PP 8 Installation of Hot Water Pipework

Total questions: 39

Worksheet time: 20mins

Name
Class
Date
1.

Under which British Standard is the installation of hot water pipework covered?

a)

British Standard 1057

b)

British Standard 8558

c)

British Standard 100°C

d)

British Standard 95°C

2.

Which materials are usually used for hot water pipes and fittings

a)

PVC and rubber

b)

Copper tubes to BS EN 1057 and polybutylene pipes

c)

Steel and iron

d)

Aluminium and zinc

3.

What is the maximum temperature that hot water should never be allowed to reach in the pipework?

a)

95°C

b)

100°C

c)

105°C

d)

85°C

4.

The pipework should be capable of withstanding how many times the normal operating pressure of the system?

a)

One time

b)

One and a half times

c)

Twice

d)

Three times

5.

How are the installation methods for low pressure hot water systems compared to those for low pressure cold water systems?

a)

Completely different

b)

Very similar

c)

Not related

d)

Only similar in the use of materials

6.

What should be ensured when pressure testing open-vented cylinders?

a)

That the temperature is consistent

b)

That the cylinder is fully operational

c)

That the maximum pressure the cylinder can withstand is not exceeded

d)

That the cylinder is disconnected

7.

What should be done if necessary before pressure testing commences?

a)

The cylinder should be heated up

b)

The cylinder should be disconnected and the pipework capped

c)

The pipework should be replaced

d)

The pressure should be increased

8.

Why should care be taken when installing hot and cold water pipework side by side?

a)

To prevent the hot water pipework from cooling down

b)

To ensure easy maintenance

c)

To avoid the cold water installation being adversely affected by the hot water pipework

d)

To make the installation look more organized

9.

What types of pipes have different soundness tests according to the provided plumbing material?

a)

PVC and PEX

b)

Rigid pipe (copper) and plastic pipe

c)

Steel and iron

d)

Flexible hose and rigid hose

10.

What is the first step in the process of testing and decommissioning according to the Level 2 Technical Certificate in Plumbing?

a)

Set up equipment

b)

Visual inspection

c)

Test period

d)

Final check

11.

How long should the test pressure be maintained during the hydrostatic pressure testing of metal piping systems?

a)

5 minutes

b)

10 minutes

c)

15 minutes

d)

20 minutes

12.

What should be done if there is a pressure loss during the hydrostatic pressure test?

a)

Stop the test immediately

b)

Reduce the test pressure

c)

Maintain the test pressure until leaks are identified

d)

Increase the test pressure above the maximum design pressure

13.

What is the test pressure (TP) set to during a hydrostatic pressure test of metal piping systems?

a)

Equal to the maximum design pressure (MDP)

b)

1.1 x MDP

c)

0.9 x MDP

d)

2 x MDP

14.

What is the first step in the hydrostatic pressure testing procedure of plastic piping systems for water tightness?

a)

Fill the system with water

b)

Arrange for the system to be vented

c)

Apply the selected test pressure

d)

Check visually for leaks

15.

What should the test pressure (TP) be set to during the hydrostatic pressure testing of plastic piping systems?

a)

0.5 x MDP (maximum design pressure)

b)

1.0 x MDP (maximum design pressure)

c)

1.1 x MDP (maximum design pressure)

d)

2.0 x MDP (maximum design pressure)

16.

How long should the pressure be maintained after reducing it during the hydrostatic pressure test?

a)

15 minutes

b)

20 minutes

c)

30 minutes

d)

45 minutes

17.

What indicates that the plastic piping system is leak-tight after reducing the pressure in the hydrostatic pressure test?

a)

The pressure is below 0.5 x the operating pressure

b)

The pressure is equal to or greater than 0.5 x the operating pressure

c)

No visual leaks are detected

d)

The pressure is equal to or greater than 1.0 x the operating pressure

18.

What is the requirement of the British Standards regarding the flushing of hot water systems?

a)

Flushing with dirty water

b)

Flushing with clean water, direct from the water undertaker's main supply

c)

Flushing is not required

d)

Flushing with recycled water

19.

What is the purpose of flushing the systems as per the installation standards?

a)

To test the water pressure

b)

To make the water taste better

c)

To remove potential contaminants like flux residues, PTFE, excess jointing compounds, and swarf

d)

To check for leaks

20.

What indicates that the system has been properly flushed?

a)

The water runs with slight discoloration

b)

The water runs completely clear and free of any discoloration

c)

The water runs with a strong chemical smell

d)

The water temperature increases

21.

What should be done with hot water storage vessels and cold water storage cisterns during system flushing?

a)

They should be filled to the brim

b)

They should be insulated

c)

They should be drained down completely

d)

They should be disconnected

22.

What should be done after refilling the system during the flushing and disinfecting process?

a)

Add disinfectant to the system immediately.

b)

Open the kitchen tap and allow water to run until clear of debris/colour.

c)

Drain the system from the highest point.

d)

Close all taps and outlets and leave the system for 1 hour.

23.

For how long should disinfectant be added to the system during the disinfecting process?

a)

30 minutes

b)

1 hour

c)

2 hours

d)

Until the water runs clear

24.

What should be checked to ensure that they are operating correctly after the hot water system has been filled and flushed?

a)

Only the flow rates

b)

Only the water temperatures

c)

Thermostats and high-limit thermostats

d)

Thermostats, high-limit thermostats, flow rates, pressures, and water temperatures

25.

Against what should the flow rates, pressures, and water temperatures be checked after ensuring the correct operation of thermostats and high-limit thermostats?

a)

The manufacturer's instructions

b)

The system's initial design

c)

The local plumbing codes

d)

The personal judgment of the technician

26.

What instrument is used to measure flow rate in plumbing checks?

a)

Pressure gauge

b)

Weir cup

c)

Thermometer

d)

Stopwatch

27.

What should be done to ensure draw-off points are functioning correctly?

a)

Lubricate all draw-off points

b)

Open all draw-off points making sure they open and shut off properly

c)

Close all draw-off points tightly

d)

Inspect visually without operating

28.

What is the method for checking pressure in plumbing checks?

a)

Using a thermometer

b)

Using a flow meter

c)

Using a pressure gauge

d)

Using a level

29.

What is the responsibility of a plumber regarding thermostats and TMV's

a)

Replace all thermostats regularly

b)

Ensure correct temperature setting and inform customer

c)

Disconnect thermostats when not in use

d)

Install new thermostats at every visit

30.

What should be handed over to the customer once the plumbing system has been 'proved'?

a)

Manufacturer's instructions, benchmark certificate, warranty

b)

User manual, service agreement, receipt

c)

Installation guide, quality assurance certificate, product registration

d)

Operating manual, compliance document, guarantee

31.

What is the purpose of walking the customer around the system after it has been 'proved'?

a)

To show them where the system can be upgraded

b)

To demonstrate how to dismantle the system

c)

To show them all the settings and valves

d)

To instruct them on how to install additional components

32.

What is the first step in decommissioning a hot water system for maintenance and replacement of components?

a)

Heat source safely isolated

b)

Customer informed

c)

Warning notice placed on heat source

d)

Fuses removed

33.

What should be done to the heat source during the decommissioning of a hot water system?

a)

Customer informed

b)

System drained to safe location

c)

Heat source safely isolated

d)

Open ends capped

34.

During the decommissioning process, what is placed on the heat source as a safety measure?

a)

Fuses removed

b)

Customer informed

c)

Open ends capped

d)

Warning notice placed on heat source

35.

What is important for decommissioning a hot water system?

think legionella

(a)  

36.

During the process of temporary decommissioning, how is the water in the system discharged?

a)

The system is refilled and tested.

b)

The customer is informed.

c)

The part is replaced.

d)

A hose pipe is connected to a suitable drain point and the water is discharged to a below-ground drain.

37.

When is the customer informed during the temporary decommissioning process?

a)

After the system is refilled and tested.

b)

Before the system is safely isolated and labeled.

c)

After the hose pipe is connected to the drain point.

d)

Both before the process begins and after it is completed.

38.

What is the recommended solution for poor pressure in plumbing due to a low cold water feed/storage cistern?

a)

Check and test the thermostat and energy cut-out and replace

b)

Check the cold feed connection and the hot water draw-off and descale as required

c)

Raise the cistern to increase the distance to hot water outlets

d)

Failure of the immersion heater thermostat and energy cut-out

39.

What should be checked if there is very hot water discharging into the cold water feed/storage cistern from the open vent?

a)

The cold feed connection and the hot water draw-off

b)

The distance between the cistern and hot water outlets

c)

The immersion heater thermostat and energy cut-out

d)

The level of the cold water feed/storage cistern