wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

ID Unit 4 Review

Total questions: 50

Worksheet time: 25mins

Name
Class
Date
1.

The designer finalized the design for the house and submitted the paperwork for the clients to sign. What is this paperwork known as?

a)

ideation

b)

innovation

c)

proposal

d)

prototype

2.

Janie constructed a three-dimensional representation of a floor plan. She made a:

a)

design board

b)

mood board

c)

portfolio

d)

model

3.

Why would a designer choose a physical board over a digital board?

a)

A physical board takes less time to develop, while a digital board can take weeks to develop .

b)

A physical board has depth and tactile textures, while a digital board only has visual texture.

c)

A physical board can be easily changed at a clients request, while a digital board takes more time to adjust.

d)

A physical board can be delivered only via email, while a digital board can be sent in person for approval.

4.

Why is a design concept statement important?

a)

to appeal to the client's point of reference and give the designer boundaries

b)

to give all the specifics about what will go into the design

c)

to allow the client to go shopping for their own accessories

d)

to tie the project together at the end

5.

A design schematic is:

a)

an arrangement of images, materials, textures, and colors that evoke the style of a project

b)

an arrangement of the furniture and accessories, as well as background treatments one would recommend

c)

a complete room design including a floor plan with furniture and decor laid out to scale

d)

a beginning chart of circles that show relationships of where items or rooms will be

6.

A designer is reviewing design schematics with a client, and they are discussing ways to adapt the plan. Which communication skills are being used by the client?

a)

active listening

b)

passive listening

c)

nonverbal communication

d)

written communication

7.

Renee made a list of points to cover with her client and practiced going over them with a colleague. These are important steps in preparing for a/an:

a)

design concept statement

b)

digital portfolio

c)

mood board

d)

oral presentation

8.

Floor plans, color schemes, furniture pictures, and fabric ad paint samples are included on which type of presentation board?

a)

color board

b)

design schematic board

c)

gypsum board

d)

mood board

9.

Which presentation board is used during the planning stage to convey the feeling of a design?

a)

floor plan

b)

gypsum board

c)

mood board

d)

color board

10.

Developing a 3 D model for clients allows them to:

a)

purchase the items

b)

view a rendered elevation

c)

view a rendered floor plan

d)

visually experience the space

11.

A designer is monitoring work to be completed by an electrician, a plumber, and a cabinet installer for the Shulers' kitchen. Which stage of the design process would this be considered?

a)

contract administration

b)

design development

c)

programming

d)

schematic

12.

Mark created quick sketches from the information the client has given him, to help envision the project. What part of the design process is he in?

a)

contract documents

b)

design development

c)

programming

d)

schematic design

13.

Tricia liked the interior designer's portfolio and decided to hire him for her project. This happens during:

a)

contract documents

b)

design development

c)

pre-design

d)

schematic design

14.

The design team discussed the project goals, costs, and deadlines. Which term describes this?

a)

feasibility

b)

insight

c)

logistics

d)

scope

15.

During which phase of the design process does a designer narrow design concepts from the schematic phase for the client's review and approval?

a)

contract documents

b)

design development

c)

pre-design

d)

programming

16.

The kitchen and bath designer had to coordinate the cabinetmaker, cabinet installer, countertop installer, and the tile installer to make sure the job was completed perfectly. Which term describes this?

a)

feasibility

b)

insight

c)

logistics

d)

scope

17.

Jodie, the designer, revised the drawings and is waiting for the client's approval of solutions. Which phase of the design process is she in?

a)

contract document

b)

design development

c)

programming

d)

schematic design

18.

Joanna reviews the final plan with her clients for their approval. Which phase of the design process is this?

a)

contract documents

b)

design development

c)

pre-design

d)

schematic design

19.

A client program is developed during which stage of the design process?

a)

contract documents

b)

design development

c)

programming

d)

schematic design

20.

In the design process, what is the first phase, which involves interviewing the client and taking an inventory of furniture, fixtures, and equipment?

a)

contract administration

b)

designer development

c)

move-in / post-occupancy

d)

programming

21.

Mark created quick sketches from the information the client has given him, to help envision the project. What part of the design process involves drawings?

a)

contract documents

b)

design development

c)

programming

d)

schematic design

22.

A designer is monitoring work to be completed by an electrician, a plumber, and a cabinet installer for the Shulers' kitchen. Which stage of the design process is the CONTRACTED work being done?

a)

contract administration

b)

design development

c)

programming

d)

schematic design

23.

Tricia liked the interior designer's portfolio of past projects and decided to hire him. This happens BEFORE design actually begins:

a)

contract documents

b)

design development

c)

pre-design

d)

schematic design

24.

The design team discussed the project goals, costs, and deadlines. Which term describes an overview all of these things?

a)

fesability

b)

insight

c)

logistics

d)

scope

25.

The designer revised and is DEVELOPING the drawings and is waiting for the client's approval of solutions. Which phase of the design process is she in?

a)

contract document

b)

design development

c)

programming

d)

schematic design

26.

The kitchen and bath designer had to coordinate the cabinetmaker, cabinet installer, countertop installer, and the tile installer to make sure the job was completed perfectly and on time. Which term describes coordinating a complex operation?

a)

feasibility

b)

insight

c)

logistics

d)

scope

27.

A client PROGRAM is developed during the First stage of the design process?

a)

contract documents

b)

design development

c)

programming

d)

schematic design

28.

First phase which involves interviewing the client and taking an inventory of furniture, fixtures, and equipment?

a)

contract administration

b)

design development

c)

move-in / post occupancy

d)

programming

29.

Renee made a list of points to cover with her clients and practiced going over them with a colleague. These are important steps in preparing for a/an:

a)

design concept statement

b)

digital portfolio

c)

mood board

d)

oral presentation

30.

"The basis of the design brings the culture of the area into the space to ensure comfort in the family room"

a)

contract

b)

color story

c)

interior design concept statement

d)

presentation board

31.

3D representation of a floor plan - like your shoeboxes

a)

design board

b)

mood board

c)

model

d)

portfolio

32.

a complete room design/DRAWING including a furniture plan laid out to scale

a)

concept statement

b)

active listening

c)

design schematic

d)

bubble diagram

33.

a designer will want to use which types of communication to get information from the client during a face-to-face meeting

a)

verbal communication

b)

verbal communication and active listening

c)

written communication

d)

written communication & passive listening

34.

presentation board used during the planning stage to convey the FEELING of a design

a)

floor plan

b)

gypsum board

c)

mood board

d)

color board

35.

the designer finalized the design for the house and submitted the paperwork for the clients to sign. this paperwork is:

a)

floor plan

b)

innovation

c)

proposal

d)

prototype

36.

why would a designer choose a physical board(has real samples you can touch) over a digital board

a)

a physical board takes more time to develop

b)

a physical board has depth and tactile textures

c)

a physical board can be easily changed

d)

a physical board can be delivered via email

37.

developing a 3D model (like your shoebox) for the clients allows them to

a)

purchase the items

b)

view a rendered elevation

c)

view a rendered floor plan

d)

visually experience the space

38.

a designer is reviewing design schematics with a client and they are discussing ways to adapt the plan. Which communication skills are being used by the client

a)

active listening

b)

passive listening

c)

nonverbal communictation

d)

written communication

39.

floor plans, color schemes, furniture pictures, and fabric and paint samples are included on which type of presentation board

a)

color board

b)

design schematic board

c)

gypsum board

d)

mood board

40.

Tricia liked the interior designer's portfolio and decided to hire him for her project. This happens during:

a)

Schematic Design

b)

Design Development

c)

Pre-Design

d)

Contract Documents

41.

Mark created quick sketches from the information the client has given him, to help envision the project. What part of the design process is he in?

a)

Schematic Design

b)

Design Development

c)

Programming

d)

Contract Documents

42.

During which of these steps of the design process is the designer ready to have their client review designs?

a)

Schematic Design

b)

Design Development

c)

Programming

d)

Contract Documents

43.

The kitchen and bath designer had to coordinate the cabinetmaker, cabinet installer, counter top installer, and the tile installer to make sure the job was completed correctly during the _______ phase of the design process.

a)

Programming

b)

Move-in / Post-Occupancy

c)

Schematic Design

d)

Contract Administration

44.

The designer finalized the design for the house and submitted the paperwork for the clients to sign. What is this paperwork known as?

a)

Ideation

b)

Innovation

c)

Proposal

d)

Prototype

45.

A designer is monitoring work to be completed by an electrician, a plumber, and a cabinet installer for the Shulers' kitchen. Which stage of the design process would this be considered?

a)

Contract Administration

b)

Programming

c)

Design Development

d)

Schematic Design

46.

 

The design team discussed the project goals, costs, and deadlines. Which term describes this?

a)

feasibility

b)

logistics

c)

scope

d)

insight

47.

During which phase of the design process does a designer narrow design concepts from the schematic phase for the client's review and approval?

a)

Contract Documents

b)

Schematic Design

c)

Design Development

d)

Pre-Design

48.

Jodie, the designer, revised the drawings and is waiting for the client's approval of solutions. Which phase of the design process is she in?

a)

Contract Documents

b)

Programming

c)

Design Development

d)

Schematic Design

49.

In the design process, what is the first phase, which involves interviewing the client and taking an inventory of furniture, fixtures, and equipment?

a)

Contract Administration

b)

Move-in / Post Occupancy

c)

Design Development

d)

Programming

50.

Audra sent her client, Sherry, an email requesting that she leave her a yelp review of her recent successfully redesigned primary bathroom. What step in the design process is this?

a)

Contract Administration

b)

Pre-Design

c)

Move in/ Post Occupancy

d)

Programming