1.

Samuel is developing a document that will outline the methods used to create and manage requirements, as well as the methods used to prioritize requirements. Samuel is preparing the:

a)

requirements documentation

b)

requirements management plan

c)

requirements traceability matrix

d)

work breakdown structure

2.

Sebastian is working on a project to make a new sports backpack. He is working with his stakeholders to decide on the color combination for the backpack. Sebastian decides that they will vote, and everyone has to agree on the color combination. What method of group decision making is he using?

a)

unanimity

b)

majority

c)

plurality

d)

dictatorship

3.

Carl is working on a new phone design for a technology company. He is

currently working on a way to analyze, document, and manage all the

stakeholder requirements for the new design. Kacie is working on the:

a)

requirements management plan.

b)

requirements documentation.

c)

requirements traceability matrix.

d)

work breakdown structure.

4.

Cathy is managing a project and is considering relocating
her team closer to the project worksite. She asks the
stakeholders to vote on this decision and will make the move only if
they all agree to it. Cathy is using which tool /technique to collect
requirements?

a)

dictatorship

b)

plurality

c)

unanimity

d)

majority

5.

Charley is a event planner and is considering locations for a corporate party. She has decided to ask the all of the stakeholders to vote on two locations, so that whichever location receives over 50% of the group's
support will win. Charley is using which technique to collect requirements?

a)

unanimity

b)

dictatorship

c)

plurality

d)

majority

6.

Perry is in charge of planning a charity event for the animal shelter. He wants
to review the requirements of each of the stakeholders. Perry should be
reviewing which document?

a)

requirements management plan

b)

requirements documentation

c)

requirements traceability matrix

d)

work breakdown structure

7.

Adam is leading a rental project. He meets with the stakeholders
to define and document all the needs for the rental project. The
activity that Adam is participating in is referred to as:

a)

verifying scope

b)

creating the WBS

c)

controlling the scope

d)

collecting requirements

8.

Angela is meeting with town officials to determine the needs for a

transportation project that she is developing. The activity that Angela is

participating in is referred to as:

a)

creating the WBS

b)

collecting requirements

c)

controlling the scope

d)

verifying the scope

9.

Gerry is working on a construction project. Before finalizing

the product requirements, he would like to show a miniature model to the

stakeholders to gather feedback. The technique that

Peter should use to test the model would be a/an:

a)

prototype

b)

facilitated workshop

c)

observation

d)

survey

10.

The project manager is using group decision-making techniques in

establishing requirements for the food refrigeration project. Which are

the techniques they could use?

a)

autocracy, majority, plurality, and unanimity

b)

dictatorship, majority, and plurality

c)

majority, plurality, and unanimity

d)

dictatorship, majority, plurality, and unanimity

11.

John is working on a project to develop a new software application. He is currently documenting the needs and expectations of the stakeholders. John is involved in:

a)

creating the WBS

b)

collecting requirements

c)

controlling the scope

d)

verifying the scope

12.

Emily is managing a project to build a new hospital. She is preparing a document that will outline the methods used to create and manage requirements. Emily is preparing the:

a)

requirements documentation

b)

requirements management plan

c)

requirements traceability matrix

d)

work breakdown structure

13.

David is leading a project to design a new car model. He wants to test a working model with potential customers to gather feedback. The technique that David should use would be a/an:

a)

prototype

b)

facilitated workshop

c)

observation

d)

survey