train ‘A’ should start
SBGT train ‘B’ should start
Both SBGT trains should start
Neither SBGT trains should start
Correct response to a refueling Error with the grapple still latched to the grapple
Halt all refueling activities
Inform Nuclear engineer
Return Component to correct location
Return component to location
Halt refueling activities
Inform nuclear engineer
Evacuate refuel floor
Inform nuclear engineer
Lower into nearest available location
Inform nuclear engineer
When an in salon color client has a sensitive scalp, which product can be applied before color application?
Pre color treatment
Scalp protect
Express post color treatment
Sweet-n-low
Torus:
Operating Temperature band
Level EOP Entry Conditions
65F-110F
-3" and +4"
65F-90F
-3ft and +2"
65F-110F
-3" and +4"
65F-90F
-3" and +4"
Purpose of Rx Building to Torus Vacuum Breakers
Prevent Exceeding Internal Torus Pressure of 2 PSIG by opening at .5 PSID
PCIV Torus to RB and prevent exceeding 2 PSIG Torus external pressure
Open at .5 PSID to Prevent drawing a vacuum in the DW
Prevent exceeding .5 PSIG in the torus
The plant is at 100% power.
The Reactor Building Operator reports that he has observed a severe steam leak from the area of MO-2398, RWCU INLET OUTBOARD ISOL, via the surveillance camera video monitor. Actions taken to isolate the leak have been partially successful.
The Control Room Operator reports that area radiation monitor A-8, “962’ Outside RWCU,” and the Vent WRGM are approaching their alarm set points. Based on the above information, what action should be taken AND what will be the
result?
Push both TEST push buttons on Panels C-24A and C-24B to isolate secondary containment while maintaining normal Turbine Building ventilation.
Place hand switches HS-4887 on Panel C-24A and HS-4888 on Panel C-24B to BYPASS and Push both TEST push buttons on Panels C-24A and C-24B to isolate secondary containment with SBGT train A running.
Push both TEST push buttons on Panels C-24A and C-24B to isolate secondary containment with SBGT train A running.
Place hand switches HS-4887 on Panel C-24A and HS-4888 on Panel C-24B to BYPASS and Push both TEST push buttons on Panels C-24A and C-24B to isolate secondary containment while maintaining normal Turbine Building ventilation.
There are ______ balls
forty
fourth
four
fourt
My apartment is in the ________ floor.
four
fourth
fourteen
What was life like for the Bucket family?
Extremely Uncomfortable
Wonderful
Happy and Warm
Lonely
Who owns the chocolate factory?
Willy Wonka
Milton Hershey
John Cadbury
Domingo Ghiraredelli
Does Willy Wonka only make candy bars?
Yes
No
What does Charlie get every year for his birthday?
One chocolate bar
Some cabbage soup
A bag of candy
Two chocolate bars
What does Charlie do with his grandparents every night?
Watch Wheel of Fortune
Play board games
Tell stories
Go on a walk
When did Charlie get his only chocolate bar for the year?
His birthday
Christmas
Halloween
First day of school
What did Charlie want more than anything else?
A new family
Chocolate
A new bike
Money
Why was Charlie's life so hard?
He was unlucky
He had to work all the time
Nobody liked him
His family was poor
What is Frankenstein's first name?
Victor
Frank
Herman
Clerval
What was the setting like when Frankenstein finally finished his work?
A rainy, dark November night.
A dry, hot August morning.
A foggy, humid evening.
A stormy winter night.
1st, 10th, 56th are....
Cardinal numbers
Ordinal numbers
Where was Elizabeth living before she was adopted by the family?
Ingolstadt
Belrive
Naples
Milan
In chapter 5, how can Frankenstein's mood when Clerval finds him be described?
Hysterical.
Excited.
Frightened.
Jovial.
Why didn't Elie fast on Yom Kippur? (Page 69)
His Dad told him not to, and so he was obeying his father.
He was rebelling against God.
He was not hungry
The SS officers don't allow him to eat
What is name of the four rivers come together?
The Chao Phraya River
The Ping River
The Wang River
The Yom River
How many kilometers that you can see scenery of Nakhon Sawan around?
3
5
10
20
What region Nakhon Sawan serves as a gate to?
Southern
Western
Eastern
Northern
In January 1945, what part of Elie's body gets infected? (Pg. 78)
Mouth
Stomach
Thumb
Foot
What floor is there a replica of the Emerald Buddha?
2
3
4
5
What advice are the men given before the selection? (Pg. 71)
Run as fast as posslble
Try to sneak away
Bribe the SS officers
None of the options apply
What is the famous sacred golden pagoda in Wat Kiriwong?
Prapathom pagoda
Prajulamanee pagoda
Prathart pagoda
Praprang pagoda
What is the weather like at the end of Chapter 5? (Page 84)
Rainy
Snowy
Thundering
Sunny
Is the gate open everyday?
No, it isn't.
Yes, it is.
In the concentration camp hospital, Eliezer’s neighbor remarks he has lost faith in everything except what? (Pg. 81)
God
Death
Hitler
Elie
What floor that you will see the awesome scenery of Nakhon Sawan province?
2
3
4
1
How many floors are inside the temple?
4
5
6
7
What place is opposite to Wat Kiriwong?
The Satri Nakhon Sawan school
The Nakhon Sawan technical college
The Nakhon Sawan school
The Nakhon Sawan vocational college
When is the gate open?
7 a.m. to 6 p.m.
6 a.m. to 7 p.m.
5 a.m. to 6 p.m.
7 a.m. to 5 p.m.
