wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

DCD3533 PROJECT MANAGEMENT

Total questions: 20

Worksheet time: 13mins

Name
Class
Date
1.

What is project management?

a)

The application of knowledge, skills, tools and technique

b)

A budget for project

c)

A temporary endeavour undertaken to create a unique product

d)

Constraint that might occur in the project

2.

Why do companies use project management?

a)

To handle projects effectively

b)

To plan and scheduling in unrealistic way

c)

To complete the project over the allocated time

d)

To allow scope creep during the project development

3.

Triple Constraint consist of cost, time and (a)  

4.

Project success can be determined by __________.

a)

customer requirement satisfied

b)

complete over the allocated budget

c)

scope creep

d)

lack of resource

5.

Which activity is involve in development stage?

a)

Writing the screenplay

b)

Casting

c)

Location scouting

d)

Test screening

6.

Which crew is responsible for building and rigging, dolly tracks and other lighting accessories?

(a)  

7.

The __________ is hired by the executive producer to ensure the movie is made correctly and everything goes smoothly.

a)

screenwriter

b)

producer

c)

director

8.

__________ refers to the position of high importance and those on top of the hierarchy who have a lot of authority on a film set.

a)

Above The Line Crew

b)

Below The Line Crew

c)

Main Importance Crew

d)

Upper The Line Crew

9.

What is the type of paying crew members if it is customary to pay two time hourly rate for any working time over 12 hours?

(a)  

10.

What is the purpose of visual referencing?

a)

To make research on the character

b)

To identify specific audience

c)

To identify the technique of style to produce a film

d)

To determine the mood of the film

11.

What is the story structure for a story that is not real, made up characters, made up situation and imagination?

(a)  

12.

This plot structure is the high point of the story, where a culmination of events create the peak of the conflict.

a)

Exposition

b)

Conflict

c)

Rising Action

d)

Climax

13.

Plot structure consist of exposition, (a)   , rising action, climax, falling action, resolution.

14.

Which is not the type of conflict?

a)

Internal conflict

b)

External conflict

c)

Extra conflict

d)

Multiple conflict

15.

Man vs (a)   occurs when the protagonist is placed at odds with a government, cultural tradition or surrounding people.

16.

What is copyright?

a)

Legal term used to describe the rights that creator have over their literary and artistic works.

b)

Exclusive right granted for an invention that is a new way of doing something and offers new technical solution to a problem.

c)

Distinctive sign that identifies certain goods or services produced or provided by an individual or a company.

d)

Rights on confidential information which may be sold or licensed.

17.

Which is not the factor to determine the number of shooting days?

a)

Budget

b)

Actor availability

c)

Location availability

d)

Actor popularity

18.

A budget is typically divided into four sections. Which is one of the section in budget component?

a)

Above the line cost

b)

Upper line cost

c)

Importance line cost

d)

Main line cost

19.

Which intellectual property covered the literary works such as books, music, paintings. sculpture and films?

a)

Copyright

b)

Patent

c)

Trademark

d)

Trade Secret

20.

What is mean by the 3-30 Rule?

a)

Crew members is 3 to 30 members

b)

Duration of short film is 3 to 30 minutes

c)

Number of actors is limited to 30 person

d)

The location of shooting must be in radius of 30km