Construction Industry Quiz

Total questions: 25

Worksheet time: 38mins

Name
Class
Date
1.

Who is responsible for converting clients’ ideas and requirements into a building design?

a)

Contractor

b)

Engineer

c)

Architect

d)

Surveyor

2.

A variation order can be signed by which one of the following?

a)

Clerk of works

b)

Project manager

c)

Site supervisor

d)

Architect

3.

Who ensures compliance with Health and Safety legislation on site?

a)

Site manager

b)

HSE inspector

c)

Project manager

d)

Contractor

4.

Which regulation specifies what is considered good practice in the trade area?

a)

Building Regulations

b)

Health and Safety at Work Act

c)

Approved Codes of Practice

d)

Construction Design and Management Regulations

5.

What is the main role of the electrical inspector?

a)

Design electrical systems

b)

Inspect new electrical installations for compliance

c)

Install electrical wiring

d)

Maintain electrical equipment

6.

What does the building services engineer do?

a)

Manages construction projects

b)

Designs internal services such as heating, plumbing, and electrical distribution

c)

Supervises construction workers

d)

Conducts site surveys

7.

Which of the following is a reason for following manufacturer’s instructions?

a)

To save time

b)

To ensure safety

c)

To reduce costs

d)

To increase productivity

8.

What is the importance of presenting a good quality image?

a)

It attracts more clients

b)

It portrays professionalism and reliability

c)

It increases project costs

d)

It speeds up project completion

9.

Who will visit the site on behalf of the local authority to confirm that the Building Regulations are being observed?

a)

Site manager

b)

Building control officer

c)

Project manager

d)

Health and safety officer

10.

Who is responsible for sourcing all the materials needed to complete a project?

a)

Project manager

b)

Buyer

c)

Building control officer

11.

British Standards are the primary source of information for building service engineers.

a)

True

b)

False

12.

Poor time keeping and bad attitude can harm a company's reputation.

a)

True

b)

False

13.

Verbal communication is used daily to confirm issues that have already been agreed upon.

a)

True

b)

False

14.

All official communication should be in writing to ensure clarity.

a)

True

b)

False

15.

The main contractor resolves installation problems for subcontractors.

a)

True

b)

False

16.

What are the four main regulations that building service engineers have to follow?

4 lines
17.

Describe the term ‘mandatory’.

4 lines
18.

What are the consequences of not following manufacturer’s instructions?

4 lines
19.

What are the main roles of the water inspector?

4 lines
20.

List some poor practices that can give a company a bad name.

4 lines
21.

Explain why it is important to treat customers well.

4 lines
22.

Describe the difference between the role of the buyer and the estimator.

4 lines
23.

When should communication with customers be in writing?

4 lines
24.

What actions should you take if a customer is unhappy with your recommended position for a heater?

4 lines
25.

What does it mean to take ‘responsibility’ for a job?

4 lines