wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Standard Fees, Contracts, Obligations

Total questions: 25

Worksheet time: 43mins

Name
Class
Date
1.

These are moral principles that govern behavior.

a)

Ethics

b)

Code of Ethics

c)

Morality

d)

Values

2.

The official file for Interior Designers that shows the guidelines for standard fees and contract agreement.

a)

Document 5

b)

Code of Ethics

c)

Document 6

d)

Contracts & Obligations

3.

The minimum fee for a 36sqm. condominium unit.

a)

50,000

b)

36,000

c)

1000/sqm

d)

1500/sqm

4.

The maximum fee for a consultation on an hourly basis.

a)

1500

b)

2000

c)

1000

d)

2500

5.

Justin Bieber commissioned IDr. Xander to redesign his 75sqm. master's bedroom and turn it into a recording studio in his 300sqm. house. How much is the minimum amount of IDr. Xander's professional service?

a)

50,000

b)

75,000

c)

400/sqm.

d)

1000/sqm.

6.

How much is the fee based on a percentage basis where cost will depend on the prevailing market rate per sqm?

a)

10%

b)

15%

c)

10-15%

d)

20%

7.

This amounts to the fee an IDr. receives upon the contract signing of the project.

a)

12% of the total

b)

15% of the total

c)

10% of the total

d)

5% of the total

8.

IDr. Julienne Nicole D. Dominguez has completed the 2nd design phase of her 450sqm. mega Japanese restaurant project. How much will she receive from her client assuming that her fee is 750/sqm?

a)

Php 118,125

b)

Php 120,125

c)

Php 120,000

d)

Php 118,000

9.

There are some delays in the project that is yet to award a contractor. IDr. MaKaThe De Leon, as the designer of the project, passed her complete FF&E and Budgetary Cost Estimate to her client. How much is she entitled to receive?

a)

20% of the total

b)

50% of the total

c)

100%,since she is only hired to design.

d)

0 because she has not found a contractor yet.

10.

IDr. Waldine concluded the 1st design phase with his client. The project is a 175 sqm. office in Pasig. His professional fee is 1000/sqm. Since this is the 1st design phase, it will require 20% of his total professional fee. What is the next design phase?

a)

20% of the total

b)

Contract Document & Coordination Phase

c)

10% of the total

d)

Design Development Phase

11.

A rule of conduct, just, obligatory, and laid down by a legitimate power for common observance and benefit.

a)

Law

b)

Constitution

c)

Legislation

d)

Contracts

12.

It is a division of law based on what is acceptable to society.

a)

Moral Law

b)

Positive Law

c)

Ethical Law

d)

Natural Law

13.

The obligee or the one who can compel compliance with the obligation.

a)

Active Subject

b)

Passive Subject

c)

Efficient Cause

d)

Prestation

14.

Binds or connects the parties to the obligation. This comes in the form of a contract for Interior Design projects.

a)

Active Subject

b)

Passive Subject

c)

Efficient Cause

d)

Prestation

15.

Amongst the elements of obligations, the project serves as the...?

a)

Active Subject

b)

Passive Subject

c)

Efficient Cause

d)

Prestation

16.

Ethical standards are alike standards of law.

a)

True

b)

False

17.

Everything unethical is also unlawful.

a)

True

b)

False

18.

It is okay for IDr. Veralee to present initial sketches on the first meeting with her potential client.

a)

True

b)

False

19.

A contract is not necessarily needed on the first meeting with a prospective client.

a)

True

b)

False

20.

There's no issue with copying Document 6 word for word.

a)

True

b)

False

21.

For fees based on a percentage basis, a higher construction cost will account to a smaller percentage for professional Interior Design fees.

a)

True

b)

False

22.

Any third person who induces another to violate his contract shall be liable for damages to the other contracting party.

a)

True

b)

False

23.

You can have an oral contract, meaning nothing is written on paper.

a)

True

b)

False

24.

The delay on the part of the creditor to accept the performance of the obligation.

a)

Mora Acccipiendi

b)

Compensation Morae

25.

IDr. Jubi submitted the working drawings to Mr. Incredibles even if it lacked the floor pattern layout. He accepted the submission and instructed her to proceed with the next steps to avoid timeline delays. Once the next and final phase was done and paid for, the project was postponed due to unforeseen circumstances.

3 months later, the construction started with a new designer as Project Manager. Now, Mr. Incredibles is asking IDr. Jubi for the floor pattern layout or else he will sue her to get his money back. Who is at fault here?

a)

IDr. Jubi

b)

Mr. Incredibles