wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Oversee and Design Mock Paper A

Total questions: 70

Worksheet time: 38mins

Name
Class
Date
1.

When explaining installation details to colleagues it is important to make sure that

a)

colleagues are tested about their understanding

b)

technical terms are used constantly

c)

instructions are clear and thorough

d)

colleagues are given a copy of the installation specification

2.

What is the internal insulating medium (material) in a M.I cable?

a)

manganese oxide

b)

magnesium oxate

c)

manganese dioxide

d)

magnesium oxide

3.

An ECS (Electrotechnical Certification Scheme) card is valid for how many years?

a)

10

b)

1

c)

5

d)

3

4.

Which one of the following cable system is used for underground supply cables in older installations?

a)

SWA

b)

XLPE (Cross-Linked Poly Ethylene)

c)

PILC (Paper-insulated, Lead clad)

d)

PVC/PVC

5.

Due to bad weather conditions, your company has not been able to complete the outside work by the agreed date. This could lead to

a)

the outside work being completed after the client has moved in

b)

the job completion being delayed

c)

your company requesting a variation order so that the work can be completed

d)

cancellation of all outside works

6.

Which one of the following cable systems provides some heat and chemical-proofing properties?

a)

SWA

b)

PILC

c)

PVC/PVC

d)

XLP

7.

A variation order to install additional outlets will be issued by the

a)

client

b)

sub - contractor

c)

site manager

d)

contractor

8.

Why is cable tray NOT to be used as an 'earthing conductor'?

a)

because cable tray cannot conduct electricity

b)

because electrical continuity cannot be guaranteed

c)

cable tray CAN be used as an earthing conductor

d)

because electrical insulation cannot be guaranteed

9.

Which document details the number and types of components that are needed for a project?

a)

gant chart

b)

material schedule (specification)

c)

quotation

d)

site report

10.

Which ONE of the following sites has to meet the specific requirements of special 'codes of practice'?

a)

petrol stations

b)

agriculture/horticultural installations

c)

construction sites

d)

caravans and caravan parks

11.

A project is scheduled to take 160 person hours for completion. If the working day is 8 hours, what is the minimum number of staff required to complete the project within 10 days?

a)

4

b)

2

c)

3

d)

1

12.

BS7671:2018 defines the colours of electrical conductors. What is the colour defined for a protective conductor?

a)

yellow

b)

brown

c)

green and yellow

d)

green

13.

Identify the correct pieces of equipment that can be used to detect insulation leakage.

a)

tong tester

b)

phase sequence tester

c)

continuity tester

d)

voltage inductor

e)

insulation resistance tester

14.

Identify the correct pieces of equipment that can be used to measure the resistance of conductors

a)

tong tester

b)

insulation resistance tester

c)

phase sequence tester

d)

voltage inductor

e)

continuity tester

15.

Before starting any installation work, it is essential to first -

a)

identify the location of the site office

b)

identify the start and finish times

c)

identify any potential hazards

d)

identify the name of the 'clerk of works'

16.

What check is made to ensure enough accessories have been delivered to site?

a)

check delivery note against installation specification

b)

ask the supervisor whether the delivery is correct

c)

make a visual check with a colleague

d)

check delivery note against items delivered

17.

What is the preferred way of reducing excessive voltage drop in a circuit?

a)

reduce the size of the load

b)

increased cable CSA

c)

increased cable length

d)

reduced voltage

18.

What must be kept near any combustible materials?

a)

material guidance notes

b)

an alarm

c)

a fire extinguisher

d)

a bucket of sand

19.

Which ONE of the following systems of earthing uses the 'general mass of earth' as the earthing conductor?

a)

TT

b)

TN-C

c)

TN-S

d)

TN-C-S

20.

Which of these is the most appropriate method for storing conduit?

a)

In piles

b)

On racking

c)

Flat on the ground

d)

Placed against a wall

21.

BS7671:2018 wiring regulations do not 'normally' apply to which ONE of the following types of electrical equipment?

a)

rotating machines

b)

railway track signals

c)

fire alarm systems

d)

emergency lighting

22.

British Standards were introduced to

a)

Ensure that all work carried out anywhere in the UK is completed to the same high standard

b)

Check that all people working in electrical installations are suitably qualified

c)

Check that all people working on electrical installations are resident in the UK

d)

Ensure that manufacturers only use products made in the UK

23.

What protective device provides the function of a residual current device with a circuit breaker, in the same enclosure?

a)

RCD

b)

RCBO

c)

MCB

d)

MCCB

24.

When installing an electrical appliance, what document should be followed?

a)

The site drawings

b)

The manufacturer’s instructions

c)

The wiring diagram

d)

The technical data

25.

What may occur if excessive PVC cement is used when joining PVC conduit?

a)

The joint will be weak

b)

A barrier may form within the joint

c)

The joint will take a long time to set

d)

The PVC may 'degrade'

26.

After checking a work area it may be necessary to make the area safe before starting work and also during work activities so it may be necessary to

a)

Use barriers or tapes to section off possible hazards

b)

Use barriers or tapes to section off possible hazards

c)

Remember where the hazards are located

d)

Start work immediately and deal with the hazards as they arise

e)

Show everyone on the site where the hazards are

27.

A document laying out the work procedure and sequence of operation is a

a)

Site plan

b)

Safe isolation procedure

c)

Risk assessment

d)

Method statement

28.

It is important to check the condition of equipment for pre-existing damage as the contractor’s employee could be made liable for any damage whilst work is in progress. This check is best carried out by

a)

The contractor responsible for the installation and a representative of the customer so that any pre-existing damage can be noted

b)

Insurance representatives from both parties so that any damage can be agreed prior to any claims for compensation

c)

The contractor responsible for the installation so that any pre-existing damage can be noted

d)

The customer, so that there will be a record of any damage prior to the work starting

29.

A suitable method of checking premises for any existing damage is to do a

a)

Polarity test

b)

Periodic inspection

c)

Visual inspection

d)

Insulation resistance test

30.

Whilst carrying out electrical work some existing damage to a wall was found close to where a power socket is to be installed. What is the best action to take?

a)

Ensure that the contractor has insurance in case the client sues the installer

b)

Record and photograph the damage and inform the client before work begins

c)

Ensure that the client has insurance so that a claim can be made immediately

d)

Inform the client when the work is complete to explain the extra costs

31.

Using table F3 of the On-Site Guide what is the de-rating factor if a group of 3 circuits are installed on a single layer on wall or floor? (abbreviation for the grouping factor is: Cg)

a)

0.70

b)

0.82

c)

0.80

d)

0.79

32.

Before starting any installation work, steps must be taken to protect the structure and fabric of the site. This is best done by

a)

Taking no legal responsibility if anything is damaged and completing work as normal

b)

Trying not to damage any property whilst working but reporting any damage caused

c)

Using a safe secure area to store all moveable fixtures and fittings and protecting all other equipment with suitable covers to keep off dirt and debris

d)

Moving as much equipment as possible to a corner of the room so there is a clear area to work and then reinstall it after the work is finished

33.

A flat twin cable with bare protective conductor and white outer insulation is commonly regarded as which cable type?

a)

Thermosetting cable with low smoke and fumes properties (LSF)

b)

Thermosetting cable without low smoke and fumes properties (LSF)

c)

Thermoplastic cable with low smoke and fumes properties (LSF)

d)

Thermoplastic cable without low smoke and fumes properties (LSF)

34.

Label the parts of this cable used when supplying a three phase and neutral distribution board.

4 lines
35.

The image shown is a cable used for data transmission and;

a)

Is known as braided flexible cable and is capable of data transmission speeds up to one gigabyte per second

b)

Is also called coaxial cable containing four twisting pair cables within one jacket

c)

Is often referred to as optical fibre cable since it is made from optical quality plastic

d)

Is known as Cat 5 cable containing four twisting pair cables within one jacket

36.

The main advantage of this containment system is that it;

a)

Allows multiple circuits to be carried

b)

Can be pre-wired

c)

Is for external use only

d)

Is cheap

37.

If the rating of a protective device is 20A (BS3036) and the following correction factors apply to a circuit Ca (0.94), Ci (0.88), Cg (0.85) and Cf (0.725) calculate the (It) the tabulated current carrying capacity required of the cable (abbreviation for the tabulated current carrying capacity of cable is: It)

a)

8.325A

b)

5.89

c)

34.52A

d)

39.23A

38.

Trunking bends and sets for angular work can be purchased ready-made. A craft worker still needs to know how to make bends and sets because

a)

It is considered good practice to make bends and sets as it is the mark of a worker who takes pride

b)

Some customers will insist that all bends and sets are created on site to reduce the cost of the installation

c)

Despite good planning an unexpected all or ventilation pipe can appear and delays will occur of the needed part is out of stock

d)

The job can be completed faster when bends and sets are made on site as they will always match the required profile

39.

Power track distribution systems are commonly associated with, but not limited to, which type of circuit?

a)

Underfloor power supplies to lighting circuits

b)

Underfloor power supplies to socket outlets

c)

Overhead lighting circuits (industrial and commercial)

d)

Overhead lighting circuits (domestic)

40.

If the tabulated current carrying capacity of a Twin & Earth cable which has been clipped direct to a wall been calculated at 40A, using table F6 of the On-Site Guide work out what size cable is required?

a)

4mm²

b)

5mm²

c)

6mm²

d)

10mm²

41.

For outdoor lighting installations, equipment must be classified for which of these external influences? The cable factor is a 1.5mm cable is 27

a)

Ambient temperature

b)

Climatic conditions

c)

Vibration

d)

Presence of water

42.

The maximum volt drop in a lighting circuit is?

a)

5%

b)

4%

c)

3%

d)

10%

43.

An enclosure is labelled IP6X. What does this relate to?

a)

Whether the enclosure is dust tight

b)

The maximum ambient working temperature of the enclosure

c)

How resistant the enclosure is to vibration and other mechanical stresses

d)

The degree of protection from water that the enclosure has

44.

Using table F5 (ii) of the On-Site Guide, determine the volt drop for a 6mm² cable which has been installed through Reference Method C (clipped direct/single phase)?

a)

7.3 mV/A/m

b)

6.4 mV/A/m

c)

3.8 mV/A/m

d)

47 mV/A/m

45.

What is the cable type used for building management system networks?

a)

RJ45

b)

BCN

c)

ADSL

d)

Cat 5E

46.

What type of cable is used on a fire alarm system, where operation in a fire is required for prolonged period?

a)

MICC

b)

SWA

c)

Glass fibre insulated

d)

Butyl rubber

47.

When selecting a power tool for a particular job it should be checked to see if

a)

It is too heavy to carry. If this is the case it should not be used for long periods of time

b)

The tool appears damaged or makes an unusual sound when running

c)

The cable is damaged. If this is the case it should be repaired with a suitable insulating tape before it is used

d)

It is available in the stores and can be booked out for use

48.

Before using laser level, precautions to be taken include

a)

Wearing a reflective vest

b)

Using dark glasses to the light intensity

c)

Not looking directly at the light source as this can cause blindness

d)

Looking directly at the light source to make sure that it is working

49.

Using Table B6 of the On-Site Guide determine what is the maximum loop impedance value for a Type B circuit breaker which is rated at 20A

a)

1.25Ω

b)

1.4Ω

c)

2.2Ω

d)

1.75Ω

50.

A fixing device used to hold conduit in place before plastering is known as

a)

Gravity toggle

b)

Butterfly clip

c)

Rawlbolt

d)

Crampet

51.

When does the 80% rule regarding loop impedance values apply?

a)

When using the On-Site Guide

b)

When using Guidance Note 3

c)

When using the Electricity at Work regulations 1989

d)

When using the Wiring Regulations

52.

A suitable fixing for conduit used outdoors is

a)

SWA cable cleat

b)

PVC cable cleat

c)

Steel saddle

d)

Galvanised saddle

53.

If the measured earth loop impedance of a circuit is 1.1Ω, and the maximum tabulated value in the On-Site Guide is 1.75Ω what does this mean regarding shock protection.

a)

Measured is less than 80% of the tabulated value therefore shock protection is not met

b)

Measured value is less than 80% of the tabulated value therefore shock protection is met

c)

Measured value is less than tabulated value therefore shock protection is met

d)

Measured value is less than the tabulated value therefore shock protection is not met

54.

Which of these fixings methods is suitable for holding a lightweight load on a plasterboard partition?

a)

Screw fixing using a plastic plug

b)

Cable clip

c)

Rawlbolt

d)

Spring toggle

55.

If the prospective fault current of a 230V domestic circuit is 560A, which of the following is correct?

a)

Zs = 2.434Ω

b)

Ze = 2.434Ω

c)

Zs = 0.4107Ω

d)

Ze = 0.4107Ω

56.

Surface mounted PVC cable should be run directly into an electrical accessory. The outer sheathing of the cable should be taken inside the accessory to a minimum of

a)

15mm

b)

20mm

c)

5mm

d)

10mm

57.

It is essential to make good structure of a building following electrical repair work

a)

By doing this it is certain that the customer will ask for further work to be done in the future

b)

So that any person used the room after work is completed is not complaining about draughts through the holes in the walls

c)

By using appropriate material before the job is signed off so that the general building structural performance and fire safety are not reduced

d)

Because the customer expects to see everything is neat and tidy and is looking exactly like it was before the work started.

58.

What is an overcurrent resulting from a fault of negligible impedance between conductors?

a)

Loop impedance

b)

Overload

c)

Fault current

d)

Short circuit

59.

What is meant by assessing Thermal constraint?

a)

A calculation to ensure that the size of the cpc is small enough to withstand a very large fault current over a short period of time.

b)

A calculation to ensure that the size of the line conductor is small enough to withstand a very large fault current over a short period of time.

c)

A calculation to ensure that the size of the line conductor is big enough to withstand a very large fault current over a short period of time.

d)

A calculation to ensure that the size of the cpc is big enough to withstand a very large fault current over a short period of time.

60.

What is a disadvantage of the fuse type pictured?

a)

Regular maintenance is required to ensure they operate

b)

They could possibly take twice their rating before blowing

c)

The fuse wire requires changing on a regular basis to ensure discrimination

d)

They can be fitted with the wrong size cartridge

61.

Which device combines both overload and earth fault protection?

a)

Rewireable fuse

b)

RCD

c)

RCBO

d)

MCB

62.

Where can the maximum fault current capacity of a domestic consumer unit main switch be found?

a)

BS 7671

b)

Written on the test sheet

c)

On Site Guide

d)

Written on the device

63.

What is the maximum disconnection time for a 32Amp MCB on a 230V ac, TN supply?

a)

0.3 seconds

b)

4 seconds

c)

0.4 seconds

d)

5 seconds

64.

Identify the correct symbol for the rating of the 'tabulated current', where correction factors have had to be applied

a)

z

b)

In

c)

It

d)

Ib

65.

An intermediate switch used in some lighting circuits has how many terminals?

a)

Two

b)

Three

c)

Six

d)

Four

66.

What is the minimum cross sectional area of the live conductors used for a radial power circuit, protected by a 20A circuit breaker and covering an area of 40m²?

a)

4.0mm²

b)

2.5mm²

c)

1.5mm²

d)

1.0mm²

67.

Immersion heaters should be supplied from

a)

Their own separate circuit

b)

A 13Amp socket outlet

c)

A switched spur connected from a ring final circuit

d)

A lighting junction box

68.

The distribution circuit to a sub main of a TN system, has an allowed maximum disconnection time of what, under fault conditions?

a)

1s

b)

0.2s

c)

0.4s

d)

5s

69.

When hard wiring interconnected fire detectors using 3 core and earth PVC cable. What colour core is used for the interconnect lead?

a)

Black

b)

Yellow/green

c)

Grey

d)

Brown

70.

Identify the device that operates using only the 'thermal' effect.

a)

BS88-2

b)

RCD

c)

BSEN 61009

d)

BSEN 60898