QUIZ 1 PART 1 (COSH)

Total questions: 25

Worksheet time: 13mins

Name
Class
Date
1.

In demolition safety, this control is characterized by ensuring separation between the public and the demolition activities.

a)

Isolation

b)

Substitution

c)

Elimination

d)

Engineering control

2.

Which control is demonstrated by the use of power shears, in place of grinding or oxy-acetylene cutting, where there is a risk of fire?

a)

Isolation

b)

Engineering control

c)

Substitution

d)

Elimination

3.

Installation of scaffolds, platforms, guardrails, shoring and bracing to support loads are examples of this type of risk control.

a)

Engineering control

b)

Elimination

c)

Substitution

d)

Administrative control

4.

This type of risk control includes limiting the amount of time a person is exposed to a particular hazard, implementing safe working procedures for all hazardous tasks, and training all personnel.

a)

Administrative control

b)

Substitution

c)

Engineering control

d)

Elimination

5.

Primary cause of accident that is characterized by the human action that departs from a standard or written job procedure or common practice, safety rules, regulations, or instructions.

a)

Unsafe Act

b)

Safety Hazard

c)

Unsafe Condition

d)

Health Hazard

6.

The physical or chemical property of a material, machine or the environment which could result in injury to a person, damage or destruction to property or other forms of losses.

a)

Unsafe Act

b)

Safety Hazard

c)

Unsafe Condition

d)

Health Hazard

7.

A risk associated with poorly guarded or dangerous equipment and machinery that may cause injury.

a)

Health Hazard

b)

Unsafe Act

c)

Safety Hazard

d)

Unsafe Condition

8.

A risk associated with exposure to dangerous substance or conditions that may cause illness/disease.

a)

Unsafe Condition

b)

Health Hazard

c)

Safety Hazard

d)

Unsafe Act

9.

An engineering control or PPE set that protect you after you fall which is characterized by stopping the fall before you hit the surface like net/mesh and/or body harness.

a)

Fall alert system

b)

Fall arrest system

c)

Fall-proof system

d)

Fall protection system

10.

An engineering control or set of PPEs prevents you from falling like guardrails, covers, restraints, etc.

a)

Fall protection system

b)

Fall alert system

c)

Fall arrest system

d)

Fall-proof system

11.

In the OSH standard, workrooms shall be at least how many meters in height from the floor to the ceiling?

a)

3.0 m

b)

2.4 m

c)

2.7 m

d)

3.3 m

12.

Where the rooms are air-conditioned, and the process allows free movement; existing heights of not less than how many meters may be allowed?

a)

2.4 m

b)

3.3 m

c)

2.7 m

d)

3.0 m

13.

The maximum number of persons employed in a workroom area shall not exceed one person per how many cubic meters?

a)

10.5

b)

11.5

c)

13.5

d)

12.5

14.

The minimum width of passageways between machinery or equipment should not be less than how many meters?

a)

0.80

b)

0.60

c)

0.70

d)

0.90

15.

According to OSH standards, this shall be the minimum width of stairs (including handrails).

a)

0.90 m

b)

1.10 m

c)

1.00 m

d)

1.20 m

16.

What is the maximum clear height between sta

irway landings?

a)

3.9 m

b)

3.6 m

c)

3.3 m

d)

3.0 m

17.

According to OSH standard, headroom shall be provided at all points in the stairwell, what is the minimum vertical clearance from the top of the tread in line with the face of the riser?

a)

4.0 m

b)

3.0 m

c)

2.0 m

d)

1.0 m

18.

This is the minimum dimension of treads (exclusive of nosing and projections).

a)

35 cm

b)

30 cm

c)

25 cm

d)

20 cm

19.

The riser should have a maximum height of how many centimeters?

a)

35 cm

b)

30 cm

c)

25 cm

d)

20 cm

20.

In excavation safety, adequate shoring and timbering to prevent collapse shall be provided for excavation of depth more than how many meters?

a)

1.0

b)

0.95

c)

0.90

d)

0.85

21.

At what excavation depth should the services of a Structural engineer for the design of the excavation be required?

a)

Over 4.0 meters deep

b)

Over 4.6 meters deep

c)

Over 6.0 meters deel

d)

Over 6.6 meters deep

22.

Tools or materials shall be kept a minimum of how many meters away from the edge of the excavation to prevent them being knocked down into the excavation?

a)

1.0

b)

1.5

c)

2.5

d)

3.0

23.

At what minimum distance from a 9-meter-deep excavation should a vehicle or other machinery be driven, operated, or located (measured from the edge of the excavation)?

a)

1.0

b)

2.0

c)

3.0

d)

4.0

24.

Timber/bamboo scaffoldings shall be limited to a height of how many meters from the ground or base?

a)

25 m

b)

20 m

c)

15 m

d)

10 m

25.

Fall protection equipment shall be required when working at what minimum height?

a)

2.0 m

b)

3.0 m

c)

4.0 m

d)

5.0 m