Font size
WorksheetsAMT10503 (23-24) Quiz 2
Total questions: 25
Worksheet time: 12mins
Industrial Revolution during the 1870's known as ...
IR 1.0 Mechanical Production
IR 2.0 Mass Production and New Form of Energy
IR 3.0 Digital Technologies
IR 4.0 Cyber Physical System
Construction 3.0 is about ...
Machine Learning / Smart Automation (such as IoT, Big Data)
Semi-automation (such as 2D CAD)
Mechanization (such as manual drawing)
Automation (such as BIM, 3D drawing)
The key technology of United Kingdom Build Environment 2050 are as follows, except ...
Autonomous Plants
BIM
Self Healing Materials
Self Assembly
One of the key focus area for Singaporean Construction Industry Transformation MAP (ITM) are ...
Financial Incentives
Professionalization
Building Green
Innovation
CIDB has established few blue print towards improving the construction industry especially in terms of digitalizing the industry.
What are the blue print established by the CIDB between 2016 -2020?
Construction 4.0 Strategic Plan
Construction Industry Transformation Plan (CITP)
Construction Industry Malaysia Plan (CIMP)
Industry Transformation Map (ITM)
Towards achieving the objectives of Construction 4.0 Strategic Plan, CIDB has outlined the technologies that are targeted to be implemented based on short, medium and long term.
The following technologies are included in long term target, except ...
Blockchain
Virtualization
3D printing
Artificial Intelligent
IoT was coined by ... in 1999
Kevin de Bruyne
Kevin Ahsworth
Berners Lee
Kevin Ashton
What is the primary purpose of Building Information Modeling (BIM) in the construction industry?
To facilitate collaboration and communication among project stakeholders
To manage basic infrastructure elements efficiently
To create business information models for financial analysis
To oversee building information management processes
What are the key features of Building Information Modeling (BIM)?
3D visualization, clash detection, cost estimation, collaboration
2D visualization, material selection, time tracking
Energy efficiency analysis, structural engineering, project management
Virtual reality integration, marketing strategies, supply chain optimization
There is 7 dimension (7D) in BIM. The 5D is about ...
Facilities Management
Costing
Time Management
Performance
BIM implementation requires four elements except
Process
People
Technology
Policy
Time
Virtual Reality (VR) is ...
real world with digital information overlay
completely virtual environment
real and virtual are interwined
Extended Reality or XR was firstly used by .... in 1960's in film industry.
Charles Xavier
Michael Jordan
Charles Jordan
Charles Wyckoff
UAS can be used in the construction project for the following construction phase except ...
Site Inspection
Building Design
Building Inspection
Site Surveying
Benefits can be gained in using current technology such as BIM, IoT, VR, and AR in construction are ...
Detect the design conflict between architecture, CnS and MnE
Increase the possibility to meet 'just in time'
Totally replace the man power at the site
Track the construction progress
Challenges in adopting current technologies in construction are ...
investment in providing skilled workers
availability of technology
standardization and and uniformity
good quality consultants
IoT comprises of 3 components; Physical, Smart and Connectivity Components. SMART COMPONENTS refer to ..........
comprise the product's mechanical and electrical part
amplifies the capabilities and value of smart components
amplify the capabilities and value of the physical components
all above
The benefits of IoT application in the construction industry as as follows EXCEPT:
Completely replace human resources
Enable Just-In-Time
Track tool and equipment
Power saving
THREE (3) elements of IoT are ........
Physical component - smart component - connectivity component
Sensor - Connectivity - People & Process
Monitoring - Optimizing - Controlling
IoT - CPS - Ind. Internet Industry 4.0
There are 3 level of BIM revolution. Level 2 BIM refers to ..........
2D combine with 3D
Computer Aided Design
Full Collaboration
Additional Dimension includes Time Management and Budget Calculation
Common TERMS in the BIM world are as follows EXCEPT:
Smart Digital Model
Clash Detection
Human Interference
Computational Design
Level of Development or known as LOD in BIM up to LOD500. LOD 200 refers to ..........
graphically represented in the model as a specific system, object in terms of quantity, size, shape, location and orientation [PRECISE GEOMETRY]
graphically represented in the model as a specific system, object in terms of quantity, size, shape, location, orientation, detailing fabrication and installation information [FABRICATION]
graphically represented in the model as a specific system, object in terms of quantity, size, shape, location and orientation [PRECISE GEOMETRY]
the model element is graphically represented in the model as a generic system, object [APPROXIMATE GOEMETRY]
"Completely digital environment".
This statement refers to ..........
Augmented Reality
Virtual Reality
Mixed Reality
all above
75% virtual and 25% real world or known as FULLY IMMERSES world refers to ..........
Virtual Reality
Augmented Reality
Mixed Reality
All above
UAS can be used in the construction project for the following construction phase EXCEPT ...
Site Surveying
Site Inspection
Building Inspection
Building Design
