1.

A Temporary Defeat or bypass occurs when an HSE Critical Equipment and System (HSECES) is taken out of service (isolated or shut down) while the equipment or facility being protected remains in service.

a)

True

b)

False

c)

Maybe

2.

Defeats of HSECES shall be allowed in the following situation/s.

a)

All answers are correct

b)

For continued safe operations

 

c)

 For testing of devices

d)

For maintenance

3.

Zero Energy Demonstration is the verification of the “Integrity” and “Effectiveness” of an Isolation by means of Testing, Checking, Opening Vents/ Drains or trying to operate equipment.

a)

True

b)

False

c)

Maybe

4.

The Electrical Energy Isolation Certificate will specify Low Voltage (LV) or High Voltage (HV).

a)

False

b)

True

c)

Maybe

5.

Effective energy isolation ensures that equipment remains safely isolated for the duration of any work activity and _____________ accidental re-pressuring or re-energizing of equipment.

a)

makes

b)

helps

c)

ensures

d)

prevents

6.

For routine operations, which of the following statements regarding SIMOPS Coordinator (SC) is true?

a)

SC is not required

b)

Permit Issuer (PI) acts as SC

c)

Area Authority (AA) acts as SC 

d)

All answers are correct.

7.

Non-routine or ‘occasional’ SIMOPS can occur in the case of:

a)

 Maintenance or modification of an existing facility 

b)

 General Work in confined space

c)

Pumps inspections

d)

Critical Work

8.

SIMOPS Coordinator (SC) shall have a SIMOPS document containing:

a)

Site Layout Diagram

b)

Details of environmental conditions

c)

All documents combined

d)

Matrix of Permitted Operations

9.

Requirement to conduct an independent verification of each isolation point is determined by:

 


a)

Asset Approval Authority

b)

Area Authority (AA)

c)

Isolating Operator (ISO)

d)

Isolating Authority (ISA)

10.

Who is the Certificate Applicant for the Temporary Defeat Certificate for a Process Defeat?

a)

Maintenance Supervisor

b)

DCS (Distribution Control System) Supervisor

c)

Senior Vice President, HSE

d)

Formal Risk Assessment Team Leader

11.

Who tags and locks the isolated device/equipment?

a)

Area Authority (AA)

b)

Permit Issuer (PI)

c)

Isolating Authority (ISA)

d)

Isolating Operator (ISO) 

12.

Who authorizes Sanction to Test (STT)?

. 

a)

Area Authority (AA) 

b)

Isolating Operator (ISO)

c)

Isolating Authority (ISA)

d)

Job Performer (JP)

13.

What methods are used to prove effectiveness of isolation?

a)

Venting or draining a valve

b)

Testing a circuit

c)

Attempting to operate equipment

d)

 All methods are needed

14.

Before the Extended Period Isolation (EPI) is brought to Live and linked to a work permit; when is an integrity check of the isolation required?

 

a)

Never

b)

Always  

c)

 At the decision of the AA

d)

Sometimes 

15.

To conduct a Sanction to Test (STT), which of the following is true?

a)

All steps shall be needed

b)

 Approval shall be required from the Area Authority (AA)

c)

 A separate STT Form shall be utilized to record the signatures

d)

All existing permits shall be suspended