PROF PRAC 2

Total questions: 68

Worksheet time: 34mins

Name
Class
Date
1.

Responsibilities of Construction Manager does not include the functions of CSG or Construction Supervision Group.

a)

TRUE

b)

FALSE

2.

Architect-of-Record is directly and professionally responsible and liable for the construction supervision of the project

a)

TRUE

b)

FALSE

3.

He is directly responsible to the Owner on all aspects of the construction work: programming, coordination, quality and cost control and time management.

a)

Engineer-of-Record

b)

Architect-of-Record

c)

Construction Supervision Group

d)

Construction Manager

4.

What is the Recommended Professional Fee for Full-Time Supervision based on percentage of PCC?

a)

1% - 1.5%

b)

1.5% - 3%

c)

1.5% - 2.5%

d)

1%-2.5%

5.

The following are scope for Full-Time Supervision, except:

a)

Cost and Time Control

b)

Quality Control

c)

Evaluation of Construction Work

d)

Preparation of Daily Inspection Reports

6.

On this phase of the scope of architect's regular design service, the architect prepares documents consisting of plans, elevations, sections and other drawings, outline of specifications, diagrammatic layout of construction systems, and updated SPCC

a)

Contract Document

b)

None of the Above

c)

Schematic Design

d)

Design Development

7.

This abbreviation on the Architect's Guideline means the Architect and the engineering and allied professionals executes separate contracts with the Owner.

a)

DADES

b)

None of the above

c)

DAEDS

d)

DADS

8.

Included in the services of Post-Design Services is the preparation of the FALAR which stands for_______.

a)

Fire Alarm and Life Assessment Repor

b)

Fire Safety and Life Assessment Report

c)

None of the these

d)

Fire Safety and Life Assessment Risk

9.

Upon signing of the service agreement __% of the agreed Professional Fee shall be paid by the Owner as engagement fee or as the acceptance fee of the Architect that shall cover the mobilization component of the services.

a)

5

b)

15

c)

10

d)

None of the these

10.

On a regular design service of an architect, the architect is required to do 8-hour on-site supervision to check on the quality of the work involved and shall be held responsible for the Contractor's failure to carry out the Construction work in accordance with the Contract Documents.

a)

TRUE

b)

FALSE

11.

Basic compensation for the following Specialized Architectural Services, which is classified as additional or extra services, shall be through man-months.

a)

Site Development Planning

b)

Architectural Lighting Layout and Design

c)

Historic and Cultural Heritage Conservation and Planning

d)

None of the these

12.

This plan puts a premium on the physical planning and engineering components of the development plan, which are the direct or sequential physical translation of the inputs from the initial stages of the CDP effort.

a)

Site Development Plan

b)

Urban Design

c)

Environmental Impact Assessment

d)

Master Development Plan

13.

How many representative of the owner should be included on the jury?

a)

two

b)

none

c)

one

d)

three

14.

The Consulting Architect in this area of practice must have much more than the basic knowledge of Building Materials and Finishes, Construction Methodologies, Building Envelopes including cladding and roofing systems, Architectural Fenestrations and Architectural Hardware, Fixtures and Fittings.

a)

Post-Design Services

b)

Building Components

c)

Building Systems Design

d)

Facilities Maintenance Support

15.

On this phase of the scope of architect's regular design service, the architect assists the Owner from the early stage of establishing a list of prospective Contractors to awarding of the construction contract.

a)

Negotiation or Bidding

b)

Contract Document

c)

Pre-Construction

d)

Construction

16.

As an architect, you are asked to provide fee proposal of a Public Market with a total floor area of 1,250 sq.m. During that time the average construction cost per sq.m. for that classification is 15,000/sq.m. How much is the recommended professional fee for Detailed Architectural and Engineering Services?

18750000

a)

P925, 000

b)

P562, 500

c)

P2, 500, 000

d)

P937, 500

17.

What is the Recommended Professional Fee for specialized architectural service - Physical Planning?

a)

None of the these

b)

10%-15% of the cost of work

c)

P50, 000 per hectare in first 4 has.

d)

P50, 000 per hectare in first 5 has.

18.

There is no subsequent additional payment for changes ordered by the Owner after approval of the Architect’s outputs.

a)

TRUE

b)

FALSE

19.

The 10% professional fee for construction phase is broken down as follows:

a)

None of the these

b)

7% Architect's Liability and 3% Periodic Construction Supervision

c)

5% Design Service and 5% Construction Supervision

d)

5% Architect's Liability and 5% Periodic Construction Supervision

20.

All taxes including VAT except income tax that the government may impose on the Architect as a result of the services rendered by the Architect on the project shall be paid by the client/owner.

a)

TRUE

b)

FALSE

21.

KPO in SPP documents stands for ____.

a)

None of the these

b)

Business Process Outsourcing

c)

Knowledge Process Outsourcing

d)

Key Processing Output

22.

They are the specialist personnel who may be consulted by the Jurors during the conduct of the ADC to permit them to obtain all necessary relevant information.

a)

Competition Secretariat

b)

Jury

c)

Professional Advisor

d)

Technical Advisor

23.

On this phase of the scope of architect's regular design service, the architect submits to the Owner seven (7) sets of all construction drawings and technical specifications for purposes of obtaining a building permit.

a)

Negotiation or Bidding

b)

Design Development

c)

Construction

d)

Contract Document

24.

This abbreviation on the Architect's Guideline means there is a single contract between the Architect and Owner, and sub-consultancy contracts between the Architect and the other professionals working with the Architect.

a)

DAEDS

b)

None of the above

c)

DADS

d)

DADES

25.

The Architect in this area of practice recommends the systematic process of ensuring that a building / structure’s array of systems is planned, designed, installed and tested to perform according to the design intent and the building’s operational needs.

a)

Building Testing and Commissioning

b)

Facilities and Maintenance Support

c)

None of the these

d)

Building Components

26.

What is the Recommended Professional Fee for specialized architectural service - Site Development Plan?

a)

10%-15% of the cost of work

b)

15-20% of the cost of work

c)

5%-10% of the cost of work

d)

None of the these

27.

A partnership or corporation should register to ___ to enable it to legally engage in business, issue receipts, trade financial assets, and be entitled to certain rights under the country's corporate and investment laws.

a)

Department of Labor and Employment

b)

Department of Trade and Industry

c)

Securities and Exchange Commission

d)

None of the Above

28.

The jury in an architectural design competition shall not exceed ____ members.

a)

5

b)

6

c)

9

d)

7

29.

On a regular design service of an architect, the architect reviews and refines the owner’s space requirements and translates them into an architectural program.

a)

Project Definition

b)

Design Development

c)

Schematic Design

d)

Proposal-Making

30.

If the work of the Architect is abandoned or suspended in whole or in part, the Owner shall pay the Architect for the services rendered corresponding to the amount due at the stage of suspension or abandonment of the work.

a)

TRUE

b)

FALSE

31.

The landscaping layout of small building projects could not be done by the Architect as part of the site development planning (SDP) effort.

a)

TRUE

b)

FALSE

32.

A sole proprietorship should register to ___ to secure business name.

a)

Department of Labor and Employment

b)

Securities and Exchange Commission

c)

Department of Trade and Industry

d)

Bureau of Internal Revenue

33.

During construction, the architect does not make decisions on any claims of the Owner and Contractors relating to the execution and progress of work or the interpretation of the Contract Documents.

a)

TURE

b)

FALSE

34.

The following are building sites where an Architect can be commissioned for physical planning:

a)

Industrial Estate

b)

Sports Complexes

c)

Residential and Housing Subdivisions

d)

All of these

35.

On this phase of the scope of architect's regular design service, the architect gathers relevant information and data leading to the definition of the requirements of the project, including the scope of the Architect’s services

a)

Project Definition

b)

Initiation

c)

Design Development

d)

Schematic Design

36.

Which SPP Document refers to Architectural Design Competition?

 

a)

SPP Doc. 208

b)

SPP Doc. 207

c)

SPP Doc. 204

d)

SPP Doc. 203

37.

Foreign architects can never practice regular design services in Philippine soil at all circumstances.

a)

TRUE

b)

FALSE

38.

Which SPP Document explains how in regular practice the architect translates the Owner's needs and requirements to spaces and forms in the best manner of professional service?

a)

SPP Doc. 201

b)

SPP Doc. 208

c)

SPP Doc. 203

d)

SPP Doc. 202

39.

On this phase of the scope of architect's regular design service, the architect prepares the initial line drawings representing design studies leading to a recommended solution, including a general description of the project for approval by the Owner.

a)

Project Definition

b)

None of the above

c)

Schematic Design

d)

Design Development

40.

A registered and licensed architect who is directly and professionally responsible and liable for the construction supervision of the project.

a)

Consulting Architect

b)

Architect in-charge of Construction

c)

None of the above

d)

Architect of Record

41.

It is now known as RA 9266, it is enacted by Congress on March 17, 2004 to provide more comprehensive regulation of the registration, licensing, and practice of architecture repealing this and other laws inconsistent with its stipulations.

a)

"The Architecture Act"

b)

"The Architecture Act of 2004"

c)

"The Architecture Law of 2004""The Architecture Law"

d)

"The Architecture Law"

42.

The year the United Architects of the Philippines (UAP) was formed out of the union of the PIA, LPA and APGA

a)

1975

b)

1950

c)

1974

d)

1979

43.

A developer commissioned a foreign architectural firm to conceptualized the design their headquarters. When the concept design was finalized , they developer hired a local architectural firm to do the design development and construction documents. Which of the following is the function of the local architectural firm?

a)

Architect-in-charge of construction

b)

Consulting Architect

c)

Architect-of-Record

d)

Interior Architect

44.

Which  among the list is a weaknesses of RLAs and their practice?

a)

Limited Numbers of RLAs and Architectural firms

b)

RA 9266 and IRR

c)

Stakeholders all willing to cooperate with the PRBOA and with each other

d)

Visible lack of Government support

45.

The following are the qualifications in taking the Architecture Licensure Exam except ___.

a)

Filipino citizen

b)

None of these

c)

Not been convicted of any criminal offensive involving moral turpitude.

d)

Degree Holder of Bachelor of Science in Architecture

46.

This became the first accredited professional organization on May 12, 1975 with the professional regulation commission issuing certificate no. 001  as the duly accredited professional organization for architects in the Philippines.

a)

League of Philippine Architects (LPA)

b)

Association of Philippine Government Architects (APGA)

c)

Philippine Institute of Architects (PIA)

d)

United Architects of the Philippines (UAP)

47.

A registered and license architect , who is directly and professionally responsible for the total design of the project for the client and who shall assume the civil liability for the plans, specifications and contract documents he/she has signed and sealed.

a)

None of the Above

b)

Architect-in-charge of Construction

c)

Architect of Record

d)

Consulting Architect

48.

A registered and licensed architect or permitted to practice under RA9266, who is professionally and academically qualified and with exceptional or recognized expertise or specialization in any branch of architecture.

a)

Architect of Record

b)

None of the Above

c)

Architect in-charge of Construction

d)

Consulting Architect

49.

The month and year of the promulgation of the National Building Code of the Philippines by Ferdinand Marcos.

a)

June 1977

b)

June 1956

c)

June 1950

d)

February 1977

50.

The law provided for a more comprehensive regulation of the registration, licensing and practice of architecture, repealing "The Architecture Law" of 1950.

a)

RA 545

b)

PD 1096

c)

RA 544

d)

RA 9266

51.

Which of the following is not a scope of work of an consulting architect?

a)

Giving oral and written advice on the proposed project.

b)

Preparing and signing/sealed drawings for building permit purposes

c)

Evaluating the feasibility studies and drawings.

d)

Appraisals and adjustments on the pre-design services

52.

Which of the following is  not part of scope of work of an architect-in charge in construction?

a)

Site Inspection

b)

Project Planning

c)

Supervision

d)

Contract Documents

53.

RLAs means?

a)

Registered Licensed Architects

b)

Registered and Licensed Architects

c)

None of these

d)

Register and License Architects

54.

These are architectural services ranging from initial problem identification to activities that would allow the Architect to initially conceptualize an array of architectural and allied solutions.

a)

Comprehensive Design Services

b)

Regular Design Services

c)

Specialized Architectural Services

d)

Pre-Design Services

55.

It was enacted to regulate the local practice of architecture after the Second World War.

a)

RA 9266

b)

RA 544

c)

RA 545

d)

RA 1581

56.

This is the first private school to offer an academic title for Maestro de Obras dated 1900 during Spanish era.

a)

Lyceum de Manila

b)

Liceo de Manila

c)

Liceo de Pilipinas

d)

Liceo de Institution

57.

The first academic school to train these Maestro de Obras.

a)

University of the Philippines

b)

University of Santo Tomas

c)

Escuela Practica y Professional de Artes y Oficio de Manila

d)

Colegio de San Ildefonso

58.

What core values does the architect have if he/she has critical judgment, deep insights and a level of discretion that comes from a comprehensive understanding of the whole?

a)

Integrity

b)

Honesty

c)

Leadership

d)

Prudence

59.

The first Filipino recorded architect.

a)

Juan Arellano

b)

Tomas Mapua

c)

Felix Roxas y Arroyo

d)

Carlos Barreto

60.

The Architect can render services in any of the following ways:

a)

By Association, Consultation or Networking

b)

Architect’s Own Staff

c)

All of these

d)

As an individual Architect he must have special training and be knowledgeable in different fields to supplement his skills.

61.

Part of the pre-design services of an architect which requires primary data gathering and analysis.

a)

Consultation

b)

Feasibility Studies

c)

Promotional Services

d)

Evaluation

62.

A pre-design service where in the architect identifies the adequate size and appropriate configuration and assemblage for a proposed project in consideration of the use, allocation and interface of spaces for given activities.

a)

Space Research

b)

Space Planning

c)

Architectural Programming

d)

Space Programming

63.

The Architect, in the process of translating abstract ideas into meaningful concrete terms, produces documents in the form of a data base report. an architectural program, a feasibility study, a market study, an appraisal report, an impact analysis report, a space organizational setup report, a site planning analysis and evaluation report, an operational programming report, building programming and scheduling report. 

a)

Factual

b)

Not defined.

c)

Malicious

d)

Incorrect

64.

An analysis of the space requirements of the project based on organizational structure and functional set-up pinpoints linkages and interaction of spaces is called __________. 

a)

Space Management Studies

b)

Space Analysis

c)

Space Planning

d)

Space Program

65.

Which of the following is correct on the pre-design services of an architect?

a)

The architect can be involve in the identification of a site’s development potentials through the proper utilization of land.

b)

Outline specifications to fix and illustrate the size and character of the entire project as to type of materials.

c)

Makes periodic visits to the project site to familiarize himself with the general progress and quality of work on site.

d)

Prepares the complete Contract Documents consisting of detailed designs.

66.

This method of compensation is frequently used where there is continuing relationship involving a series of projects. It establishes a fixed sum over and above the reimbursement for the Architect’s technical time and overhead. An agreement on the general scope of the work is necessary in order to set an equitable fee.

a)

Mixed Methods of Compensation

b)

Fixed Fee Plus Reimbursable Expenses

c)

Professional Fee Plus Expenses

d)

Honorarium Plus Reimbursable Expenses

67.

These are architectural services ranging from initial problem identification to activities that would allow the Architect to initially conceptualize an array of architectural and allied solutions.

a)

Pre-Design Services

b)

Specialized Architectural Services

c)

Regular Design Services

d)

Comprehensive Design Services

68.

It is the service where in it represent the Architect’s initial assessment of a project’s soundness.

a)

Feasibility Studies

b)

Pre-Feasibility Studies

c)

Architectural Programming

d)

Feasibility Management