WorksheetsRCOA 101
Total questions: 11
Worksheet time: 2mins
What is the minimum average peak demand to qualify for contestability?
499 kW
500 kW
749 kW
1 MW
What is the legal basis of RCOA?
Renewable Energy Act
Department of Energy Act of 1992
Electric Power Industry Reform Act
None of the above
When did RCOA commence in the Philippines?
2001
2006
2012
2013
How long is the validity of a RES License?
5 years
10 years
1 year
3 years
A billing system whereby a Contestable Customer receives separate bills from its RES, WESM (if
applicable) and from its DU.
Single-Billing
Combined-Billing
Dual-Billing
Unbundled-Billing
All are Local RES, except:
MPower
MGen
VECO Res
Cogent Energy
The following events trigger Last Resort supply, except:
Increase of peak demand
RES License revoked by ERC
RES ceased to operate
Terminated DWSA between RES and DU
Electricity end-users who have a choice of a supplier of electricity are called
(a)
Does a contestable customer have a choice to remain with the regulated services of its distribution utility?
Yes
No
Who is the Secretary of Department of Energy?
Monalisa Dimalanta
Felix William Fuentebella
Raphael P. M. Lotilla
Mario C. Marasigan
BONUS: What is our CSO's middle name?
Legaspi
Lasam
Lacson
Ledesma