1.

Traffic Management Officer (TMO) appointed by?

a)

Contractor

b)

Superintending Offier

c)

Consultant

d)

Project Director

2.

ATJ NUMBER FOR MANUAL ON TRAFFIC CONTROL DEVICES TEMPORARY SIGNS AND WORK ZONES CONTROL?

a)

2A / 85

b)

2B / 85

c)

2C / 85

d)

2D / 85

3.

Temporary road markings shall be ______ in colour.

a)

ORANGE

b)

YELLOW

c)

WHITE

d)

BLACK

4.

Advance Warning Sign?

a)

b)

c)

d)

5.

SIGNS TYPICAL INSTALLATION

HEIGHT FOR ROADSIDE SIGN FOR URBAN DISTRICT?

a)

2.2metre

b)

1.5metre

c)

1.2metre

d)

2.0metre

6.

The _____shall be used for temporary work zone of more than 30 days construction period. It is also recommended to be used in road with high traffic density.

a)

paint

b)

thermoplastic material

7.

Please choose Apologetic Sign? (multiple answers)

a)

b)

c)

8.

Temporary Management Equipment ? (multiple answers)

a)

b)

c)

9.

The ______ is a document to be prepared by the contractor prior to construction works. In this document, the Contractor will spell out his approach to the management of the site during the construction period.

a)

Traffic Control Plans (TCPs)

b)

Traffic Management Plan (TMP)

10.

The _____ are drawings showing the use of the Traffic Control Devices (TCDs) in the layout of the Work Zones.

a)

Traffic Management Plan (TMP)

b)

Traffic Control Plans (TCPs)