wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

t511/t711 ST Day 2 Review

Total questions: 10

Worksheet time: 30mins

Name
Class
Date
1.

Which voltages are generated from the power supply?

a)

5VDC

b)

12VDC

c)

24VDC

d)

35VDC

e)

42VDC

2.

Which fuse has to be checked in case the sampling unit Motor handler X doesn’t work?

a)

F3

b)

F4

c)

F5

d)

F6

3.

Which components are involved in the safety mechanism of the main cover?

a)

Safety interlock

b)

PCB fuse board control

c)

Service switch / indicator

d)

Power Box

4.

Does it work if you buy this particular hard disk for the IPC from an electronic

shop to replace it?

a)

Yes

b)

No

5.

What information stored on the PCB Power Control board?

a)

transfer unit teaching data

b)

sampling unit teaching data

c)

instrument serial number

d)

Installation date

6.

Which D&S workflow has to be done after replacing the PCB power control?

a)

Format EEPROM

b)

Format EEPROM Teach sample unit

c)

Teach transfer unit

d)

None

7.

You have replaced the y motor of the sampling unit – if you need special tools to adjust the y-arm afterwards?

a)

Yes

b)

No

8.

Which PCB can not be used directly from another instrument without teachin?

a)

PCB ANALYZER TRIPLE MOTION CONTROL

b)

PCB BACKPLANE ANALYZER 2MC

c)

PCB Resource handling 3

d)

mSATA

9.

Which cable delivers the power from the power supply to the instrument module(t711 module)?

a)

PSS-J10

b)

PSS-J11

c)

PSS-J13

d)

PSS-J14

10.

Which teaching data are stored in the mSATA?

a)

Transfer unit

b)

Sampling unit

c)

Cuvette elevator

d)

Reagent storage