Module 4 (PART 2) Energy Isolation Certificate Quiz

Total questions: 9

Worksheet time: 5mins

Name
Class
Date
1.

What is the purpose of the Energy Isolation Certificate (IC)?

a)

Record work completion

b)

Ensure safe work practices and communication

c)

Update plant integrity

2.

Who is responsible for completing the Application Section of the Energy Isolation Certificate (IC)?

a)

Area Authority (AA)

b)

Isolating Operator (ISO)

c)

Asset Owner

3.

When is a Sanction To Test (STT) required?

a)

At the end of the work shift

b)

During pre-start ups

c)

After permit expiration

4.

What does the Isolation Authority (ISA) confirm in the Mechanical Isolation Details?

a)

Work scope details

b)

De-isolation sequence

c)

Integrity of isolations

5.

Who approves the de-isolation of equipment in the Electrical Energy Isolation Certificate?

a)

Isolating Operator (ISO)

b)

Area Authority (AA)

c)

Permit Issuer (PI)

6.

When should the Isolating Operator (ISO) sign off on the Isolation Certificate (IC) during the de-isolation process?

a)

Before the independent verification

b)

After the closure by Area Authority (AA)

c)

Before the approval by AA

7.

Who determines whether an independent verification is required for isolation points?

a)

Isolating Operator (ISO)

b)

Area Authority (AA)

c)

Permit Issuer (PI)

8.

What is the purpose of the Dynamic Risk Assessment process?

a)

Confirm isolations

b)

Monitor hazards and assess risks

c)

Update the Isolation Certificate

9.

What is the minimum acceptable standard of final isolation for intrusive and non-intrusive maintenance?

a)

Maximum Isolation Standard

b)

Baseline Isolation Standard

c)

Advanced Isolation Standard