Construction Industry and Sustainabillty

Total questions: 30

Worksheet time: 30mins

Name
Class
Date
1.

James is developing a new housing estate for a local housing association to address a shortage of homes in a struggling community. Some of these homes will be sold as leasehold. (a) State two disadvantages of leasehold for homeowners.

a)

Limited ownership duration and potential for increased ground rent

b)

Full ownership and no additional fees

c)

No restrictions on property modifications

d)

Ownership of the land and property

2.

Concurrent ownership of houses on a new housing estate occurs when:

a)

Multiple parties have ownership rights simultaneously.

b)

A single party has exclusive ownership rights.

c)

Ownership is transferred from one party to another.

d)

The estate is owned by a corporation.

3.

A housing association intends to make some of the new houses from a development available to first time buyers. Which of the following is a benefit of equity loans for first-time buyers?

a)

Lower interest rates

b)

No down payment required

c)

Shared ownership with the lender

d)

Increased borrowing capacity

4.

The housing association has specified that they would like the houses to be innovative and stand out from other local properties. Which approach could be taken to produce innovative designs for the houses, select one answer?

a)

Use traditional architectural styles

b)

Incorporate sustainable materials and technologies

c)

Replicate existing local designs

d)

Minimize customization and personalization

5.

One reason why it is important that there are clear lines of communication between members of a design team during the initial stages of a project is:

a)

To ensure that all team members are aware of the project goals and objectives.

b)

To allow team members to work independently without interference.

c)

To reduce the need for meetings and discussions.

d)

To limit the exchange of ideas and creativity.

6.

What would be a benefit of using layers when producing CAD drawings for contractors?

a)

Improved organization and clarity

b)

Easier error detection

c)

Faster rendering times

d)

Reduced file size

7.

One way that the designer could ensure that wheelchair users have full accessibility to the health centre in line with the requirements of the Equality Act is:

a)

Installing ramps at all entrances

b)

Providing valet parking

c)

Offering free health check-ups

d)

Hiring more staff

8.

Select two benefits of using a biomass fuelled heating system for heating the accommodation block.

a)

Bio-mass is totally carbon neutral

b)

Bio-mass is a more sustainable way of heating

c)

Bio-mass releases zero carbon

d)

Bio-mass reduces carbon emissions

9.

A design and build developer has purchased a brownfield site. The developer plans to develop the site to include: - new family houses - open green spaces - community leisure facilities. (a) The new homes are specified to have a level of finish that would result in a build cost of £375,000. The developer aims to make a 10% profit. The current top selling price for this type of property in the area is £400,000. Select why the developer would be taking a commercial risk if they choose to build housing to this specification.

a)

A good profit margin for a construction company would range between 15% to 20% for net profit margins commercial risk is low

b)

Houses prices/material costs, also delays are prone to fluctuation so there would be a reasonable degree of commercial risk.

c)

So the potential profit is 25% which gives a a 5% deficit.

d)

So the potential profit is 25% so there is no risk.

10.

Materials for re-development will be sourced from a wide supply chain. Explain one benefit of supply chain integration for the mixed use development.

a)

Reduced quality control

b)

Data Systems In-compatibility

c)

Reduced costs

d)

Set prices for materials

11.

A new housing estate will be constructed with brick and block cavity walls. Select an answer that enables the contractor to manage the waste produced during construction activities so that the impact on the environment is reduced.

a)

Ensure a SWMP is in place

b)

Ensure that all waste contractors hold a waste carriers license

c)

Make sure on-site toilets are cleaned weekly

d)

Use a seperate waste skip system

12.

Earthworks will need to be completed on site before a community leisure facilities can be built. The total volume of material that needs to be excavated is 1495 m³. The developer has received quotations from two groundwork contractors, A and B. Contractor A can complete the groundworks in 12 hours. Contractor B can complete the groundworks in 7 hours. Due to delays in being able to access this part of the site, the developer has decided to employ both contractors to work at the same time to complete the groundworks. Calculate the volume of materials that Contractor A would remove from the site during the groundworks. select your answer to three significant figures.

a)

692.2m3

b)

622.9m3

c)

213.57m3

d)

124.58m3

e)

14.95m3

13.

A developer is considering using Sustainable Urban Drainage Systems (SUDS) on part of the development site. This part of the site will be used for family housing and is shown in Figure 3. Select TWO answers that prove the suitability of SUDS for this part of the development.

a)

SUDS can add Bio-diversity to a site

b)

SUDS are a sustainable alternative allow rainwater to be used as drinking water

c)

SUDS are a sustainable alternative to reuse rainwater

d)

SUDS are a sustainable alternative to reuse rainwater

e)

SUDS eliminate flooding altogether

14.

A client has commissioned a contractor to design and build a new commercial building. The project will involve a number of specialist sub-contractors who will need to be co-ordinated by the project manager when they install the sustainable technologies in the new house. Select one recognised method of conflict management that the project manager could use if sub-contractors are not able to effectively co-ordinate their activities on site.

a)

Communicate with client all issues and set up meeting

b)

Ensure each party have a copy of the Programme of works

c)

Mediation meeting with client and all parties concerned

d)

Trip to the pub to discuss issues

15.

Before starting construction of the house the contractor has commissioned a bore-hole report of the site. The results from the bore-hole report are shown in Table 1.

Select one way that the information in the report in Table 1 will affect the design of the foundations of the new house.

a)

The borehole report has identified stable sub-soil with the water table below this level, which will have an effect on foundation design

b)

The borehole report has identified unstable sub-soil which will have an effect on foundation design

c)

The borehole report has identified unstable sub-soil which will effect foundation design

d)

The borehole report has identified stable sub-soil but the water table will effect foundation design

16.

The foundations of the new house will be constructed from reinforced concrete. The concrete will be delivered to the site by a local ready-mix concrete supplier. Select two disadvantages of using Just In Time (JIT) for the delivery of concrete for the foundations of the house.

a)

There maybe a mistake made on amounts of concrete required, therefore JIT will be effective

b)

There maybe a change in weather conditions and concrete is unable to be cancelled

c)

There maybe a delay in setting up of pour, therefore JIT will be effective

d)

There maybe a a breakdown in communications and the wrong concrete is sent

17.

What are the three R's in waste handling?

a)
replenish, restore, and reject
b)
reduce, reuse, and recycle
c)
reclaim, repurpose, and refuse
d)
renew, repurpose, and reject
18.

What type of projects are classed as infrastructure?

a)
Transportation, communication, water, and energy systems
b)
Agricultural projects
c)
Healthcare projects
d)

House building

19.

what utilities are a building connected to?

a)
water, electricity, and cable
b)
internet, phone, and heating
c)
garbage collection, internet, and cable
d)
water, electricity, gas, and sewage
20.

Which job roles and trades are involved in civil engineering projects?

a)
Doctors and nurses
b)

Digger drivers

c)

civil engineers, structural engineers, surveyors, construction managers, and tradespeople

d)

bricklayers and carpenters

21.

what types of projects are undertaken as part of civil engineering?

a)

Building homes

b)
Construction of buildings, bridges, roads, dams, and other infrastructure
c)

construction of tall buildings

d)
Designing computer software
22.

Which of the following is a key consideration when planning the layout of a new housing development?

a)

Color of the exterior paint

b)

Number of floors in each house

c)

Availability of luxury materials

d)

Proximity to local amenities

23.

What is one advantage of using Building Information Modeling (BIM) in construction projects?

a)

Increased project costs

b)

Improved collaboration among stakeholders

c)

Longer project timelines

d)

Reduced need for skilled labor

24.

Which factor is most likely to influence the choice of materials for a sustainable building project?

a)

Cost of materials

b)

Availability of materials

c)

Popularity of materials

d)

Environmental impact of materials

25.

What is one potential disadvantage of using prefabricated materials in construction projects?

a)

Lower labor costs

b)

Improved quality control

c)

Limited design flexibility

d)

Reduced construction time

26.

Which of the following is a common method for improving energy efficiency in residential buildings?

a)

Installing single-pane windows

b)

Using incandescent light bulbs

c)

Adding insulation to walls and roofs

d)

Increasing the size of HVAC systems

27.

What is a key benefit of using green roofs in urban areas?

a)

Higher maintenance costs

b)

Improved air quality

c)

Reduced biodiversity

d)

Increased urban heat island effect

28.

What is a common challenge faced when implementing green infrastructure in urban areas?

a)

Low population density

b)

High biodiversity

c)

Excessive rainfall

d)

Limited space availability

29.

Which of the following is a primary goal of sustainable urban development?

a)

Decreasing public transportation options

b)

Maximizing short-term profits

c)

Reducing environmental impact

d)

Increasing urban sprawl

30.

What is a potential benefit of using modular construction techniques?

a)

Reduced design flexibility

b)

Higher labor costs

c)

Faster project completion

d)

Increased construction waste