wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

PRO PRAC MOD- 2

Total questions: 22

Worksheet time: 11mins

Name
Class
Date
1.

cover a broad line of architectural services ranging from initial problem

identification to activities that would allow the Architect to initially conceptualize an array of

architectural and allied solutions.

a)

Pre-Design Services

b)

Design Services

c)

Special Architectural Services

d)

Construction Services

2.

The architect plays a vital role as the owners advisor or representative, interpreting their requirements ibto suitable spaces and forms.

a)

Pre-Design Services

b)

Design Services

c)

Special Architectural Services

d)

Construction Services

3.

Deal with a specific expertise for further enhancement of the architectural exterior and interior components.

a)

Pre-Design Services

b)

Design Services

c)

Special Architectural Services

d)

Construction Services

4.

The Architect and Specialist Consultants offer design services and inspection work. The Architect- in charge of construction (AICC) is responsible for construction supervision.

a)

Pre-Design Services

b)

Design Services

c)

Special Architectural Services

d)

Construction Services

5.

When a Client calls upon the Architect to give oral or written advice

a)

Feasibility Studies

b)

Pre-Feasibility Studies

c)

Consultation

d)

Site Selection Analysis

6.

Entails the formulation of site criteria

a)

Feasibility Studies

b)

Pre-Feasibility Studies

c)

Consultation

d)

Site Selection and Analysis

7.

Detailed analysis of the project based on pre-feasibility studies will determine the viability of a proposed development.

a)

Feasibility Studies

b)

Pre-Feasibility Studies

c)

Consultation

d)

Site Selection and Analysis

8.

Preliminary studies involve the procurement, analysis and use of secondary information gathered for the project

a)

Feasibility Studies

b)

Pre-Feasibility Studies

c)

Consultation

d)

Site Selection and Analysis

9.

Architect determines the adequate size and appropriate configuration and assemblage for a proposed project.

a)

Site Utilization and Land-Use Studies

b)

Architectural Research

c)

Architectural Programming

d)

Space Planning

10.

Analytical problem-seeking process will lead to the statement and identification of both horizontal and vertical requirements in offering a solution.

a)

Site Utilization and Land-Use Studies

b)

Architectural Research

c)

Architectural Programming

d)

Space Planning

11.

Entails the conduct of primary and secondary researches and assembled facts used as basis for conclusion.

a)

Site Utilization and Land-Use Studies

b)

Architectural Research

c)

Architectural Programming

d)

Space Planning

12.

Detailed analysis of the site involves the identification of a site’s development potentials through the proper utilization of land.

a)

Site Utilization and Land-Use Studies

b)

Architectural Research

c)

Architectural Programming

d)

Space Planning

13.

The Architect states the project terms of reference  including the concept, objectives and other necessary requirements to bid out architectural services

a)

Space Management Studies

b)

Value Management

c)

Design Brief Preparation

d)

Promotional Services

14.

Analysis of the space requirements of the project based on organizational structure and functional set-up.

a)

Space Management Studies

b)

Value Management

c)

Design Brief Preparation

d)

Promotional Services

15.

Applied in the cost management process to minimize the negative effect of simplified operations associated with many cost-reduction programs.

a)

Space Management Studies

b)

Value Management

c)

Design Brief Preparation

d)

Promotional Services

16.

Require promotional activities in order to develop and generate financial support and acceptance from governing agencies or from the general public.

a)

Space Management Studies

b)

Value Management

c)

Design Brief Preparation

d)

Promotional Services

17.

Most common method and the fee of the architect here varies depending on the classification of buildings, complexity of building requirements, construction value, construction contract and adjustments factors that constitute the extent of work to be performed by the Architect.

a)

Percentage of Project Construction Cost (PCC)

b)

Multiple of Direct Personnel Expenses

c)

Professional Fee Plus Expenses

d)

Lump Sum or Fixed Fee

e)

Per Diem, Honorarium Plus Reimbursable Expenses

18.

Frequently used where there is continuing relationship involving a series of Project. It establishes a fixed sum over and above the reimbursement for the Architect's technical time and overhead.

a)

Percentage of Project Construction Cost (PCC)

b)

Multiple of Direct Personnel Expenses

c)

Professional Fee Plus Expenses

d)

Lump Sum or Fixed Fee

e)

Per Diem, Honorarium Plus Reimbursable Expenses

19.

This method may be applied to government projects since they entail more paper work and time consuming efforts.

a)

Percentage of Project Construction Cost (PCC)

b)

Multiple of Direct Personnel Expenses

c)

Professional Fee Plus Expenses

d)

Lump Sum or Fixed Fee

e)

Per Diem, Honorarium Plus Reimbursable Expenses

20.

In some cases a Client may request an Architect to do work which will require his personal time.

a)

Percentage of Project Construction Cost (PCC)

b)

Multiple of Direct Personnel Expenses

c)

Professional Fee Plus Expenses

d)

Lump Sum or Fixed Fee

e)

Per Diem, Honorarium Plus Reimbursable Expenses

21.

The SPP provides for more than one method of compensation on a project. Each project should be examined to determine the most appropriate method of compensation.

a)

Mixed Methods of Compensation

b)

Multiple of Direct Personnel Expenses

c)

Professional Fee Plus Expenses

d)

Lump Sum or Fixed Fee

e)

Per Diem, Honorarium Plus Reimbursable Expenses

22.

Cost-based method of compensation is applicable only to non-creative work such as accounting, secretarial,reasearch, data gathering, preparation of reports and the like.

a)

Mixed Methods of Compensation

b)

Multiple of Direct Personnel Expenses

c)

Professional Fee Plus Expenses

d)

Lump Sum or Fixed Fee

e)

Per Diem, Honorarium Plus Reimbursable Expenses