Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Apttus Quote Booking Quiz

Total questions: 25

Worksheet time: 13mins

Name
Class
Date
1.

What should be checked to ensure the DSR is correct and complete when booking an Apttus Quote?

a)

The quote has the correct partners and no high level item with quantity higher than 1

b)

The SPO0s are correct and have the support document

c)

Philips personnel, PO number and PO date are copied from the DSR

d)

The quote version is searched by the quote number in Salesforce

2.

When booking an Apttus Quote, what is necessary to verify about the quote version?

a)

It must have a quantity higher than 1

b)

It must be searched by the quote number in Salesforce

c)

It must have the correct support document if required

d)

It must have the correct partners

3.

What is required for the SPO0s when booking an Apttus Quote?

a)

They must be searched by the quote number in Salesforce

b)

They must have a quantity higher than 1

c)

They must be correct and have the support document if required

d)

They must have the correct partners

4.

What is a condition for the quote regarding high level items when booking an Apttus Quote?

a)

It must have a quantity of 1 for each high level item

b)

It must have no high level item with quantity higher than 1

c)

It must have all high level items with quantity higher than 1

d)

It must have the correct partners for high level items

5.

Why must the device lines for ultrasound equipment be separated in a quote for the US market?

a)

Because each equipment can have multiple quantities.

b)

Because each equipment has multiple Site IDs and serial numbers.

c)

Because each equipment has one Site ID and one serial number, and the quantity cannot be higher than 1.

d)

Because it is easier to track the equipment this way.

6.

What must be done when an AM quote comes with configuration mistakes that make it impossible for the Order Booking process to book the order?

a)

Ignore the mistakes and proceed with the order.

b)

Create a new version of the quote and fix the configuration.

c)

Cancel the order entirely.

d)

Request the customer to fix the mistakes.

7.

Which statement is true about SP059D?

a)

It should be booked as "Admin Fee"

b)

It requires a Trade-In Request (TIR) on Salesforce

c)

It does not generate commission

d)

It requires approval by Elaine Persico

8.

What is SP_DEMO used for?

a)

To quote demo sell equipment

b)

To book Services, 3rd Party Items, Trade-in requests

c)

To provide an extended warranty

d)

To replace the demo material informed at the Demo Availability Confirmation

9.

What is the first step in updating the correct partner accounts on an Apttus quote?

a)

Click on the magnified glass for the account to change

b)

Go to the partner functions accounts section

c)

Choose any of the following fields to enter data

d)

Click on search button

10.

Which country should always be entered as 'CA' in the Apttus quote update process?

a)

United States

b)

Australia

c)

Canada

d)

United Kingdom

11.

When searching for an account during the Apttus quote update process, what is recommended to use?

a)

Account number

b)

CPQ MP1 Customer ID

c)

Country

d)

Account name or account number

12.

What should you do if the proposal has already been sent to the customer for a new version of the quote?

a)

Select No

b)

Select Yes

c)

Click on "Accept"

d)

Click on "Cancel"

13.

What is the status of the quote after clicking on "Accept"?

a)

Sent to Customer

b)

Accepted

c)

Generated

d)

Present

14.

What action should be taken to change the quote status to "Accepted"?

a)

Click on "Reject"

b)

Scroll down to accept button and click it

c)

Click on "Generate CFD"

d)

Click on "Configure Products"

15.

What is the last part of the process for the quote once it has been approved?

a)

Clicking on the "PO Received" button

b)

Sending an email confirmation

c)

Printing the quote

d)

Creating a new quote

16.

What happens when you click on the "PO Received" button?

a)

The quote is deleted

b)

The quote is sent to the customer

c)

The quote moves to "PO received" status

d)

The quote is archived for future reference

17.

After updating the quote status to "PO Received," what should you do next according to the process described?

a)

Go back to the DSR and change "Sales Order DSR Status" to "Bookable"

b)

Close the quote and start a new one

c)

Notify the team about the status change

d)

Wait for further instructions

18.

What must an AM or Sales Specialist indicate when processing Ultrasound Upgrade Orders?

a)

Customer name and address

b)

Site ID or Serial Number and software level of the system being upgraded

c)

Warranty period and service contract details

d)

Installation date and technician name

19.

Which SAP transaction is used to find the Site ID or Serial Number using the other information?

a)

SAP ZUCA

b)

SAP ZETA

c)

SAP ALPHA

d)

SAP DELTA

20.

Where should the upgrade description and Site ID be added in the order process?

a)

At the configuration of the equipment

b)

At the Chapter line

c)

In the special instructions section

d)

In the customer notes

21.

Where must the Serial Number and the software level be added when processing an upgrade order?

a)

At the Chapter line

b)

At the customer notes

c)

At the configuration of the equipment

d)

In the special instructions section

22.

What is required for an Ultrasound Maximizer Order to be entitled to a customer as part of a Service Contract?

a)

The Service Contract must be expired

b)

No Service Contract is needed

c)

The Service Contract must be indicated at the DSR or at the ZUCA transaction and must be valid

d)

A PO (Purchase Order) from the customer

23.

What is required in terms of quoting for an Ultrasound Maximizer Order?

a)

A full price Apttus quote is required

b)

A zero dollars Apttus quote is required

c)

No quote is needed

d)

A discounted Apttus quote is required

24.

How many documents must be provided for Third-Party Leasing according to the material?

a)

1 document

b)

2 documents

c)

3 documents

d)

4 documents

25.

What is the Billing plan for Leasing always set to?

a)

10/10/80

b)

0/0/100

c)

20/20/60

d)

30/30/40