Who prescribe and impose the amount of fees and other charges
BO
DPWH Secretary
Secretary
Owner
Who collect the fees or other charges
BO
DPWH Secretary
Secretary
Owner
A written authorization granted by the Building
Official to an applicant allowing him to proceed
with construction after plans, specifications and
other pertinent documents have been found to be
in conformity with the Code
Building occupancy
Building permit
Change of Order
Plans and Specification
Building permit will be null and void if not accompanied by the ____?
Accessory Permit
Building Occupancy
Ancillary Permit
Building Permit
Which is not included as Ancillary Permit
Electrical Permit
Mechanical Permit
Plumbing Permit
House Permit
What permit is needed for activities being undertaken prior to or during the processing of building permit. The permit include ground preparation and excavation, Fencing , Sidewalk construction etc
Ancillary Permit
Building Permit
Home Permit
Accessory Permit
Maximum height of fence you can build for Accessory Permit
1.5m
2m
1.2m
3m
Building permit is exemption for minor construction or less detached buildings with maximum ___ sqm
5 sqm
10 sqm
6 sqm
12 sqm
Additional open terraces or patios resting directly on the ground is exempted from building permit if not exceed with ___ total floor area?
10 sqm
30 sqm
50 sqm
20 sqm
Do Garden Masonry walls with 2m height need building permit?
Yes
No
How many set of plans I need for building permit if lot is not owned?
7 sets
5 sets
3 sets
12 sets
Article 1723 of the Civil Code states that the
engineer or architect who drew up the plans and
specifications is liable for ____years from
completion of the building should it collapse due
to defects in the plans or the ground.
10 years
15 years
5 years
20 years
Who is liable in case of building collapses due to defects in construction or the used of inferior materials.
Contractor
Architect
Owner
Engineer
How many months can a construction stops before building permit expires
5 months
4 months
6 months
12 months
Masonry and wood construction with one hour fire resistive rating . Exterior walls shall be of incombustible fire resistive construction
Type 1
Type 2
Type 3
Type 4
Steel, Iron , Concrete or masonry construction. Incombustible interiors such as ceiling and walls
Type 1
Type 2
Type 3
Type 4
How many type of construction NBCP have?
3
4
5
6
In a fire restrictive zones which type of construction is not allowed
Type 1
Type 2
Type 3
Type 4
means the degree to which a material can withstand fire as determined by
generally recognized and accepted testing methods.
Fire Rating
Fire resistive rating
Fire Retardant
Fire Rating period
for a construction of Solid RC Slab with overall depth of 150mm and average cover to reinforcement for 25mm how many hours is fire resistance
3 hours
4 hours
2 hours
1 hours
for a construction of Solid RC Slab with overall depth of 100mmand average cover to reinforcement for 15mmhow many hours is fire resistance
3 hours
4 hours
2 hours
1 hours
When was the first conferment of title APEC architect made
2000
2006
2010
2017
is the art, science or profession of planning, designing and
constructing buildings in their totality taking into account their environment, in accordance with
the principles of utility, strength and beauty;
Architecture
Design
Architect
PCC
who is responsible for advocating the fair and sustainable
development, welfare and cultural expression of society’s habitat in terms of space, forms and
historical context;
Architect
AOR
CSG
CA
who is directly and professionally responsible for the total design of the project for the
client and who shall assume the civil liability for the plans, specifications and contract
documents he/she has signed and sealed;
Architect
AOR
CSG
CA
means the architect registered and licensed or permitted to
practice under R.A. No. 9266, who is professionally and academically qualified and with
exceptional or recognized expertise or specialization in any branch of architecture;
Architect
AOR
CSG
CA
PRB means?
Professional Regulatory Board
Philippine Regulatory Board
Professional Regulatory Book
Professional Regulation Board
Who among the choices cannot issue a construction?
Prudential Guarantee
UCPB Generali
MAPRE
Salvador bail bond
Type of specification that identifies the manufacturers name and brand name?
Closed
Performance
Descriptive
Reference
Which should be avoided in Specification writing?
Long and ambiguous sentences
Simple declarative sentences
Plain worded Specs
Essay type specs
What is the size of basic drawing submitted to the OBO in application of building permit
A1 size
A0 size
A3 size
A2 size
The architect has been choses a winning bidder but the OWNER doesn't approve, what is the architect course of action?
Negotiate
Re-bid
Toss coin
No action need
RA 9266 was singed when?
March 17 2004
Jan 28, 2024
March 17, 2024
April 10, 2004
How to determine the width of sidewalk
Volume of pedestrian
RROW
size of the place
Width of planting strip
This is not a reason for refusal of registration and removal of name from roster of architects or revocation of license.
Immoral and dishonorable conduct
Convicted on criminal offense
Conviction of political offense
Moral turpitude
Section 41 of RA 9266
Implementing Rules and Regulation of Code of Ethical Conduct and Standard of professional practice
Malpractice
Foreign Architect
NOTA
Section 40 of RA 9266
Implementing Rules and Regulation of Code of Ethical Conduct and Standard of professional practice
IAPOA
Foreign Architect