wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

EL1 - Wk02 - Basic Circuit Configurations

Total questions: 26

Worksheet time: 39mins

Name
Class
Date
1.
Question Image

Match connections for

Ground Control - Simple Circuit

a)

B+ to

1.

Fuse input

b)

Fuse output to

2.

Load input

c)

Load output to

3.

Switch input

d)

Switch output to

4.

B-

2.
Question Image

Match connections for

Ground Control - Simple Circuit

a)

B+ to

1.

Fuse input

b)

Fuse output to

2.

Load input

c)

Load output to

3.

Switch input

d)

Switch output to

4.

B-

3.
Question Image

Match connections for a

Power Control - Simple Circuit

a)

B+ to

1.

Fuse

b)

Fuse to

2.

Switch

c)

Switch to

3.

Load

d)

Load to

4.

B-

4.

Match connections for

Ground Control - Simple Circuit

a)

B+ to

1.

Fuse

b)

Fuse to

2.

Load

c)

Load to

3.

Switch

d)

Switch to

4.

B-

5.

Match connections for a

Power Control - Simple Circuit

a)

B+ to

1.

Fuse input

b)

Fuse output to

2.

Switch input

c)

Switch input to

3.

Load input

d)

Load output to

4.

B-

6.
Question Image

Match connections for

Ground Control - Series Circuit

a)

B+ to

1.

Fuse input

b)

Fuse output to

2.

R1 input

c)

R1 output to

3.

R2 input

d)

R2 output to

4.

Switch input

e)

Switch output to

5.

B-

7.

Match connections for

Ground Control - Series Circuit

a)

B+ to

1.

Fuse input

b)

Fuse output to

2.

R1 input

c)

R1 output to

3.

R2 input

d)

R2 output to

4.

Switch input

e)

Switch output to

5.

B-

8.
Question Image

Match connections for a

Power Control - Series Circuit

a)

B+ to

1.

Fuse input

b)

Fuse output to

2.

Switch input

c)

Switch output to

3.

R1 input

d)

R1 output to

4.

R2 input

e)

R2 output to

5.

B-

9.

Match connections for a

Power Control - Series Circuit

a)

B+ to

1.

Fuse input

b)

Fuse output to

2.

Switch input

c)

Switch output to

3.

R1 input

d)

R1 output to

4.

R2 input

e)

R2 output to

5.

B-

10.

Match the following

Grd con parallel

a)

B+ to

1.

Fuse input

b)

Fuse output to

2.

R1 and R2 inputs

c)

R1 and R2 outputs to

3.

Switch input

d)

Switch output to

4.

B-

11.

Match the following

Pow con parallel

a)

B+ to

1.

Fuse input

b)

Fuse output to

2.

Switch input

c)

Switch output to

3.

R1 and R2 input

d)

R1 and R2 outputs to

4.

B-

12.

Match the following

Pow con series - parallel

a)

B+ to

1.

Fuse input

b)

Fuse output to

2.

Switch input

c)

Switch output to

3.

R1 input

d)

R1 outputs to

4.

R2 and R3 input

e)

R2 and R3 output to

5.

B-

13.

Match the following

Pow con series parallel

a)

B+ to

1.

Fuse input

b)

Fuse output to

2.

Switch input

c)

Switch output to

3.

R1 and R2 input

d)

R1 and R2 output to

4.

R3 input

e)

R3 output to

5.

B-

14.

Match the following

Ground control series-parallel

a)

B+ to

1.

Fuse input

b)

Fuse output to

2.

R1 and R2 input

c)

R1 and R2 output to

3.

R3 input

d)

R3 output to

4.

Switch input

e)

Switch output to

5.

B-

15.

Match the following

Ground con series parallel

a)

B+ to

1.

Fuse input

b)

Fuse output to

2.

R1 input

c)

R1 output to

3.

R2 and R3 input

d)

R2 and R3 output to

4.

Switch input

e)

Switch output to

5.

B-

16.

(+) Control

a)

(+) to

1.

Switch

b)

Switch to

2.

Load

c)

Load to

3.

(-)

17.

(+) Control

a)

(-) to

1.

Load

b)

Switch to

2.

(+)

c)

Load to

3.

Switch

18.

(+) Control Series

a)

(+) to

1.

Switch

b)

Switch to

2.

Load 1

c)

Load 1 to

3.

Load 2

d)

Load 2 to

4.

(-)

19.

(+) Control Series

a)

(-) to

1.

Load 2

b)

Switch to

2.

(+)

c)

Load 1 to

3.

Switch

d)

Load 2 to

4.

Load 1

20.

Reorder for Power Control Simple Circuit

a)

B+

b)

Fuse

c)

Switch

d)

Load

e)

B-

1)
2)
3)
4)
5)
21.

Reorder for Ground Control Simple Circuit

a)

B+

b)

Fuse

c)

Load

d)

Switch

e)

B-

1)
2)
3)
4)
5)
22.

Reorder for Ground Control Series Circuit

a)

B+

b)

R1

c)

R2

d)

Switch

e)

B-

1)
2)
3)
4)
5)
23.

Reorder for Power Control Series Circuit

a)

B+

b)

Switch

c)

R1

d)

R2

e)

B-

1)
2)
3)
4)
5)
24.

Match for Power Control Parallel Circuit.

a)

B+ to

1.

Switch

b)

Switch to

2.

R1 and R2

c)

R1 and R2 to

3.

B-

25.

For a (+) control circuit, connect the battery (+) to the ​ (a)   , which connects to the ​ (b)   , which connects to the ​ (c)   , which connects to the ​ (d)  

Choose from the below words
Fuse
Switch
Load
Bat(-)
26.

For a (-) control circuit, connect the battery (+) to the ​ (a)   , which connects to the ​ ​ (b)   , which connects to the ​ ​ (c)   , which connects to the ​ (d)  

Choose from the below words
Fuse
Load
Bat(-)
Switch