M4 Principles of Site & Building Layout Trade Terms 38

Total questions: 38

Worksheet time: 19mins

Name
Class
Date
1.

A measuring device used with conventional leveling instruments. They are graduated in a variety of measurements and are made of two or more sections that can be adjusted to different lengths.

a)

Vernier

b)

Leveling Rod

c)

Tripod

d)

MSL

2.

Refers to a surface being perfectly vertical.

a)

Square

b)

True

c)

Plumb

d)

Level

3.

An elevation reference point created by the surveyor on or close to the property. Carpenters use this reference point when establishing or transferring elevation on a site or building.

a)

Foresight

b)

Control Point

c)

Backsight

d)

Benchmark

4.

A concept for right triangles stating that the sum of the squares of the legs of a right triangle is equal to the square of the hypotenuse. It is expressed mathematically as a2 + b2 = c2.

a)

Pythagorean Theorem

b)

Optical Theodolites

c)

Digital Theodolites

d)

EDMI

5.

The direction indicated on construction drawings that shows how property lines and buildings are positioned on a site relative to compass or magnetic north.

a)

True North

b)

Plan North

c)

Hypotenuse

d)

Setback

6.

A line beginning at one point and ending at another point.

a)

Level Line of Sight

b)

Contour Line

c)

Line Segment

d)

Property Line

7.

Drawings that show the location of the building on the site from an overhead view, including contours, trees, construction features, and dimensions.

a)

Simple Plan

b)

Structural Plan

c)

Foundation Plan

d)

Civil Plan

8.

Based on the Pythagorean Theorem, this rule refers to the relative lengths of the sides of a right triangle.

a)

3-4-5- Rule

b)

Engineer Rule

c)

Architect Rule

d)

Hypotenuse

9.

A set of lines, typically horizontal and vertical, placed in a telescope used for sighting purposes. The lines meet in the center of the telescope.

a)

Backsight

b)

Height of Instrument

c)

Level Line of Sight

d)

Crosshairs

10.

An older-style level made from a length of clear flexible tubing filled with water. This type of level is typically used with graduated measuring rods.

a)

Builder's Level

b)

Water Level

c)

Laser Level

d)

Spirit Level

11.

The minimum distance, as required by regulatory authorities, between a property line and building lines.

a)

Vernier

b)

Easement

c)

Setback

d)

Control Point

12.

A set of engineered drawings depicting the physical structure and components comprising the structure of a project.

a)

Structural plans

b)

Foundation plans

c)

Civil Plans

d)

As-Built Plans

13.

Drawings that show the design of the project.

a)

Structural Plans

b)

Foundation Plans

c)

Civil Plans

d)

Architectural Plans

14.

The average height of the surface of the ocean.

a)

EDMI

b)

DMS

c)

MSL

d)

LPS

15.

The elevation of the line of sight of the telescope relative to a known elevation. Determined by adding the backsight elevation to the known elevation.

a)

Level Line of Sight

b)

Height of instrument

c)

Control Point

d)

Property Monument

16.

A measurement of how much the ground varies from horizontal.

a)

Slope

b)

Grading

c)

Setback

d)

Hypotenuse

17.

Specific points created on the site, where they are used as elevation and dimension reference points during site and building layout.

a)

Property Monument

b)

Contour Lines

c)

Control Points

d)

Property Lines

18.

The recorded legal boundaries of a piece of property.

a)

Power Lines

b)

Property Lines

c)

Grid Lines

d)

Break Lines

19.

The longest side of a right triangle. It is always opposite from the right angle.

a)

Adjacent

b)

Bisect

c)

Base Line

d)

Hypotenuse

20.

Angles that are perpendicular to one another, meaning they measure 90 degrees.

a)

True

b)

True North

c)

Plan North

d)

Plumb

21.

Markers used in surveying projects to designate grade or location information such as property boundaries, building corners, setbacks, and elevations.

a)

Property Stakes

b)

Yard Stakes

c)

Grade Stakes

d)

Surveyor Stakes

22.

A corner that is exactly 90 degrees.

a)

Cube

b)

Square

c)

Triangle

d)

Circle

23.

Sometimes referred to as an optical level, this instrument is used to check, establish, and transfer grades and elevations. It is also used to set up level points over long distances.

a)

Spirit Level

b)

Builder’s Level

c)

Water Level

d)

Laser Level

24.

A direction indicated on construction drawings that typically refers to the top of the page. 

a)

True North

b)

Site North

c)

Plan North

d)

Slope North

25.

A reading taken on a leveling rod held on a point in order to determine a new elevation.

a)

Foresight

b)

Backsight

c)

Hindsight

d)

Optical Sight

26.

Imaginary lines on a site plan that connect points of the same elevation. Contour lines never cross each other.

a)

Contour Lines

b)

Sight Lines

c)

Property Lines

d)

Grid Lines

27.

A short auxiliary scale set parallel to a primary scale.

a)

Hypotenuse

b)

Theodolites

c)

Micrometers

d)

Vernier

28.

A reading taken on a leveling rod held on a point of known elevation to determine the height of the leveling instruments.

a)

Laser Sight

b)

Foresight

c)

Backsight

d)

Control Sight

29.

The process of adjusting the slope or elevation of soil prior to and during building construction.

a)

Marking

b)

Grading

c)

Shading

d)

Surveying

30.

A drawing that identifies footing types and specifies the location and elevation of a building’s foundation.

a)

Civil Plan

b)

Structural Plan

c)

Foundation Plan

d)

Mechanical Plan

31.

This refers to a line that is perpendicular to the plumb only at one point on a line. This type of line does not follow the curve of the Earth.

a)

Level Line of Sight

b)

Builder's Line of Sight

c)

Architect's Line of Sight

d)

Homeowner's Line of Sight

32.

A designated boundary line beyond which a building cannot extend. This line may not cross property lines and typically prevents buildings from being too close to a street or municipal property.

a)

Level Line

b)

Building Line

c)

Property Line

d)

Contour Line

33.

Permissible variations from a standard or specification.

a)

Tolerances

b)

Whoopsie

c)

My Bad

d)

Variable

34.

Refers to a surface being perfectly horizontal.

a)

Square

b)

Lazy

c)

Plumb

d)

Level

35.

A legal right-of-way provision on another person’s property. A property owner cannot build on an area where an easement has been located.

a)

String Line

b)

Easement

c)

Setback

d)

Property Line

36.

Also known as the dot laser, this instrument replaces older style plumb bobs by using lasers to project dots either vertically, horizontally, or at right angles to each other.

a)

Laser Plumb

b)

Level Plumb

c)

Plumbers

d)

Plumb Bob

37.

Angles formed by two lines or rays that measure exactly 90 degrees. A triangle that has a right angle is known as a right triangle. 

a)

Acute Angles

b)

Adjacent Angles

c)

Right Angles

d)

Opposite Angles

38.

Physical structure that marks the location of critical survey points.

a)

Castillo de San Marcos Monument

b)

Property Monument

c)

Washington Monument

d)

Fort Matanzas National Monument