Standards of Professional Practice

Total questions: 10

Worksheet time: 8mins

Name
Class
Date
1.

it is the most common method of compensation which is also fair to both the Client and Architect

a)

Percentage based on Project Cost

b)

Professional Fee plus Expenses

c)

Lump Sum

d)

MDPE

2.

Your Client are ask you to determine the viability of a proposed development by providing a detailed analysis of the project. What are you providing?

a)

Consultation

b)

Feasibility Studies

c)

Site Utilization and Land-Use Studies

d)

Value Management

3.

Which is Not part of Pre-Design Services (SPP Doc 201)?

a)

Site Selection and Analysis

b)

Site Utilization and Land-use studies

c)

Urban Planning

d)

Space Management Studies

4.

A Clients hires an Architect to prepare the Plans and corresponding Documents for his project. However, after the completion of all Plans and Documents, the Client changes his mind and decided not to implement the Plans for construction. How much is the Architect compensated?

a)

85%

b)

60%

c)

75%

d)

90%

5.

The ________ can order changes in the construction any time.

a)

Architect

b)

Construction Manager

c)

Project Manager

d)

Owner

6.

The First phase for Architect's Regular Design Services

a)

Project Definition Phase

b)

Schematic Design Phase

c)

Design Development Phase

d)

Contract Document Phase

7.

A registered and licensed Architect who is directly and professionally responsible for the total design of the project for the client and assumes the civil liability for the plans, specifications and contract documents he/she has signed and sealed

a)

Principal Architect

b)

Managing Architect

c)

Architect-Of-Record

d)

Project Architect

8.

You just submitted to the client the complete set of plans and specifications. Upon his acceptance, what is the next step?

a)

Bidding/Selection of Contractor

b)

Negotiate amount of your Fee

c)

Present Scope of Works

d)

Construction

9.

Who is responsible for shortening the time and lessening the cost of the project

a)

Architect

b)

Project Manager

c)

Contractor

d)

Client

10.

What is covered by Comprehensive Architectural Services?

a)

SPP Doc. 201-205

b)

SPP Doc. 202-206

c)

SPP Doc. 202-207

d)

SPP Doc. 203-208