27105 Flooring Systems RQ's #1

Total questions: 20

Worksheet time: 10mins

Name
Class
Date
1.

Building codes specify​ that, with a live​ load, downward deflection at the center of a joist must not exceed​ _____.


a)

1/450th of the span

b)

1/240th of the span

c)

1/360th of the span

d)

1/125 of the span

2.

In balloon​ framing, the second floor joists sit on a​ _____.


a)

Sill attached to the top of the wall assembly below


b)


1×4 or 1×6

ribbon let in to the wall studs

c)

2×4 ledger nailed to the stud

d)

Plate nailed to the top plate of the wall assembly below


3.

For the same​ structure, how many 4'x8' panels of subflooring material are​ needed?



a)

96

b)

35

c)

48

d)

72

4.

The method of construction that experiences a relatively large amount of settling as a result of shrinkage is​ _____.


a)

Platform framing


b)

Balloon framing


c)

Brace framing


d)

​Post-and-beam framing


5.

What would not be included in a typical sense of​ prints?


a)

MEP drawings


b)

TSOL drawings


c)

Architectural drawings


d)

Structural drawings


6.

For a given total​ load, if the span between its support columns is​ increased, the size of the girder​ _____.


a)

Must be decreased



b)

can remain the same

c)

Can be decreased


d)

Must be increased


7.

Use special nails when fastening treated​ lumber, because treatment chemicals can cause ordinary fasteners to​ _____.


a)

Become brittle


b)

Stain the wood


c)

Shrin

d)

Corrode

8.

On which construction drawing would you find the location and dimensions of grade​ beams?



a)

Site plan


b)

Floor plan


c)

​Mechanical, electrical, and plumbing plans


d)

Foundation plan


9.

When laying out the sill for joist locations 16"OC, the first measurement on the sill should be at​ _____



a)

16"

b)

14 1/4 "

c)

15 3/8"

d)

15 1/4"

10.

The drawings used in the construction of a building are legally the property of​ _____.


a)

Various subcontractors


b)

The general contractor


c)

The city or other local government body


d)

The architect or building owner


11.

A combined​ subfloor-underlayment system used where direct application of carpet or tile is intended is referred to as​ a(n) _____.


a)

Raised floor system


b)

Access floor system


c)

​Two-layer floor system


d)

​Single-layer floor system


12.

Letter C is pointing to the​ _____.


a)

Trimmer joist


b)

Common joist


c)

Joist header


d)

Tail joist


13.

In a set of construction​ drawings, the details about the floor used in a building most likely will be defined in the​ _____.


a)

Structural drawings


b)

Architectural drawings


c)

Site plans


d)

Mechanical plans


14.

In areas where termites are a​ problem, a metal shield should be installed​ _____.


a)

Under the bottom wall plate


b)

Below the sill plate


c)

On top of the footing


d)

Between the sill plate and rim joist


15.

Which of the following panels creates the least rigid​ subflloor?

a)

1 x 6 boards

b)

​Tongue-and-groove plywood


c)

Plywood


d)

Oriented strand board​ (OSB)


16.

Concrete joist systems allow thinner floor slabs with high bearing capacities to be created.


a)

true

b)

false

17.

The construction method that features widely​ spaced, heavy framing members is​ _____.


a)

Brace framing


b)

Platform framing


c)

Balloon framing


d)

​Post-and-beam framing


18.

Floor trusses consist of two primary components—chords and​ _____.

a)

Spacers


b)

Flanges


c)

Stiffeners

d)

Webs

19.

Letter G is pointing to the​ _____.


a)

Trimmer joist


b)

Common joist


c)

Joist header


d)

Tail joist


20.

An item that requires special​ framing, such as HVAC​ ductwork, is shown on​ _____.


a)

The​ mechanical, electrical, and plumbing plans


b)

The floor plan


c)

The foundation plan


d)

The​ architect's rendering