wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Sanitation Systems QuizL3P2U9,1.10

Total questions: 9

Worksheet time: 5mins

Name
Class
Date
1.

What are the three methods of below ground drainage that can be used to discharge water from sanitary appliances?

a)

The separate system, The combined system, The integrated system

b)

The separate system, The partially separate system, The integrated system

c)

The separate system, The partially separate system, The combined system

d)

The combined system, The partially combined system, The integrated system

2.

What is the main problem with the separate system of below ground drainage?

a)

Possibility of contaminating a water course with raw sewage if the wrong connections to the system are made.

b)

System planning can be troublesome.

c)

Foul water drains are not flushed through during heavy rainfall.

d)

It is extremely expensive to install.

3.

What is another name for the partially separate system?

a)

The separate system

b)

The integrated system

c)

The partially combined system

d)

The combined system

4.

What is one of the main problems with the combined system of below ground drainage?

a)

Foul water drains are not flushed through during heavy rainfall.

b)

System planning can be troublesome.

c)

It is extremely expensive to install.

d)

During periods of heavy rain, the drainage system can become flooded.

5.

What is the purpose of a soakaway drain?

a)

To disperse rainwater run off from roof areas

b)

To discharge waste water from sanitary appliances

c)

To treat waste water before discharging it into the drainage system

d)

To store rainwater for later use

6.

What is the design ratio for small soakaways serving 25m2 or less of roof area?

a)

15mm rainfall in 20 minutes

b)

10mm rainfall in 5 minutes

c)

20mm rainfall in 15 minutes

d)

5mm rainfall in 10 minutes

7.

Where should soakaways not be sited?

a)

Within 2.5 m of a building

b)

Where the water table is high

c)

Near a drainage field

d)

All of the above

8.

What should be referenced for soakaways greater than 25m2?

a)

BS EN 752 part 4

b)

Water Regulations

c)

Building Regulations

d)

Approved Document H

9.

What is the main problem with the partially separate system of below ground drainage?

a)

Possibility of contaminating a water course with raw sewage if the wrong connections to the system are made.

b)

Foul water drains are not flushed through during heavy rainfall.

c)

System planning can be troublesome.

d)

It is extremely expensive to install.