Total questions: 25
Worksheet time: 13mins
Name
Class
Date
1.
A beam which is rigidly fixed at one end and free at the other end is called :
a)
Simply supported beam
b)
Overhanging beam
c)
Cantilever beam
d)
Built in beam
2.
The ratio between the ultimate stress and the working stress is termed as
a)
Shear stress
b)
Tensile stress
c)
Factor of safety
d)
Compressive stress
3.
According to Indian Standard Specifications, the full strength of concrete is achieved after
a)
7 days
b)
14 days
c)
28 days
d)
21 days
4.
The concrete as per BIS 456 – 1978 is designated in______ grades namely M15, M20 etc.
a)
8
b)
5
c)
6
d)
7
5.
What is the measuring unit for cornice ?
a)
Meter
b)
Centimeter
c)
Sq. meter
d)
Cu.meter
6.
While specifying for earth work in foundation trenches, drains etc. the initial lift is taken as :
a)
1.20 m
b)
2 m
c)
1.00 m
d)
1.50 m
7.
A train having a length of 150 m is moving with a velocity of 10 m/sec. How much time it will take to cross a bridge of length 100 m ?
a)
15 sec
b)
10 sec
c)
25 sec
d)
20 sec
8.
One joule = _________Ergs.
a)
105
b)
106
c)
108
d)
107
9.
The process of proper and accurate measurement of concrete ingredients on the basis of either weight or volume, for uniformity of concrete mix is known as
a)
Mixing
b)
Consolidation
c)
Curing
d)
Batching
10.
According to ISI the strength of concrete is achieved after
a)
7 days
b)
10 days
c)
21 days
d)
28 days
11.
The standard length of a rail for broad gauge is-------metre.
a)
1.64
b)
13
c)
1
d)
1.5
12.
The granular materials of crushed stone provided under and around the sleepers is known as
a)
Railway track
b)
Ballast
c)
Balluster
d)
Gauge
13.
The finished top width of earth work in fill or cut for receiving the road structure is
a)
Formation width
b)
Cutback
c)
Drive way
d)
Truck way
14.
The head quarter of Indian road congress is at
a)
Mumbai
b)
Kolkata
c)
Madras
d)
New Delhi
15.
What is the first watering before sowing the crop?
a)
watering
b)
Paleo
c)
Delta
d)
Duty
16.
Which is called safety valve of a dam?
a)
Drainage gallery
b)
Inspection gallery
c)
Spill way
d)
Outlet sluices
17.
Full form of GPS :
a)
Global Position Satellites
b)
Global Positioning System
c)
Great Position System
d)
Grand Position System
18.
How long does it take a GPS satellite to orbit the earth?
a)
2 hours
b)
8 hours
c)
12 hours
d)
24 hours
19.
The projection of a line in a traverse on a line perpendicular to the meridian is known as:
a)
Latitude of the line
b)
Departure of the line
c)
Bearing of the line
d)
Co-ordinate of the line
20.
The backsight reading on a bench-mark of reduced level 100.00 is 1.745. If foresight reading on the point is 0.820, the reduced level of the point is
a)
101.32
b)
98.285
c)
100.925
d)
104.68
21.
The determines the size of the theodolite.
a)
Diameter of the lower plate
b)
Radius of lower plate
c)
Vertical circle
d)
Upper plate
22.
The size of the letter is described by it
a)
Width
b)
Height
c)
Shape
d)
None of them
23.
The line connecting a view to a note is called a
a)
Guide line
b)
Outline
c)
Leader line
d)
Centre line
24.
The curve generated by a point on the circumference of a circle rolling along a straight line is called a
a)
Hyperbola
b)
Cycloid
c)
Parabola
d)
Epicycloid
25.
Which masonry has regular stones of square or rectangular shape with accurate bed joints?
a)
Coursed rubble masonry
b)
Uncoursed rubble masonry
c)
Ashlar fine masonry
d)
Random rubble masonry