wayground logo

Lembar Kerja Gratis yang Dapat Dicetak

BARU

Ukuran huruf

S
M
L
XL
Lembar kerja

Technical quiz 5

Total soal: 10

Worksheet time: 5mins

Nama
Kelas
Tanggal
1.

Find the correct Trip valve model for the given condition. 

a)

377D

b)

377U

c)

377CCW

d)

377CW

2.

Find the fail action for the given hook-up. 

a)

Fail open

b)

Fail close

c)

Fail Lock in Last position

3.

Which two ports from 377L Trip valve should connect with DVC?

a)

Port F&C

b)

Port B&E

c)

Port A&D

d)

Port D&B

4.

Which two ports from 377U Trip valve should connect with actuator?

a)

Port A&D

b)

Port D&B

c)

Port F&C

d)

Port B&E

5.

In 377L Trip Valve which two ports should Plug?

a)

Port F&C

b)

Port A&D 

c)

Port B&E

d)

Port D&B

6.

Where to connect volume tank in 377U? 

a)

Port A 

b)

Port F  

c)

Port C

d)

Port D

7.

Which switching valve will connect to VOLUME Tank to achieve fail close on-air failure with PDTO configuration? 

a)

A

b)

B

8.

Find the valve position for below condition. VALVE CONFIGURATION CW TO CLOSE.

a)

CLOSE

b)

OPEN

9.

Find the correct solenoid state for the condition below

a)

energize 

b)

de-energize

10.

Find the correct solenoid state for the given condition

a)

energize

b)

de-energize