What site is used to order parts?
WIINGs
UE
HOBITS
WIPIT
What is SPC used for?
Placing lot on hold
Verify process logs
See monitor data
Change tool state
In SPC, what does a Green Triangle mean?
Data point has ran
Data point has passed
Data point has failed
Data point still needs to run
In SPC, what do the dashed lines mean?
Upper control and Lower control limit
Times when monitors ran
Time the tool processed lots
lots that ran on tool
What is Set Automon Attribute used for?
Process production lots
Run monitors
Change tool state
Log tool to Level 8
What form is created in response to either a potential quality issue or actual quality issue?
QEF
SIF
Instruction
PTP
What website to we use to document Safety issues?
ILM
Factory Communication
Ops View
Safety Good Catch
What website would we use to request assistance fixing a building issue?
Issue Lifestyle Management
Lot Dispatch
Building Assistance Center
Email Manager
In Lot Dispatch's first column, what indicates the lot is in a tool queue?
O
S
QF3
A
What is a lot queue time?
Time for lot to leave the fab
Lunch time
Time lot need to process on tool
Time to go home
How do we identify a Test Wafer lot by its Lot Number?
A letter in the last position
M in the first position
P in the fourth position
T in the fifth position
What site is used to assign a Hot Lot priority to a lot?
HOBITS
Lot Dispatch
Lot Detail
SPC
What website do we use to track monitor status and see if they are running on a tool?
Automon Dashboard
WIPIT
Lot Detail
Ops View
In Lot Dispatch, what would a lot highlighted in Purple mean?
Lot is close to queue time
Lot has missed queue time
Lot is on Hold
Lot is In Process