wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

FINALS B.C

Total questions: 35

Worksheet time: 18mins

Name
Class
Date
1.

What type of construction is characterized by buildings made of wood?

a)

Type IV

b)

Type III

c)

Type II

d)

Type I

2.

Which type of construction involves buildings made of masonry and wood?

a)

Type III

b)

Type I

c)

Type IV

d)

Type II

3.

What are the requirements for buildings located in more than one fire zone?

a)

Approval from the fire department

b)

Relocation of the building

c)

Additional fire-resistant materials

d)

No specific requirements

4.

What is the fire-resistive time period rating defined as?

a)

The time it takes for a building to catch fire

b)

The time it takes for firefighters to arrive at the scene

c)

The time it takes for a building to collapse in a fire

d)

The time a building can withstand fire exposure

5.

What do fire-resistive regulations specify?

a)

Emergency evacuation procedures

b)

Fire insurance requirements

c)

Fire department contact information

d)

Materials for building construction

6.

What is the purpose of the National Building Code of the Philippines?

a)

To restrict the development of urban areas

b)

To promote the use of combustible materials in construction

c)

To regulate the construction of traditional indigenous family dwellings

d)

To provide guidelines for building design and construction

7.

Who is responsible for the administration and enforcement of the provisions of the National Building Code?

a)

The Secretary of Health

b)

The Secretary of Education

c)

The Secretary of Public Works, Transportation and Communications

d)

The President of the Philippines

8.

What is the time period rating for fire-resistive materials?

a)

One-hour, two-hours, three-hours, four-hours, etc.

b)

One-day, two-days, three-days, four-days, etc.

c)

One-month, two-months, three-months, four-months, etc.

d)

One-week, two-weeks, three-weeks, four-weeks, etc.

9.

What is the maximum fine that can be imposed for the violation of any provision of the National Building Code?

a)

₱20,000

b)

₱10,000

c)

₱5,000

d)

₱15,000

10.

What is the definition of fire zones in the National Building Code?

a)

Areas within which all types of buildings are permitted to be constructed

b)

Areas within which no buildings are permitted to be constructed

c)

Areas within which only residential buildings are permitted to be constructed

d)

Areas within which only certain types of buildings are permitted to be constructed based on their use or occupancy

11.

What is the requirement for existing buildings in fire zones that do not comply with the requirements for a new building erected therein?

a)

They must be completely demolished

b)

They must be enlarged or altered to comply with the new requirements

c)

They must be repaired using the same kind of materials of which the building was originally constructed

d)

They must be moved outside the limits of the more highly restrictive Fire Zone

12.

Who is authorized to issue a building permit under the National Building Code?

a)

The President of the Philippines

b)

The Secretary of Public Works, Transportation and Communications

c)

The Mayor of the city or municipality

d)

The owner of the building

13.

What is the responsibility of the Building Official in the field?

a)

To conduct inspections and determine compliance with the requirements of the Code

b)

To issue building permits

c)

To formulate policies, plans, standards, and guidelines on building design

d)

To evaluate, review, approve, and/or take final action on changes and/or amendments to existing Referral Codes

14.

What is the definition of fire-resistive rating in the National Building Code?

a)

The classification of materials of construction according to their fire-retardant or flame-spread ratings

b)

The degree to which a material can withstand fire as determined by generally recognized and accepted testing methods

c)

The standards and regulations for the testing of construction materials for flame-spread characteristics

d)

The length of time a material can withstand being burned

15.

Who is responsible for the formulation of necessary rules and regulations and the adoption of design and construction standards and criteria for buildings and other structures?

a)

The President of the Philippines

b)

The Secretary of Public Works, Transportation and Communications

c)

The Secretary of Health

d)

The Secretary of Education

16.

What is the title of the Decree?

a)

Architectural Guidelines of the Philippines

b)

Construction Standards of the Philippines

c)

National Building Code of the Philippines

d)

Building Safety Regulations of the Philippines

17.

What is the policy declared by the State in the Declaration of Policy?

a)

To prioritize environmental conservation over building safety

b)

To safeguard life, health, property, and public welfare

c)

To promote industrial growth and development

d)

To encourage foreign investment in construction

18.

Which buildings are exempt from payment of building permit fees?

a)

Educational institutions and healthcare facilities

b)

Government buildings and industrial structures

c)

Commercial buildings and residential apartments

d)

Public buildings and traditional indigenous family dwellings

19.

Who is responsible for the administration and enforcement of the provisions of the Code?

a)

Secretary of Public Works, Transportation and Communications

b)

Secretary of Environment and Natural Resources

c)

Secretary of Trade and Industry

d)

Secretary of Interior and Local Government

20.

What is the minimum period for a building permit to expire and become null and void if the building work is not commenced?

a)

Three months

b)

One year

c)

Six months

d)

Two years

21.

What is the penalty for violating any of the provisions of the Code?

a)

Fine of not more than thirty thousand pesos or imprisonment of not more than three years or both

b)

Fine of not more than fifteen thousand pesos or imprisonment of not more than six months or both

c)

Fine of not more than ten thousand pesos or imprisonment of not more than one year or both

d)

Fine of not more than twenty thousand pesos or imprisonment of not more than two years or both

22.

Who is responsible for the full-time inspection and supervision of the construction work?

a)

Duly licensed architect or civil engineer

b)

Building Official

c)

Secretary of Public Works, Transportation and Communications

d)

Owner of the Building

23.

What is the period within which the Building Official shall issue a Certificate of Occupancy after final inspection?

a)

Thirty days

b)

Ninety days

c)

Fifteen days

d)

Sixty days

24.

Who is authorized to prescribe the procedures for the use of all net income realized by the office of the Building Official from the collection of fees and charges?

a)

Secretary of Finance

b)

Building Official

c)

Secretary

d)

City or Municipal Treasurer

25.

What is the term used in the Code for a dwelling intended for the use and occupancy by the family of the owner only and constructed of native materials?

a)

Indigenous household unit

b)

Native family residence

c)

Family-owned native house

d)

Traditional indigenous family dwelling

26.

Which group of occupancy includes residential dwellings?

a)

Group A

b)

Group D

c)

Group B

d)

Group C

27.

What is the minimum ceiling height for habitable rooms with artificial ventilation?

a)

1.80 meters

b)

2.40 meters

c)

2.70 meters

d)

3.00 meters

28.

What is the minimum size of kitchens as per the National Building Code?

a)

1.20 square meters with a least dimension of 0.90 meter

b)

3.0 square meters with a least dimension of 1.50 meters

c)

6.00 square meters with a least dimension of 2.00 meters

d)

4.50 square meters with a least dimension of 2.50 meters

29.

What is the minimum air space requirement for habitable rooms per person?

a)

12.00 cubic meters

b)

16.00 cubic meters

c)

10.00 cubic meters

d)

14.00 cubic meters

30.

What is the minimum size of vent shafts as per the National Building Code?

a)

0.20 square meter for every meter of height

b)

0.15 square meter for every meter of height

c)

0.05 square meter for every meter of height

d)

0.10 square meter for every meter of height

31.

What is the maximum allowable floor area for one-storey buildings?

a)

Dependent on the type of construction

b)

Dependent on the location on property

c)

Dependent on the use

d)

Dependent on the height of the building

32.

is the general requirement for the location of a building on the property?Adjoining a public space, yard, or street on at least one side

a)

TRUE

b)

FALSE

c)

ALL

d)

NONE

33.

What is the maximum height of every building dependent upon?

a)

Type of construction and character of occupancy

b)

All of the above

c)

Widths of streets and car parking requirements

d)

Population density and building bulk

34.

is the requirement for the water supply system for buildings used for human habitation IS existing municipal or city waterworks system?

a)

TRUE

b)

FALSE

c)

ALL

d)

NONE

35.

What is the requirement for the disposal of sanitary sewage from buildings?

a)

It shall be disposed into the storm drainage system

b)

It shall be discharged directly into the nearest street sanitary sewer main

c)

It shall be disposed into the nearest open water courses

d)

It shall be disposed into the nearest public street or alley