1.

If multiple trades are working on a piece of equipment which needs

to remain isolated until each trade is finished.

What would be the best lock out device?

a)

Don't lock out just

check with the other trades

b)

A single combination

lock out

c)

Single lock out with a single key

d)

Multi hasp lockout

2.

Regional electricity companies quote a maximum likely value of external loop impedance (outside the consumer's installation) for a TN-S system as:

a)

0.35 ohm

b)

0.8 ohm

c)

21 ohm

d)

200 ohm

3.

EAWR states that working live is acceptable unless:

a)

Suitable tools are used

b)

Suitable PPE is worn

c)

It is reasonable in all circumstances for it to be dead

d)

An engineer gives you permission

4.

Which of the following is the correct voltage for carrying out an insulation resistance test on a 400V three-phase circuit terminated at an isolator?

a)

250 V

b)

400 V

c)

500 V

d)

1000 V

5.

End-to-end resistance checks would be carried out on a:

a)

radial circuit

b)

lighting circuit

c)

ring final circuit

d)

fused connection unit

6.

The purpose of the test button of a residual current device is to check the

a)

Earth fault loop impedance

b)

Continuity of the earthing conductor

c)

Earth electrode resistance

d)

Mechanical operation of the rcd

7.

What is the IP rating for the top of an electrical enclosure

a)

IP4X

b)

IP2X

c)

IPXXB

d)

IP

8.

What is the process called for a new installation

a)

EICR

b)

EIC

c)

Initial Verification

d)

Periodic inspection and testing

9.

What does the initial verification prove?

a)

the installation is safe to stay into service

b)

the installation is safe to put into service

c)

the installation does not work

d)

the installation needs a minor works certificate

10.

What is the test voltage to be applied on an IR test for a low voltage circuit?

a)

250v AC

b)

500v DC

c)

250v DC

d)

500v AC

11.

what is the test instrument called for the continuity of a ring final circuit called?

a)

insulation resistance tester

b)

continuity tester

c)

Low resistance Ohm Meter

d)

MFT

12.

when performing the Live test of polarity what is the reason?

a)

to confirm the supply to the installation has correct polarity

b)

the confirm the insulation of the cable

c)

to confirm we have a cpc at every point

d)

to make sure we have an earth fault loop path

13.

what is the name of the tester used for an earth electrode resistance tester?

a)

low reading ohm meter

b)

earth electrode resistance tester

c)

MFT

d)

insulation resistance tester

14.

what percentage do we take of our maximum earth fault loop impedance values from BS7671

a)

100 %

b)

70%

c)

80%

d)

25%

15.

what certificate should be provided for an alteration to an existing circuit?

a)

electrical installation minor works certificate

b)

electrical installation certificate

c)

electrical installation condition report

d)

an invoice

16.

A reading of below 2 mega ohms requires what action?

a)

no action as it is acceptable

b)

full rewire

c)

further investigation

d)

change of accessories

17.

Put these tests in the correct order?

a)

Continuity of CPC, Insulation resistance, Polarity, Continuity of ring final circuit

b)

Insulation resistance, Polarity, Continuity of ring final circuit, Continuity of CPC

c)

Continuity of CPC, Continuity of ring final circuit, Insulation resistance, polarity,

d)

Polarity, Continuity of CPC, Continuity of ring final circuit Insulation resistance

18.

what tester is used for the earth fault loop impedance measurement?

a)

low reading ohm meter

b)

earth fault loop impedance tester

c)

earth electrode resistance tester

d)

approved voltage indicator

19.

What two tests make up your IPF measurement?

a)

Polarity and insulation resistance

b)

PEFC and PSCC

c)

Ze + (R1 + R2)

d)

PEFC and Zs

20.

Testing is to be carried out at the origin of a large, unoccupied building which has a standby generator. What must be done before tests are carried out?

a)

A. Check the operation of the standby supply.

b)

B. All main protective bonding must be disconnected.

c)

C. Temporary lighting must be installed for all escape routes.

d)

D. The standby supplies must be isolated to ensure safe testing.

21.

Which document is statutory?

a)

A. BS 7671.

b)

B. EAWR.

c)

C. GN3.

d)

D. GS38

22.

Which value would be obtained when a continuity of circuit protective conductors test, is measured at the furthest point on a radial circuit, using a temporary link between line and cpc at the distribution board?

a)

A. R1

b)

B. R2

c)

C. (R1 + R2).

d)

D. (R1 - R2).

23.

What would be indicated by the readings below, during a test of ring final circuit continuity? Line – Line loop reading = 0.1 Ω Neutral – Neutral loop reading = 0.1 Ω cpc – cpc loop reading = 0.167 Ω

a)

A. The cpc is a shorter length than the live conductors.

b)

B. The cpc is the same csa as the live conductors.

c)

C. The cpc is a larger csa than the live conductors.

d)

D. The cpc is a smaller csa than the live conductors.

24.

What would be the minimum acceptable value of insulation resistance for a 230 V lighting circuit?

a)

A. 0.5 MΩ.

b)

B. 1 MΩ.

c)

C. 2 MΩ.

d)

D. 4 MΩ.

25.

What should be confirmed during a test for polarity?

a)

A. Continuity of line conductors.

b)

B. Continuity of protective conductors.

c)

C. Outer metal contacts of ES lamps are connected to the line conductor.

d)

D. Single-pole switches and devices are connected in the line conductor only.

26.

The BS 7671 maximum tabulated earth fault loop impedance value for a protective device is 2.73 Ω. What is the maximum measured value of earth fault loop impedance permitted for a circuit protected by this device?

a)

A. 3.41 Ω.

b)

B. 2.73 Ω.

c)

C. 2.18 Ω.

d)

D. 2.04 Ω.

27.

What would be recorded as Ipf when PEFC and PSCC at the origin of a three-phase installation are tested using a single-phase instrument, and values of 0.9 kA and 1.5 kA were measured respectively?

a)

A. 0.9 kA.

b)

B. 1.5 kA.

c)

C. 2.4 kA.

d)

D. 3.0 kA

28.

Who should be provided with the original copies of test documentation upon completion of a rewire of a rented domestic property?

a)

A. The client.

b)

B. The tenant.

c)

C. The local authority.

d)

D. The insurance company.

29.

What are the options, when filling in the boxes on a Schedule of Inspection, for a new installation?

a)

A. ✓ : X : N/A : LIM.

b)

B. ✓ : X : N/A.

c)

C. ✓ : X : LIM.

d)

D. ✓ : N/A.

30.

What is a Tong tester and what does it measure

a)

Its to measure current in a cable otherwise known as a Clamp meter

b)

It measures earth loop Impedance it measures resistance

c)

It a taste test

d)

Its to measure IP ratings

31.

On an Electrical Installation Certificate what information would be in the

Nature of supply parameters section

a)

Maximum Demand

b)

Main Switch location

c)

Nominal voltage

d)

Extent and limitations

32.

Which Part of the Regulations would I find inspection and testing in

a)

Part 8

b)

Part 1

c)

Part 4

d)

Part 6

33.

What inspection is listed in the schedule of inspections on an EIC

a)

Maximum Insulation Resistance result

b)

Maximum ZS results

c)

Condition of consumers intake equipment

d)

Trip time of RCDs

34.

Which of the below options would I find on the schedule of inspections.

a)

Earth loop Impeadance values

b)

Isolation and Switching

c)

Maximum PFC values

d)

Functional test

35.

Whos signature is necessary for an electrical installation

a)

Lead accounts manager

b)

Architect

c)

Designer

d)

H&S manager