POB1-Sources of information used in construction

Total questions: 27

Worksheet time: 15mins

Name
Class
Date
1.

Many different sources of information are used in the construction industry to make sure that things are built accurately, safely and according to :

a)

Council Regulations

b)

Building Regulations.

c)

Local Planning Regulations

2.

The sources of information used in construction are as follows:

a)

Drawings and Building Regulations

b)

Specifications and Schedules

c)

Programme of Work

d)

Construction Magazine Daily

3.

Technical drawing need to meet the criteria set out by :

a)

British Standards

b)

Building Regulations

c)

HSE

d)

Local Council

4.

Technical drawings are done by:

a)

Engineers

b)

Designers

c)

Architects

d)

Labourers

5.

The primary work completed in a building before the walls and ceilings are plastered, such as installing windows, door frames and stairs is called:

a)

Second Fix

b)

First Fix

c)

Addendum

d)

Third Fix

6.

Carpentry work completed after the walls and ceilings have been plastered, such as installing skirting, architraves and doors is called:

a)

First Fix

b)

Second Fix

c)

Addendum

d)

Third Fix

7.

True or False: Working drawings are referred to when calculating costs and the quantity of materials required for producing work.

a)

True

b)

False

8.

True or False: Joiners may use working drawings to price work, estimate quantities of materials and produce full-size setting out rods to make joinery items, such as windows, doors and stairs.

a)

True

b)

False

9.

True or False: Construction drawings are often created with two dimensions (2D): length and width.

a)

True

b)

False

10.

True or False: Drawings can also be drawn in three dimensions (3D): length, width and depth.

a)

True

b)

False

11.

Most building projects require different types of drawings to be drawn and submitted to the local authority for approval before work can start. The application usually includes :

a)

plans of the area

b)

the proposed construction site

c)

detailed elevation drawings of one or more buildings.

12.

All proposed construction work must be completed to industry-recognised :

a)

Local council standards

b)

British Values

c)

Building Regulations

13.

True or False: Building Regulations provide detailed information on every aspect of building work, from the foundations to the roof.

a)

True

b)

False

14.

Because it is not always possible to include all the information needed on a drawing, it is usually written down in a document known as :

a)

Specification

b)

Programme of Work

c)

Working Drawings

15.

Specifications are usually produced by :

a)

an architect

b)

an engineer

c)

a designer

d)

building consultant

16.

A chart containing details about a particular aspect of a project; for example, doors, windows, kitchens and sanitary items such as baths, showers and toilets is called a:

a)

Schedule

b)

Specification

c)

Programme of Work

17.

To complete the building project on time, a document is produced. This document contains a list of all the activities that need to be completed and a breakdown of the number of weeks in which to complete them. Each task has an amount of time allocated to it so that the construction site manager can organise materials, resources and the tradespeople to arrive on site in the correct order and at the right time. This document is called a:

a)

Specification

b)

Programme of Work/Gantt Chart

c)

Schedule

18.

This document is produced by a quantity surveyor. It contains a breakdown of all the different aspects of a building project contained on the working drawings and specification. This document forms part of a package of documents, including the drawings and specification, that are sent to potential contractors so that they can price for a job. The contractors will then provide unit costs and labour rates against each aspect of the work, so that a total cost can be calculated and returned to the client. This document is called a:

a)

Bill of Quantities

b)

Invoice

c)

Delivery Note

19.

Materials and products that are delivered to the workplace will be accompanied by a certain document from the supplier. It is usually on the company’s headed paper (with a logo and address). It contains information about the quantity of materials that have been delivered, the delivery address and a reference number.

a)

Delivery Note

b)

Invoice

c)

Requisition Order

20.

The delivery note should be signed by the person receiving the goods after they have checked that:

a)

no items are damaged

b)

the correct type of materials have been delivered

c)

no materials are missing

d)

the correct quantity of materials have been delivered

21.

This document is like a delivery note. It is given by suppliers to people who have received goods or services on credit, showing a breakdown of the costs they are expected to pay. This document is called an:

a)

Delivery note

b)

Invoice

c)

Bill of quantities

22.

This document is usually issued by supervisors or managers to employees. They are documents detailing work to be carried out and sometimes materials to be used, and an allocated timescale.

a)

Job Sheet

b)

Duty Sheet

c)

Invoice

23.

This document used to formally request materials from suppliers. They are used to keep a record of purchases made for each job, and control who can use a credit account with their suppliers.

a)

Delivery Note

b)

Requisition Order

c)

Invoice

24.

This document is normally completed by a construction site manager, to record day-to-day events that have happened. This could include weather conditions, deliveries and site inspections.

a)

Site diary

b)

Site work schedule

c)

Delivery note

d)

Job sheet

25.

This document is sent by a business to people or businesses that have credit accounts with them. It lists all the invoices that have been sent that month, the amount of credit for each one and a total amount of money expected to pay. These usually must be paid within 30 days of receiving them.

a)

Statement

b)

Invoice

c)

Bill of quantities

26.

This document is used by employees to record the hours worked on every job. This information is then used to calculate wages and to estimate labour costs for future contracts.

a)

worksheet

b)

timesheet

c)

logbook

27.

When an agreement has been made between a contractor and a client to undertake work, they usually sign a contract. If a change is made to the terms of the contract during completion of the work, then a document must be completed before progressing. This document is called :

a)

Architect's instruction/variation order

b)

Requisition order

c)

Statement