wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Q3 Codes Training

Total questions: 34

Worksheet time: 32mins

Name
Class
Date
1.

Which of these field storage locations is NOT authorized for a CCV?

a)

PT Van at a LF

b)

Topside at a MAF

c)

Inside the LCC

d)

Inside the LER

2.

A CL-DTU is improperly field stored at M02. Which of the following teams are authorized to PEN the site?

a)

XX

b)

BB

c)

TPC

d)

AA

3.

What is the control of uninstalled TDIs?

a)

2 US Military

b)

TPC

c)

2 US Military w/ SECRET Clearance

d)

No special control

4.

The CSD(M) is an electro-mechanical stepping decoder located on top of the missile’s ________ stage.

a)

First

b)

Second

c)

Third

d)

Fourth

5.

Where is the LF unique enable code stored at the LF?

a)

KS-60

b)

P-Plug

c)

CSD(M)

d)

MGS

6.

T/F: A critical component is defined as any component that, if by-passed, activated, or tampered with, could result in or contribute to unauthorized deliberate or inadvertent pre-arming, arming, launching, or release of a nuclear weapon; the launching of a combat delivery vehicle carrying a nuclear weapon; or the delivery of a nuclear weapon to other than its planned target.

a)

True

b)

False

7.

The purpose of TPC is to ____________________.

a)

Enforce No Lone Zone security requirements

b)

Allow a lone individual access to nuclear weapons, weapon systems or critical components

c)

Ensure that miscellaneous components are never left alone and that access for tampering is impossible.

d)

Ensure that a lone individual is denied access to nuclear weapons, weapon systems or critical components, never allowing the opportunity for tampering, damage, or an unauthorized act to go undetected

8.

While lowering equipment into the LER, EMT accidentally drops the DTU 15 feet on top of the B-Plug. When they pick it up, they hear a rattling noise inside. This would be reported as a _______.

a)

PCC

b)

PV

c)

CRE

d)

No report is required.

9.

What report(s) would be made for breakage to all TDIs on an LCP for an unknown reason?

a)

PV

b)

PCC

c)

PCTT

d)

CRE

10.

EMT has completed a KS60 swap at J05. What codes related post-maintenance actions do you have?

a)

RDCC

b)

RDCK

c)

Both RDCC and RDCK

d)

None

11.

T/F: EMT has completed a KS60 swap at B01. The MCC must complete the Local Key Switchover command as part of their post-maintenance actions.

a)

True

b)

False

12.

EMT has completed an MGS R&R at N04. What codes related post-maintenance actions do you have?

a)

RDCC

b)

RDCK

c)

Both RDCC and RDCK

d)

None

13.

T/F: Codes are sent before keys.

a)

True

b)

False

14.

A01 has removed the TDIs from the deputy VCP to prepare for VCP maintenance. What capsule(s) are required to stay awake?

a)

10MS AOR

b)

A01

c)

341MW

d)

No one

15.

Where are TDIs authorized to be stored?

a)

SAS Container

b)

Codes Case

c)

TDI binder

d)

"Returns" Bin

16.

When are TDIs required to be inspected?

a)

Every changeover

b)

After installation

c)

Suspected or actual damage

d)

Annually by OSB

17.

Two Group A code handlers are installing a P-Plug. They accidentally drop it and the cover comes off allowing one handler to view the coded portion of the P-plug. What, if anything, must be declared?

a)

PV

b)

PCC

c)

PCTT

d)

Nothing, the P-Plug doesn't contain a code

18.

An EMT team is controlling a LFLCD-coded DTU.  One of the members falls asleep while riding down Interstate 15 while the other partner maintains control of the DTU.  What, if anything, must be declared?

a)

PV

b)

CRE

c)

PCC

d)

Nothing, this is an acceptable situation

19.

The MGS at B07 has failed local overwrite following an upload of a PEN D via DTU (MGS is now unlocked). What team must be present to observe SRAM battery disconnect?

a)

Two Group A Code Handlers

b)

Two Group B Code Handler

c)

Two-Person Concept Team

d)

Two Officer Code Handlers

20.

Field storage procedures will be implemented whenever the code handling team __________

a)

Has properly installed the code

b)

Returned the code to OSB codes vault

c)

Can field transfer the code to another qualified team

d)

Cannot maintain visual observation and the code is not properly installed.

21.

What is the control for installed TDIs?

a)

Two US Military

b)

TPC

c)

One maintenance officer

d)

One awake MCCM while the other is in rest (blast door closed)

22.

What must be reported for a team not notifying Codes of a field transfer?

a)

PV

b)

PCC

c)

PCTT

d)

Nothing, this is an acceptable situation

23.

What is the minimum requirement to penetrate an LF where the CSD(M) is operationally coded? The missile is in the launcher.

a)

XX

b)

TPC

c)

AA

d)

BB

24.

Who must be notified if a field transfer is needed?

a)

OSB

b)

MMOC

c)

MCC

d)

All the above

25.

T/F: Crew rest will be terminated for TDIs being removed for a known reason.

a)

True

b)

False

26.

What is the proper minimum team required to penetrate a site where code components are properly field stored?

a)

any TPC team

b)

AA

c)

BB

d)

Any TPC team not of the opposite control group

27.

Who must stay awake if a team carrying TDIs to A01 loses them?

a)

A01 MCC

b)

All squadron LCCs

c)

All A side LCCs

d)

All wing LCCs

28.

After an attempt to code a CSD(M) at A05, EMT receives a bad VN. Who must be the last team to exit and the first team to penetrate A05?

a)

Two Officer

b)

AA

c)

BB

d)

TPC

29.

The MCCC and the FSC are controlling entry to the evacuated LCC. The relieving MCC arrives on site and field transfers 5 TDIs to the MCCC and FSC while the MCC has lunch. What, if anything, must be reported?

a)

PV

b)

PCC

c)

PCTT

d)

No report required, this is an acceptable situation

30.

With the blast door closed, TDIs satisfy ___________ in the LCC while the other MCCM sleeps.

a)

TPC

b)

Security and saftey

c)

One awake MCCM

d)

2 US Military

31.

EMT has completed a KS60 swap at C01. What key is pushed to the active position upon completion of the Local Switchover Command?

a)

ITK

b)

BS/L

c)

HICS

d)

All the above

32.

How long must TDIs cure for to meet installation requirements?

a)

10 minutes

b)

15 minutes

c)

20 minutes

d)

25 minutes

33.

The MG at M01 caught fire and the MCC had to conduct Boldface and evacuate. A fire fighting team arrived on site and entered the LCC prior to the MCC's. What report, if any, are required?

a)

PV

b)

PCTT

c)

PCC

d)

No report. This is an acceptable situation.

34.

Which key is protected by a KEKI?

a)

REK

b)

HICS

c)

ITK

d)

BS/L